Английская Википедия:Belo Horizonte Metro

Материал из Онлайн справочника
Версия от 21:10, 7 февраля 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|Rapid transit system in Belo Horizonte}} {{Use dmy dates|date=December 2021}} {{Infobox Public transit | name = Belo Horizonte Metro | image = Metrô_BH_logo.png | imagesize = 250px | image2 = Trem da CBTU Belo Horizonte Série 1000.jpg | imagesize2 = 250px | caption2 = | native_name = ''Metrô de Belo Horizonte'' | locale = Belo Horizonte, Brazil | transit...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates Шаблон:Infobox Public transit Belo Horizonte Metro (Шаблон:Lang-pt) is a rapid transit system serving the city of Belo Horizonte, in the state of Minas Gerais in Brazil. The system has one Шаблон:Convert line[1] which serves 19 stations.[2] The Metro carried 54.4 million passengers in 2019,[3] or approximately 150,000 passengers per day. The system is operated by Comporte Participações (Metrô BH).[4] Two more lines are planned.

History

The first section of the metro opened on 1 August 1986.[5] At its opening, the Metro was Шаблон:Convert long and had six stations with three trains in operation. In 1987 the line was extended to Central station and two more trains were brought into use. The line was extended again several times in the mid-1990s, and finally once more in 2002 adding the last 5 of the current 19 stations.[5]

Further trains were delivered in the 1990s, with the last being delivered in December 2001, bringing the total number of trains to 25.[5]

Operations

Network

Шаблон:Main

Line Terminals Inauguration Length (km) Stations Length of trip (min) Operation
1 Eldorado ↔ Vilarinho 1 August 1986 28.1[1] 19[2] 44 minutes Daily, from 05:45 to 23:00

The metro system is formed by one line, beginning at Eldorado station and ending at Vilarinho. The metro spans 19 stations and 28.1 kilometers.

System characteristics

The trains are supplied by 3000 V DC overhead wires, and have a commercial speed of Шаблон:Cvt with a maximum speed of Шаблон:Cvt.[1] Track gauge is Шаблон:RailGauge (broad gauge).

Future service

In early 2014, it was announced that the Belo Horizonte Metro will be expanded with two new lines by 2018, with new train cars, and two additional stations added to Line 1.Шаблон:Citation needed

In September 2015, ten new train cars was introduced officially.

No progress was made in respect of expansion of the network until September 2020, when the Brazilian government committed 1.2 billion reais of funding for the construction of Line 2.[6]

Planned expansion proposed by CBTU

Line Terminals Inauguration Length (km) Stations Length of trip (min) Posture
2 Barreiro ↔ Santa Tereza - 18 15 - Planned
3 Pampulha ↔ Savassi - 12.5 13 - Planned

Шаблон:Panorama

Planned expansion proposed by State Government

Line Terminals Inauguration Length (km) Stations Length of trip (min) Posture
1 Eldorado ↔ João César de Oliveira - 5 3 - Planned
2 Barreiro ↔ Nova Suíça - 10.5 7 - Planned
3 Lagoinha ↔ Savassi - 4.5 5 - Planned
4 João César de Oliveira ↔ Betim - 19.2 18 - Planned

Шаблон:Panorama

On December 22, 2022, the Belo Horizonte metro began to be operated by the Comporte Participações consortium (or simply Metrô BH), through an auction held on the São Paulo Stock Exchange.[4] The new operator will be responsible for the operation, management and maintenance of the metro rail network for 30 years, in addition to the revitalization and expansion interventions of the current Line 1 (expansion to Novo Eldorado) and the construction of Line 2 (new transfer station Nova Suiça between Calafate and Gameleira and expansion to Barreiro), with resources coming from the federal government, the government of Minas Gerais and a fine arising from the judicial agreement with Vale S.A. due to the socio-environmental damages that occurred in the Brumadinho dam disaster in 2019.[7]

The transfer of the system to the winning consortium took place on March 23, 2023. The Line 1 expansion and construction of Line 2 is currently scheduled to be completed between the years 2026 and 2029.[4]

Network Map

Шаблон:Rapid transit OSM map

See also

References

Шаблон:Reflist

External links

Шаблон:Commons category-inline

Шаблон:Belo Horizonte Шаблон:Urban Rail systems in Brazil Шаблон:Rapid transit in Latin America

Шаблон:Coord missing

  1. 1,0 1,1 1,2 Ошибка цитирования Неверный тег <ref>; для сносок data не указан текст
  2. 2,0 2,1 Ошибка цитирования Неверный тег <ref>; для сносок map не указан текст
  3. Ошибка цитирования Неверный тег <ref>; для сносок cbt не указан текст
  4. 4,0 4,1 4,2 Шаблон:Cite web
  5. 5,0 5,1 5,2 Шаблон:Cite web
  6. Шаблон:Cite web
  7. Шаблон:Cite web