The Gawler line, also known as the Gawler Central line, is a suburban commuter railway line in the city of Adelaide, South Australia. The Gawler Line is the most frequent and heavily patronised line in the Adelaide rail network.
History
The line was opened in 1857 from Adelaide to Gawler.[2][3] It was extended to Kapunda in 1860. Branches were later built from Gawler to termini in Angaston, Truro, Morgan, Robertstown, Peterborough, Spalding and Gladstone. Between Adelaide and Salisbury, the two broad gauge lines are paralleled by one standard gauge line on the Adelaide to Port Augusta line. A little north of Salisbury the standard gauge line heads north-west. From Salisbury to Gawler there are two broad gauge tracks, with a single broad gauge track north of Gawler.
South of Gawler, there were branches to the Holden factory at Elizabeth South, the Penfield railway line which serviced the former munitions factory and other Defence facilities in the area now called Edinburgh. The Port Pirie line which branched from the Gawler line at Salisbury railway station until it was converted to standard gauge, with a new track laid alongside the broad gauge tracks. Prior to 1987, at Dry Creek, the Dry Creek-Port Adelaide railway line branched west, and the Northfield railway line used to branch east. In the mid 2000s, a new station was built at Mawson Lakes.
Renewal and electrification
In 2008, the State Government announced a plan to rebuild the Gawler line, in preparation for the line to be electrified with the Federal Government also to provide funding.[4] The track was removed, and the track bed, sleepers and track renewed. Dual gauge sleepers were laid to allow for the line to be converted to standard gauge at a future date. The line was closed between North Adelaide and Mawson Lakes for four months from June 2010 for this work to be performed, and between Mawson Lakes and Gawler Central stations for seven months from September 2011.[5][6][7] Following the withdrawal of Federal Government funding by the then newly elected Abbott Liberal-National government, the electrification was postponed in October 2013.[8]
In February 2011, a new Adelaide Metro railcar depot opened to the east of Dry Creek station, to replace the facility behind the new Royal Adelaide Hospital site and Adelaide station.[9] The depot is the major maintenance and re-fuelling facility for the diesel train fleet, with capacity to store 70 railcars with over 11 kilometres of track. The depot has been designed to allow future conversion to support electric rolling stock.
To facilitate work on the Torrens Rail Junction in 2017, the Gawler line between Adelaide and Mawson Lakes was closed from 1–15 October and 18 November to 5 December.[10]
Following a decade of on-again, off-again talks,[11] electrification of the Gawler line was announced in 2018. The announcement only promised Stage 1 electrification as far as Salisbury with works anticipated to commence in 2018.[12] A $220 million grant from the Federal Government allowed for Stage 2 electrification for the remainder of the line to proceed.[13] Works began in November 2019 with completion anticipated in 2021.[14] Contrary to the Seaford line electrification, which saw the line closed completely for 11 months, from October 2020 onward, main construction on the Gawler line was spread out across a rolling schedule of partial and full line closures across 12 months. Early works before October 2020 were spread across smaller closures, typically at nights and on weekends.
The entire line was closed in December 2020. It was intended to reopen in November 2021 but was delayed due to restrictions regarding the COVID-19 lockdown in July.[15][16] The line was expected to reopen around 30 April 2022, but following the state election in March, the reopening was pushed back to the end of June.[17]
The line was reopened on 12 June 2022.[18] A majority of services on the line are now operated by 4000 class trains, however, 3000/3100 class trains continue to operate select services while the delivery of new 4000 class train sets continues.
Torrens Road Overpass
In 2021, the Australian and South Australian governments announced that the Torrens Road level crossing would be removed, at a cost of $196 million.[19] The Torrens Road level crossing was previously identified as one of the most high risk crossings in Adelaide, in part due to it being both a passenger rail, and freight rail crossing.[20] Earlier, in 2020, an investigation was launched after a freight train passed through the level crossing without activating the crossing boomgates.[21]
In 2023, the Torrens Road overpass was officially opened. As part of the project, a new public park was constructed underneath the overpass, and the adjacent Ovingham railway station was rebuilt. [22][23]
Route
The line runs from Adelaide station north via Prospect, Mawson Lakes, Salisbury, Elizabeth and Smithfield to the town Gawler on the outer northern metropolitan fringe. The line is Шаблон:Convert in length and is the longest of the Adelaide suburban railway lines.
Like the rest of the Adelaide suburban passenger rail network, the line is Шаблон:RailGauge broad gauge for its entire length. The Australian Rail Track Corporation's standard gauge Adelaide to Port Augusta line runs parallel to the route from the Adelaide Gaol triangle to Salisbury, then turns north west towards Virginia.
Line guide
colspan=7 style=background:#Шаблон:Rcr|Gawler Line | ||||
---|---|---|---|---|
Name | Distance from Adelaide |
Year opened | Serving suburbs | Connections |
Шаблон:Rwsa | 0.0 km | 1856 | Adelaide | Шаблон:Rail color box Шаблон:Rail color box Шаблон:Rail color box Шаблон:Rail color box Шаблон:Rail color box Шаблон:Ric Bus Шаблон:Ric Tram |
Шаблон:Rwsa | 2.5 km | 1857 | North Adelaide | |
Шаблон:Rwsa | 3.6 km | 1880s | Ovingham, Renown Park | |
Шаблон:Rwsa | 4.9 km | 1915 | Dudley Park, Prospect | |
Шаблон:Rwsa | 6.0 km | Шаблон:Unknown | Dudley Park, Prospect | |
Шаблон:Rwsa | 7.7 km | 1915 | Kilburn | |
Шаблон:Rwsa | 10.6 km | 1856 | Dry Creek | |
Шаблон:Rwsa | 14.3 km | 2006 | Mawson Lakes | Шаблон:Ric Bus |
Шаблон:Rwsa | 15.1 km | 1969 | Parafield Gardens | |
Шаблон:Rwsa | 16.6 km | 1968 | Parafield Gardens | |
Шаблон:Rwsa | 17.7 km | 1928 | Parafield, Parafield Gardens | |
Шаблон:Rwsa | 18.6 km | Шаблон:Unknown | Salisbury Downs, Salisbury South | |
Шаблон:Rwsa | 20.2 km | 1857 | Salisbury | Шаблон:Ric Bus |
Шаблон:Rwsa | 21.5 km | 1950 | Elizabeth South, Salisbury | |
Шаблон:Rwsa | 24.0 km | 1955 | Elizabeth South | |
Шаблон:Rwsa | 25.8 km | 1960 | Elizabeth | Шаблон:Ric Bus |
Шаблон:Rwsa | 27.3 km | 1950 | Edinburgh North, Elizabeth North | |
Шаблон:Rwsa | 28.2 km | 1950s | Davoren Park, Elizabeth North | |
Шаблон:Rwsa | 30.2 km | 1857 | Smithfield | Шаблон:Ric Bus |
Шаблон:Rwsa | 32.2 km | 1978 | Munno Para | Шаблон:Ric Bus |
Шаблон:Rwsa | 34.1 km | 1959 | Kudla | |
Шаблон:Rwsa | 37.4 km | 1947 | Evanston Gardens | |
Шаблон:Rwsa | 38.3 km | Шаблон:Unknown | Evanston | |
Шаблон:Rwsa | 39.3 km | 1913 | Evanston | |
Шаблон:Rwsa | 39.8 km | 1857 | Gawler South, Gawler West | Шаблон:Ric Bus Шаблон:Ric Regional Coach |
Шаблон:Rwsa | 41.4 km | Шаблон:Unknown | Gawler | |
Шаблон:Rwsa | 42.2 km | 1911 | Gawler |
Services
Commuter
All suburban rail passenger services are operated by Adelaide Metro. In April 2008, new timetables were introduced on the Gawler line in an effort to boost efficiency. Shorter secondary services that terminated at Dry Creek and Salisbury were withdrawn, new limited express services were introduced, and a new Hi-Frequency station policy adopted.[24] Nearly all services either start or terminate their journey at Gawler or Gawler Central stations, apart from a morning peak express service that begins its journey at Salisbury.[24]
Under this policy, the Hi-Frequency stations (Islington, Mawson Lakes, Parafield, Salisbury, Elizabeth, Smithfield, Tambelin and Gawler) have services every 15 minutes from Monday to Friday. All other stations have a 30-minute service. This is in addition to several peak hour express services that stop only at selected Hi-Frequency stations.[24]
On weekends and public holidays, services operate with a 30-minute frequency at all stations, with the exception of North Adelaide.[24]
Until April 2008, most services along the line were operated by 3000 class railcars. With the introduction of the new timetable, 2000 class railcars became more frequent, especially during peak hour. The 2000 class railcars were retired in August 2015.[25]
Freight
Freight is a major factor along this transport corridor, with the Australian Rail Track Corporation's standard gauge Adelaide to Port Augusta line running parallel to the broad gauge track between Adelaide and Salisbury. Since 1984, this line has been standard gauge and had no interface with the suburban lines. Bowmans Rail, One Rail Australia, Pacific National, SCT Logistics, and Journey Beyond operate services via the line. Journey Beyond operates The Ghan and the Indian Pacific passenger trains along this section. Until 2007, grain trains operated from Roseworthy to Port Adelaide. The last freight service on the Gawler line was the Penrice Stone Train, which operated to Penrice until it ceased operating in June 2014.[26]
References
External links
- Gawler Central to City – Adelaide Metro website
- Gallery of track refurbishment work: Adelaide to Mawson Interchange 2010 Johnny's Pages
- Gallery of track refurbishment work: Mawson Lakes to Gawler 2011 Johnny's Pages
- Gallery of track refurbishment work: Mawson Lakes to Gawler 2011–2012 Шаблон:Webarchive Johnny's Pages
- Gallery of track refurbishment work: Gawler to Gawler Central 2012 Шаблон:Webarchive Johnny's Pages
- Gallery of electrification work: Adelaide to Gawler 2012 Johnny's Pages
Шаблон:Adelaide Metro railway stations Шаблон:Adelaide public transport
- ↑ Railway bridge over the Little Para River – Photograph Шаблон:Webarchive State Library of South Australia Retrieved 16 December 2019
- ↑ Bassett Town & the Railway Шаблон:Webarchive Town of Gawler
- ↑ Шаблон:Cite AHD
- ↑ 2008/09 State Budget Шаблон:Webarchive South Australian Department of Treasury & Finance June 2008
- ↑ Gawler Line Reconstruction Шаблон:Webarchive Coleman Rail
- ↑ Gawler Line timetable Шаблон:Webarchive Adelaide Metro
- ↑ Rail Revitalisation Gawler Line Шаблон:Webarchive Department for Transport, Energy & Infrastructure
- ↑ Federal Government pulls plug on $76m Gawler Line electrification Шаблон:Webarchive Adelaide Advertiser 24 October 2013
- ↑ Railcar Depot Relocation Шаблон:Webarchive Department of Planning, Transport & Infrastructure
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ 24,0 24,1 24,2 24,3 Gawler timetable Шаблон:Webarchive Adelaide Metro, 4 February 2013
- ↑ "Limited life for 2000 class Jumbo railcars" Railway Digest January 2015 page 20
- ↑ Penrice soda ash plant at Osborne closing Шаблон:Webarchive ABC News 25 June 2014