Opened in 2019, with a total length of Шаблон:Convert, Hatania Doania Bridge is the second extradosed cable-stayed bridge in West Bengal. It was the first bridge to be built across the Hatania Doania River. Named after the Hatania Doania River, it cost ₹2.26 billion to build.
History
Construction of the bridge began in February 2014. The construction of the bridge was completed in 2019. The bridge is a joint initiative of the Government of West Bengal and the Government of India. Arup Biswas inaugurated the bridge on March 7, 2019.[2]
Architectural features
Hatania Doania Bridge is an extradosed cable-stayed bridge, with 40 cables in a fan arrangement, built using steel pylons Шаблон:Convert high. The deck is made of composite concrete box segment with one carriageway. The total width of the bridge is Шаблон:Convert, with one lanes in each direction and a Шаблон:Convert-wide footpath on each side. The deck over the main span is Шаблон:Convert long. The two side spans are supported by parallel wire cables and are Шаблон:Convert long.[3]