Версия от 13:08, 12 февраля 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|Railway line in Hungary and Serbia}} {{Infobox rail line | box_width = 300px | name = Budapest–Belgrade railway | other_name = | native_name = | native_name_lang = | color = FF0000 | logo = | logo_width...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Infobox rail line

The Budapest–Belgrade railway connects the capital cities of Hungary and Serbia – the Budapest Keleti railway station with the new Belgrade Centre railway station.

As a $2.89 billion, Шаблон:Convert high-speed rail line project, the Budapest–Belgrade railway is also a part, and first stage, of the planned Budapest–Belgrade–Skopje–Athens railway international connection in Central and Southeast Europe, a Chinese-CEE hallmark project of Beijing's Belt and Road initiative, connecting the China-run Piraeus port in Greece with the heart of Europe.[1]

Route, geography and landscapes

Файл:Vrsacki breg 3.jpg
The plains of Vojvodina

The railway line between Budapest and Belgrade passes mainly the Bács-Kiskun County and the Serbian province of Vojvodina.[2]

Track condition, modernization

The outdated railway between Belgrade and Budapest will be modernised. The travel time should be decreased from eight hours to three and a half hours, and the maximum speed of the track is designed to be up to Шаблон:Convert on the Serbian section and Шаблон:Convert on the Hungarian section.[3] When the project is complete, the journey between Budapest and Belgrade will be reduced to 2h 40min.[4] According to the plans, the track should be modernised by 2025.[5]

Modernization of the Hungarian section

The Hungarian section (Шаблон:Convert) of the project was announced in 2015 to cost HUF 472 billion and expected to be completed as of 2017–2018.[6][7] Currently it is expected to cost HUF 949 billion ($3.6 billion) with interest.

In Hungary, the project is carried out by Kínai-Magyar Vasúti Nonprofit Zrt (Chinese-Hungarian Railway Nonprofit Ltd.), a Hungarian-Chinese joint venture of MÁV Zrt. with China Railway International Corporation (CRIC) and China Railway International Group (CRIG).[8][9][10] According to one estimate, the works on this section could begin in 2021, as one year is needed for the public procurement procedures, and two years for the planning and negotiation phase.[11] The investment is widely criticised as it will never recover its costs.[12]

The construction of the Hungarian part of the railway, 152 km, was started in October 2021 and is due to be completed by 2025.[13][3]

Modernization of the Serbian section

In Serbia some Шаблон:Convert, one of the segments, the Шаблон:Convert-long section Belgrade-Stara Pazova is currently being reconstructed by China Communications Construction Company (CCCC) together with China Railways International (CRI), with the investment of $350.1 million, funded with a loan from the Export-Import Bank of China.[14][15] The section Stara Pazova–Novi Sad was reconstructed by the Russian RZD International, financed with Russian credit.[15] The reconstruction of the section Novi Sad–Subotica is set to begin in 2022, with estimated cost of €943 million, built by CCCC[16] and a duration of 33 months, during which this section will be closed.[17]

The construction of the railway line in Serbia started in September 2017, when the construction of the Čortanovci tunnel began.[18] The 75 km railway for speed up to 200 km/h between Belgrade and Novi Sad opened on 19 March 2022 (this part was divided in two sections: as of 2018, the BelgradeStara Pazova 34.5 km section was planned to be finished in the end of 2020 and the Stara PazovaNovi Sad 40.4 km section in November 2021).[4][19][20][21] The construction of the 107.4 km section between Novi Sad and Subotica (Hungarian border) was started on 7 April 2022 and is due to be completed for the end of 2024.[22]

Bids

Only two consortia bid for the work. The winning consortium was announced June 2019. As with most public works since 2015[23][24] the government linked Hungarian entrepreneur, Lőrinc Mészáros[25] won, with his company “RM International Zrt”, along with two Chinese companies: China Tiejiuju Engineering & Construction LLC., and China Railway Electrification Engineering Group(Hungary) Ltd.[26]

Criticism

Although the section between Budapest and Belgrade will allow a four hours reduction in travel time, a further travel to the port of Piraeus was, as of 2017, still 2 to 4 days away by train from Belgrade.[27]

While the Hungarian government classified its analysis for the economic viability of the project for 10 years,[28] estimates in the non-government-owned media estimate the return around 130[29] to 2400[30] years based on the current and expected traffic on the line.[31]

Furthermore, the project was criticized for a lack of transparency as the Hungarian government forbade the publication of the contract for the next 10 years. This has raised concerns about potential corruption of the most expensive project in the history of Hungarian railways. Additionally, the project is viewed by some independent media as a part of the Hungarian and Serbian governments' reorientation away from the EU towards China, with this large non-transparent investment potentially being a way to leverage Chinese influence in these countries.[32]

History

Файл:Aff ciwl orient express4 jw.jpg
Historical advertisement, showing the Orient Express in 1888

The railway line between Budapest and Belgrade was used also by the Orient Express until 1914. The Orient Express was launched on 5 June 1883. It connected Paris and Constantinople (later renamed Istanbul).

See also

References

  1. Шаблон:Cite web
  2. Шаблон:Cite news
  3. 3,0 3,1 A Budapest-Belgrád vasútvonal korszerűsítése - alapkőletétel (Modernization of the Budapest-Belgrade railway line: Laying the foundation), mavcsoport.hu, 15 October 2021.
  4. 4,0 4,1 Belgrade - Novi Sad line reopens following reconstruction, railjournal, 29 March 2022.
  5. Шаблон:Cite web
  6. Шаблон:Cite web
  7. Шаблон:Cite web
  8. Шаблон:Cite news
  9. Chinese-Hungarian Railway Nonprofit Ltd.: Chinese-Hungarian Railway Non-Profit Private Limited Company, in Hungarian: Kínai-Magyar Vasúti Nonprofit Zrt.: Kínai-Magyar Vasúti Nonprofit Zártkörűen Működő Részvénytársaság, 10 November 2016, on the MÁV website mavcsoport.hu)
  10. Шаблон:Cite web
  11. Шаблон:Cite news
  12. Шаблон:Cite web
  13. Hungary launched Belgrade – Budapest line construction, railwaypro.com, November 2021.
  14. Шаблон:Cite web
  15. 15,0 15,1 Шаблон:Cite web
  16. Шаблон:Cite web
  17. Шаблон:Cite news
  18. Шаблон:Cite news
  19. Шаблон:Cite news
  20. Шаблон:Cite news
  21. Railway infrastructure in the Republic of Serbia regarding strengthening rail transport connectivity, Marko Jeremić, 2019.
  22. Pruga od Novog Sada do Subotice menja geografiju - vijadukt kod Vrbasa biće dug 1.600 metara (The railway from Novi Sad to Subotica is changing its geography - the viaduct near Vrbas will be 1,600 meters long), 11 Apr 2022, SatTV.
  23. Шаблон:Cite web
  24. Шаблон:Cite web
  25. Шаблон:Cite web
  26. Шаблон:Cite web
  27. Шаблон:Cite news
  28. Шаблон:Cite web
  29. Шаблон:Cite web
  30. Шаблон:Cite web
  31. Шаблон:Cite web
  32. Шаблон:Cite web