Английская Википедия:Aust Severn Powerline Crossing
Шаблон:Short description Шаблон:Use dmy dates Шаблон:Use British English
Aust Severn Powerline Crossing is the longest overhead power line span in the United Kingdom with a length of Шаблон:Cvt.[1]
History
The crossing spans the River Severn between Aust and Beachley and is part of the National Grid.
It was commissioned in 1959,[2] and comprises two 275 kV electricity circuits, which form part of the 275 kV Iron Acton to Whitson line.[3]
Construction
It is situated south of the Severn Bridge and was built by J. L. Eve Construction, which became Eve Group, and is now Babcock Networks. It is mounted on two pylons, each Шаблон:Convert tall. The pylon on the Aust side of the River Severn stands on a caisson accessible via a small bridge.
Шаблон:KmlШаблон:PoI start Шаблон:PoI Шаблон:PoI Шаблон:PoI Шаблон:PoI end
See also
- List of spans
- Powerline river crossings in the United Kingdom
- Crossings of the River Severn
- Crossings of the River Wye
- Severn-Wye Cable Tunnel
References
Шаблон:Commons category Шаблон:Reflist Шаблон:National Grid Шаблон:River Severn Шаблон:Coord
- Английская Википедия
- Страницы с неработающими файловыми ссылками
- River Severn
- Towers in Gloucestershire
- Powerline river crossings
- Electric power infrastructure in England
- National Grid (Great Britain)
- Tidenham
- South Gloucestershire District
- Страницы, где используется шаблон "Навигационная таблица/Телепорт"
- Страницы с телепортом
- Википедия
- Статья из Википедии
- Статья из Английской Википедии