Английская Википедия:BRT Sunway Line
Шаблон:Short description Шаблон:EngvarB Шаблон:Use dmy dates Шаблон:Infobox rail line Шаблон:Maplink
The BRT Sunway Line is a bus rapid transit (BRT) line that is part of the Klang Valley Integrated Transit System servicing the southeastern suburbs of Petaling Jaya, Malaysia. It is the world's first all-electric Bus Rapid Transit system.[1]
This line is operated by Rapid Bus and was introduced in 2015 to service the high-density areas of Sunway and Subang Jaya, replacing an earlier proposal plan for the now defunct Sunway Monorail extension.
The BRT buses have an exclusive right-of-way on an elevated guideway that is not shared with normal road traffic. This specially-dedicated and grade separated guideway for BRT Sunway Line buses is almost similar to rapid transit elevated railways. However, bus operators other than Rapid Bus, do not have the rights to use it and there is no ramp available from at-grade roads to the elevated guideway.
This closed system is dedicated for a high volume of commuters to avoid congestion. However, this system can only be used along the Шаблон:Cvt track between Шаблон:Kstn and Шаблон:Lrts terminals that allow for passengers' interchange to rail transit.
The BRT system has received Шаблон:Color box Bronze rating by BRT Standard score from Institute for Transportation and Development Policy (ITDP).[2][3][4]Шаблон:Verify source
Line information
Halts
Bus Fleet
In February 2014, BYD won the bid to supply 15 new battery-run electric bus for Prasarana Malaysia. The buses use a lithium iron phosphate battery - which are non-toxic and have increased fire safety, in-wheel hub motors and regenerative braking. There are no caustic materials contained in the battery and no toxic electrolytes or heavy metals and the battery can be completely recycled. The source said that the buses are very quiet and ensures a comfortable ride without vibrations, jerks or noise associated with the conventional buses and combustion engines. The bus can also drive for more than Шаблон:Convert even in heavy city traffic on a single charge.[5][6] In September 2022, a driverless bus trial has been started that will run after hours. While initially not carrying any passengers, the aim is to allow for increased efficiency.[7]
Other information
Background
Bus rapid transit (BRT) is a transit system that uses dedicated bus lanes, universal access stations, integrated pedestrian access, rapid boarding and high service frequency. It is a fairly new concept in Malaysia although it has been implemented successfully in cities such as Bogotá, Colombia; Jakarta, Indonesia, and Curitiba, Brazil.[8]
BRT Sunway is a public-private partnership project between Prasarana and Sunway Group to provide a better and integrated transit service for the residents and commuters of Bandar Sunway and USJ.[9] The line costs RM634 million and is 70% funded by Prasarana, 15% by Sunway Bhd and the rest by Unit Kerjasama Awam Swasta (UKAS), a facilitation fund.[10] The system uses eco-friendly electric bus services on elevated tracks [11][12][13][14][15] and connects major areas within the areas such as hospital, commercial areas, shopping centres and universities. The system is expected to provide services for 500,000 residents.[8][16] The elevated bus lane is said to be the first elevated BRT in Southeast Asia[17]
Features
The dedicated elevated busway runs isolated from traffic congestion from the Sunway-Setia Jaya Station, which is located near the KTM Setia Jaya Komuter station (linked by covered pedestrian walkways), and ends at the USJ 7 Station of the Kelana Jaya Line extension, where there is "paid area to paid area" integration between the LRT and BRT service by virtue of the BRT platform sharing the paid area of the concourse of the LRT station.
The bus will complement both line by providing the linkage to various forms of public transports. There will be 15 environmentally-friendly buses as they are electrical-powered and travel on a speed of Шаблон:Cvt on average. The electric buses will not have any gas emission and can operate for 12 hours before the next charging cycle with a range of Шаблон:Cvt or 23 trips per day.[18] The electric buses are designed to look almost like trains.[8][16][17][19]
The BRT stations are built with a modern and contemporary design, which include universal access facilities the disabled community such as tactiles for the blind, ramps as well as low ticket counters. Safety features at the stations consist of closed-circuit TV cameras as well as pedestrian bridges so that commuters can cross from one platform to another with ease. SunU-Monash halt has park-and-ride facilities with a total of 1,153 car parking bays, which includes 102 special bays for lady drivers and 23 for the handicapped group, and another 121 bays for motorcycles.[8][17][18][19][20]
According to Prasarana, the ridership for the entire line is forecasted to be at 2,400 riders per hour for 2015 and is expected to reach 5,200 people every hour in 2035.[18][20]
Services
The BRT service was officially launched to the public on 2 June 2015. Rides on the BRT are free for the first two months beginning 2 June 2015. A flat rate of RM4.00 will be charged at the SunU-Monash station park and ride facility from 2 June to 1 August 2015. The electric buses will be available every four minutes.[21][22] The ebus service takes around 30 minutes on full loop journey between BRT halts of Sunway-Setia Jaya to USJ 7 round-trip.
The latest fare has been announced on 1 December 2018 as:[23]
Station | Setia Jaya | Mentari | Sunway Lagoon | SunMed | SunU Monash | South Quay | USJ7 |
---|---|---|---|---|---|---|---|
Setia Jaya | RM 0.90 | RM 1.30 | RM 1.80 | RM 2.40 | RM 2.90 | RM 3.60 | RM 4.30 |
Mentari | RM 1.30 | RM 0.90 | RM 1.30 | RM 1.80 | RM 2.40 | RM 3.10 | RM 3.80 |
Sunway Lagoon | RM 1.80 | RM 1.30 | RM 0.90 | RM 1.40 | RM 1.80 | RM 2.60 | RM 3.20 |
SunMed | RM 2.40 | RM 1.80 | RM 1.40 | RM 0.90 | RM 1.30 | RM 2.00 | RM 2.60 |
SunU Monash | RM 2.90 | RM 2.40 | RM 1.90 | RM 1.30 | RM 0.90 | RM 1.40 | RM 2.20 |
South Quay | RM 3.60 | RM 3.10 | RM 2.60 | RM 2.00 | RM 1.40 | RM 0.90 | RM 1.40 |
USJ7 | RM 4.30 | RM 3.80 | RM 3.20 | RM 2.60 | RM 2.20 | RM 1.40 | RM 0.80 |
Criticism
Affordability
Since the new fare was announced in August 2015, the BRT Sunway Line has been heavily criticised by passengers for its steep and unaffordable prices compared with other public transport services operated by Prasarana.[24] For instance, travelling on the BRT Sunway Line from one end to another (USJ7 to / from Setia Jaya) would cost passengers RM5.40 (cashless ticket), traversing Шаблон:Cvt in distance. In comparison, one would be able to travel from USJ7 to Gombak on the Kelana Jaya Line, covering a distance of more than Шаблон:Cvt. The National Public Transport Users Association (4PAM) went as far as to call the rates "shocking".[25]
It has been reported that 13,000 people rode the BRT when it was free during its initial months in June and July 2015, but the number of passengers has since drastically number declined to 4,000 when the fare was introduced.[26]
However, Prasarana has repeatedly maintained that its fare is relatively low, given the high maintenance and initial cost involved, in addition to various cashless payment options available with discounted fares.[27]
Gallery
-
Sunway Pyramid is one BRT Sunway Line route. Photo showed the defunct Sunway Monorail 3 km steel-tracked loop system.
-
Platform 1 signage at SB5 SunU-Monash station towards SB1 Sunway-Setia Jaya station.
-
BRT Sunway Line elevated busway
-
A BYD battery-run electric bus on dedicated elevated busway.
-
Rapid Bus's battery-run electric bus for BRT Sunway Line at Sunway Depot
-
Rapid Bus's battery-run electric bus at BRT Depot
-
Rapid Bus's battery-run electric bus interior for BRT Sunway Line
-
BRT Sunway ebus approaching SunU-Monash halt.
-
The BRT Sunway ebus interior on operation.
-
The BRT SunMed halt is identical to all 6 halts.
-
The BRT Sunway-Setia Jaya halt is identical to all 6 halts.
-
Faregates of Sunway Lagoon BRT.
-
The BRT USJ7 halt and Kelana Jaya Line station.
-
An aerial view of the USJ 7 LRT Station, with the Sunway BRT Line beneath it.
-
The BRT USJ7 platform/halt.
-
South Quay - USJ1 BRT station from the front.
-
The BRT USJ7 halt signage interchange to upcoming Kelana Jaya Line.
-
BRT South Quay-USJ1 halt from the ground level.
-
The road signboard for Sunway Lagoon BRT station.
-
The platform at BRT Sunway Lagoon. Commuters must not cross the busway directly.
See also
- List of bus rapid transit systems
- Public transport in Kuala Lumpur
- Buses in Kuala Lumpur
- Prasarana Malaysia Berhad
- Rapid Bus Sdn Bhd
- Rapid KL
- BRT Sunway Line
- BRT Federal Line
- Rapid Penang
- Rapid Kuantan
- Rapid KL
- Rapid Bus Sdn Bhd
- Land Public Transport Commission (SPAD)
- Sunway Group
References
External links
Шаблон:Bus transport in Malaysia Шаблон:List of rail transit stations in Klang Valley and Selangor
- ↑ Шаблон:Cite web
- ↑ BRT Standard score by Institute of Transportation & Development PolicyШаблон:Dead link
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ 8,0 8,1 8,2 8,3 Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ 16,0 16,1 Шаблон:Cite web
- ↑ 17,0 17,1 17,2 Шаблон:Cite web
- ↑ 18,0 18,1 18,2 Шаблон:Cite web
- ↑ 19,0 19,1 Шаблон:Cite web
- ↑ 20,0 20,1 Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web