Шаблон:Short description Шаблон:Infobox power station The Buffalo Gap Wind Farm is located in Nolan and Taylor Counties, about Шаблон:Convert south west of Abilene, Texas. It was constructed in three phases and has a total wind generation capacity of 523.3 megawatts (MW).[1]
Facility details
Buffalo Gap 1 consists of 67 Vestas V-80 wind turbines, each rated at 1.8 MW, for a total capacity of 120.6 MW. The wind farm was developed by SeaWest WindPower and is currently owned by AES Wind Generation. The power is sold to Direct Energy Texas under a 15-year power purchase agreement.[2]
Buffalo Gap 2 is a 232.5 MW expansion consisting of 155 GE SLE 1.5 MW wind turbines. The facility was developed by AES Wind Generation and went into commercial operation in June 2007. The power is sold to Direct Energy under a 10-year power purchase agreement.[2][3]
Buffalo Gap 3 is a 170.2 MW addition, completed in September 2008, consisting of 74 Siemens 2.3 MW wind turbines.[1]
Electricity production
Year | Buffalo Gap 1 (120.6 MW) [4] |
Buffalo Gap 2 (232.5 MW) [5] |
Buffalo Gap 3 (170.2 MW) [6] |
Total Annual MW·h |
---|---|---|---|---|
2006 | 284,020 | 284,020 | ||
2007 | 338,276 | 289,344 | 627,620 | |
2008 | 346,582 | 592,112 | 119,172 | 1,057,866 |
2009 | 237,641 | 343,888 | 282,313 | 863,842 |
2010 | 355,124 | 656,526 | 457,379 | 1,469,029 |
2011 | 393,144 | 748,033 | 532,497 | 1,673,674 |
2012 | 390,997 | 716,153 | 516,758 | 1,623,908 |
2013 | 374,189 | 680,246 | 489,721 | 1,544,156 |
2014 | 385,083 | 705,214 | 512,171 | 1,602,468 |
2015 | 324,844 | 595,982 | 422,084 | 1,342,910 |
2016 | 349,474 | 673,377 | 464,680 | 1,487,531 |
2017 | 361,998 | 650,578 | 473,993 | 1,486,569 |
Average Annual Production (years 2010–2017) ---> | 1,528,781 |
See also
References
- ↑ 1,0 1,1 Шаблон:Cite web
- ↑ 2,0 2,1 Direct Energy to Buy 233 MW from AES' Wind Project in Texas Шаблон:Webarchive Renewable Energy Access, 1 September 2006.
- ↑ Power Technology project information
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
Шаблон:Wind power in the United States
- Английская Википедия
- Energy infrastructure completed in 2007
- Energy infrastructure completed in 2008
- Buildings and structures in Nolan County, Texas
- Buildings and structures in Taylor County, Texas
- Wind farms in Texas
- 2007 establishments in Texas
- Страницы, где используется шаблон "Навигационная таблица/Телепорт"
- Страницы с телепортом
- Википедия
- Статья из Википедии
- Статья из Английской Википедии