Английская Википедия:135th Street station (IRT Lenox Avenue Line)

Материал из Онлайн справочника
Версия от 08:58, 18 декабря 2023; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|New York City Subway station in Manhattan}} {{Other uses|135th Street (disambiguation){{!}}135th Street}} {{Use mdy dates|date=August 2023}} {{Use American English|date=August 2023}} {{Infobox NYCS | name = 135 Street | accessible = yes | bg_color = #E20F00 | image = 135 St NB plat FC jeh.jpg | image_caption = Northbound platform | address = West 135th Street &...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Other uses Шаблон:Use mdy dates Шаблон:Use American English Шаблон:Infobox NYCS

The 135th Street station is a station on the IRT Lenox Avenue Line of the New York City Subway. Located at the intersection of 135th Street and Lenox Avenue in Harlem, it is served by the 2 and 3 trains at all times.

The 135th Street station was constructed for the Interborough Rapid Transit Company (IRT) as part of the city's first subway line, which was approved in 1900. Construction on the tunnel segment that includes the 135th Street station started on October 2 of the same year. The station opened on November 23, 1904. The station platforms were lengthened in 1910.

The 135th Street station contains two side platforms and three tracks. The station was built with tile and mosaic decorations. The platforms contain exits to Lenox Avenue's intersection with 135th Street and are not connected to each other within fare control. The platforms contain elevators from the street, which make the station compliant with the Americans with Disabilities Act of 1990.

History

Construction and opening

Planning for a subway line in New York City dates to 1864.[1]Шаблон:Rp However, development of what would become the city's first subway line did not start until 1894, when the New York State Legislature passed the Rapid Transit Act.[1]Шаблон:Rp The subway plans were drawn up by a team of engineers led by William Barclay Parsons, the Rapid Transit Commission's chief engineer. It called for a subway line from New York City Hall in lower Manhattan to the Upper West Side, where two branches would lead north into the Bronx.[2]Шаблон:Rp A plan was formally adopted in 1897, and legal challenges were resolved near the end of 1899.[1]Шаблон:Rp The Rapid Transit Construction Company, organized by John B. McDonald and funded by August Belmont Jr., signed the initial Contract 1 with the Rapid Transit Commission in February 1900,[3] in which it would construct the subway and maintain a 50-year operating lease from the opening of the line.[1]Шаблон:Rp In 1901, the firm of Heins & LaFarge was hired to design the underground stations.[2]Шаблон:Rp Belmont incorporated the Interborough Rapid Transit Company (IRT) in April 1902 to operate the subway.[1]Шаблон:Rp

The 135th Street station was constructed as part of the IRT's East Side Branch (now the Lenox Avenue Line). Farrell & Hopper began building the section from 110th Street to 135th Street on August 30, 1900, subcontracting the section north of 116th Street to John C. Rodgers.[3][4]Шаблон:Rp The excavation was relatively easy because the subway was under one side of Lenox Avenue and there were no street railway tracks to work around.[4]Шаблон:Rp

On November 23, 1904, the East Side Branch opened to 145th Street.[5][6] Initially, the station was served by East Side local and express trains. Local trains ran from City Hall to Lenox Avenue (145th Street). Express trains had their southern terminus at South Ferry or Atlantic Avenue and had their northern terminus at 145th Street or West Farms (180th Street).[7] Express trains to 145th Street were eliminated in 1906, and West Farms express trains operated through to Atlantic Avenue in Brooklyn.[8]

Service changes and station renovations

Файл:135 Lenox IRT sta jeh.JPG
Northbound street stair and elevator

To address overcrowding, in 1909, the New York Public Service Commission proposed lengthening the platforms at stations along the original IRT subway.[9]Шаблон:Rp As part of a modification to the IRT's construction contracts made on January 18, 1910, the company was to lengthen station platforms to accommodate ten-car express and six-car local trains. In addition to $1.5 million (equivalent to $Шаблон:Inflation million in Шаблон:Inflation/year) spent on platform lengthening, $500,000 (equivalent to $Шаблон:Inflation million in Шаблон:Inflation/year) was spent on building additional entrances and exits. It was anticipated that these improvements would increase capacity by 25 percent.[10]Шаблон:Rp The platforms at the 135th Street station were extended Шаблон:Convert to the north and Шаблон:Convert to the south.[10]Шаблон:Rp On January 23, 1911, ten-car express trains began running on the East Side Branch.[9]Шаблон:Rp[11]

In 1918, the Broadway–Seventh Avenue Line opened south of Times Square–42nd Street, and the original line was divided into an "H"-shaped system. Local trains were sent to South Ferry, while express trains used the new Clark Street Tunnel to Brooklyn.[12]

The city government took over the IRT's operations on June 12, 1940.[13][14] The IRT routes were given numbered designations with the introduction of "R-type" rolling stock. These fleet contained rollsigns with numbered designations for each service. The first such fleet, the R12, was put into service in 1948.[15] The route to White Plains Road, formerly the route to West Farms, became known as the 2, while the route to Lenox Avenue–145th Street became the 3.[16] The New York City Transit Authority (NYCTA) announced plans in 1956 to add fluorescent lights above the edges of the station's platforms.[17] In 1959, all 2 and 3 trains became express.[18]

Starting on March 2, 1998, the tunnel was reconstructed along with the cracked tunnel floor. This was done to correct a major water problem that had existed for many years due to the presence of the Harlem Creek and other underground streams, which caused extensive flooding, water damage, and seepage problems that occasionally contributed to severe service disruptions.[19][20] The project cost $82 million and was finished on October 12, 1998.[19][21] During the reconstruction, many Шаблон:NYCS trains were rerouted via the IRT Lexington Avenue Line, while the Шаблон:NYCS trains were rerouted to the 137th Street–City College station on the IRT Broadway–Seventh Avenue Line. Each of the two Lenox Avenue Line tracks were alternately taken out of service and supplemental shuttle bus service connecting to other lines in the area were provided for much of this time.[22][23]

Station layout

Ground Street level Entrance/exit
Шаблон:NYCS Platform Layout access
Platform level Side platform Шаблон:Access icon
Northbound Шаблон:Rint toward Шаблон:Stl (Шаблон:Stl)
Шаблон:Rint toward Шаблон:Stl (Шаблон:Stl)
Center track Шаблон:0 No regular service
Southbound Шаблон:0 Шаблон:Rint toward Шаблон:Stl (Шаблон:Stl)
Шаблон:0 Шаблон:Rint toward Шаблон:Stl (Шаблон:Stl late nights) (125th Street)
Side platform Шаблон:Access icon

The station has three tracks and two side platforms; the center track is not used in regular service.[24] The 2 and 3 trains stop here at all times.[25][26] The next stop to the south is 125th Street, while the next stop to the north is 149th Street–Grand Concourse for Шаблон:NYCS White Plains south trains and 145th Street for Шаблон:NYCS Lenox north trains.[27] The platforms were originally Шаблон:Convert long, like at other stations north of 96th Street.[2]Шаблон:Rp[28]Шаблон:Rp The platform extensions are at the north ends of the original platforms.[28]Шаблон:Rp Fare control is at platform level. There are no crossovers or crossunders between the two side platforms to allow free transfer between directions.

The northbound outer track merges with the center track just north of the station and the center track merges with the southbound outer one just south of the station. North of the station, a diamond crossover allows trains to switch between the two tracks. At the 142nd Street Junction, the 2 train provides service to the Bronx via the IRT White Plains Road Line while the 3 continues on the IRT Lenox Avenue Line to 145th Street and Harlem–148th Street.[24]

Design

Файл:135th Street IRT Lenox Ave; Standard Mosaic.JPG
A surviving original name tablet
Файл:135th Street IRT Lenox Ave; Mosaic and Decorative Bust.JPG
Newer name tablet

As with other stations built as part of the original IRT, the station was constructed using a cut-and-cover method.[4]Шаблон:Rp The tunnel is covered by a "U"-shaped trough that contains utility pipes and wires. The bottom of this trough contains a foundation of concrete no less than Шаблон:Convert thick.[28]Шаблон:Rp The platforms consist of Шаблон:Convert concrete slabs, beneath which are drainage basins. The original platforms contain circular, cast-iron Doric-style columns spaced every Шаблон:Convert, while the platform extensions contain I-beam columns. Additional columns between the tracks, spaced every Шаблон:Convert, support the jack-arched concrete station roofs.[2]Шаблон:Rp[28]Шаблон:Rp There is a Шаблон:Convert gap between the trough wall and the platform walls, which are made of Шаблон:Convert-thick brick covered over by a tiled finish.[28]Шаблон:Rp

The original decorative scheme consisted of blue/green tile station-name tablets, violet tile bands, a white terracotta cornice, and green terracotta plaques.[28]Шаблон:Rp The mosaic tiles at all original IRT stations were manufactured by the American Encaustic Tile Company, which subcontracted the installations at each station.[28]Шаблон:Rp The decorative work was performed by tile contractor Manhattan Glass Tile Company and terracotta contractor Atlantic Terra Cotta Company.[28]Шаблон:Rp Many of the original name tablets have since been replaced with newer renditions, but most of the plaques remain intact.

The 1995 artwork here is called Harlem Timeline by Willie Birch. It features mosaics of notable Harlem residents on the station platforms.[29] The one on the southbound side includes Adam Clayton Powell, Joe Louis, the Schomburg Center for Research in Black Culture, Charlie Parker, Clara Ward, and Louis Armstrong while one on the northbound side includes the Harlem Globetrotters, the NAACP, Abyssian Baptist Church, Cotton Club, and Randall's Island football team.[30]

Exits

Each platform has one same-level fare control area at the center, containing a turnstile bank, token booth, two stairs to street-level, and an elevator. The northbound platform has exits to the eastern corners of Lenox Avenue and West 135th Street and the southbound side has exits to the western corners of that intersection. The elevators make this station fully ADA-accessible. The elevator for the southbound platform leads to the southwestern corner of West 135th Street and Lenox Avenue, while the elevator for the northbound platform leads to the northeastern corner.[31]

References

Шаблон:Reflist

External links

Шаблон:Commons category

Шаблон:NYCS stations navbox by service Шаблон:NYCS stations navbox by line