Английская Википедия:Canada-class submarine

Материал из Онлайн справочника
Версия от 12:33, 14 февраля 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|Canadian military submarine}} {{Use dmy dates|date=July 2017}} {|{{Infobox ship begin |sclass=2}} {{Infobox ship image |Ship image= |Ship caption= }} {{Infobox ship class overview |Name=Canada class |Operators={{navy|Canada|name=Canadian Forces}} |Cost=Est. $8 billion CDN |Built range= |In service range= |In commission range= |Total ships building= |Total ships pla...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates

Шаблон:Infobox ship imageШаблон:Infobox ship class overview

The Canada-class submarine was a proposed class of ten nuclear-powered attack submarines to be built for Canadian Forces Maritime Command (today's Royal Canadian Navy) with an option for two more. Announced in 1987, the class was intended to provide Maritime Command with a method for monitoring Canada's Arctic Ocean area while establishing Canadian sovereignty in the area. The announcement suffered significant public and private criticism and the project was cancelled before any of the submarines could be built.

Background

In March 1958, the Royal Canadian Navy began reviewing the possibility of acquiring nuclear-powered submarines under then-Chief of Naval Staff, Vice Admiral Harry DeWolf. This led to the creation of the Nuclear Submarine Survey Team (NSST), whose purpose was to investigate the feasibility of nuclear-powered submarines for Canada.Шаблон:Sfn The NSST delivered their final report in June 1959 recommending the American Шаблон:Sclass as the design of choice, and the acquisition of five of the submarines.Шаблон:Sfn

Under the new Chief of Naval Staff, Vice Admiral Herbert Rayner, the proposal was presented to the Cabinet of Canada suggesting the acquisition of 12 new submarines. However, due to cost, the Navy offered the cheaper alternative of conventionally-powered submarines. The Cabinet approved the initial proposal in January 1960, but deferred the decision on the type of submarine until March. By August 1960, the nuclear-powered submarine option was passed over for conventionally-powered subs. In the end, Canada chose the British diesel-electric Шаблон:Sclass.Шаблон:Sfn

In the early 1980s, Maritime Command (formerly the Royal Canadian Navy) began a program to replace the aging Oberons. Dubbed the Canadian Submarine Acquisition Program (CASAP), they recommended a building program of 4 to 12 submarines with under-ice capability.Шаблон:Sfn The report was presented to the Minister of National Defence, Erik Nielsen, in 1985 with plans for conventionally-powered submarines only. Nielsen requested more information on the possibility of nuclear-powered submarines.Шаблон:SfnШаблон:Sfn The study ordered by Nielsen, named the Nuclear Submarine Option Study (NSOS), claimed that British or French designs could be built in Canada for approximately C$5 billion. This study would shape the policy promoted in the 1987 White Paper on Defence.Шаблон:Sfn

Proposal and design

Файл:Rubis 01.gif
The Rubis-class design
Файл:Trafalgar class SSN silhouette.png
A silhouette of the Trafalgar class

On 6 June 1987, the Canadian White Paper on Defence was tabled in the House of Commons. The White Paper recommended the building of 10 to 12 nuclear-powered submarines, to be stationed on patrol routes in the Northeast Pacific, Arctic and Northwest Atlantic Oceans. Due to their greater speed, range, and ability to operate underneath the Arctic ice, nuclear submarines were preferred . The goal was to build up a three-ocean navy, assert Canadian sovereignty over Arctic waters, and enhance contributions to NATO operations.Шаблон:Sfn[1] The demand for a vessel that could monitor the Arctic was born out of the cruise of the American icebreaker Шаблон:USCGC in 1985 through the Arctic, of which part took it through Canadian territorial waters.Шаблон:Sfn The first of the submarines would be expected to enter service in 1996.Шаблон:Sfn[2]

The intent was to build the submarines in Canada to an existing NATO design.[3] CASAP and NSOS were merged to form a group to select the submarine design.Шаблон:Sfn The group developed the Statement of Requirement (SOR) needed for the evaluation of designs. The SOR called for a safe, reliable design that had modern anti-submarine warfare and under-ice capability, being capable of breaking through ice up to Шаблон:Convert thick. The SOR placed less emphasis on hydrodynamic performances or anti-ship and inshore operational capabilities. They also needed to have a low noise and radiation signatures, the most modern passive sonars and command, control and communications systems. The SOR also stated that the submarine have six torpedo tubes and be able to fire the Mark 48 torpedo.Шаблон:Sfn

By 1988 Maritime Command was looking at purchasing the design of either the French Шаблон:Sclass or the British Шаблон:Sclass. However, neither design met the SOR, with the Rubis class being noisy underwater and slow and the Trafalgar class having only five torpedo tubes and requiring US permission to transfer the nuclear propulsion technology. However, the French brought back a revision to their design, added an "ice pick" so the submarine could operate under ice and were developing a modification for their torpedo tubes which were too short to use the Mark 48 torpedoes.Шаблон:Sfn The British Trafalgar design team did not take Canada's plan seriously and the French Rubis design also came with the caveat that the first 4–5 submarines would have to be built in France.Шаблон:Sfn

In fall 1987, the British and French put their respective designs on display, with Шаблон:HMS and the Шаблон:Ship sailing to Halifax, Nova Scotia for close inspection. As the program advanced, the Department of National Defence encouraged the bidding companies to form consortiums in order to please the politicians.Шаблон:Sfn Opposition however, also began to strengthen against the program.Шаблон:Sfn

Opposition to program

Opposition at home

The proposed nuclear attack submarines were not received well by some politicians. As early as 1985, Ministers Joe Clark and Michael Wilson were against the project, Clark because Canadian nuclear submarines would upset the balance of power with the Warsaw Pact and Wilson because of the cost.Шаблон:Sfn The Treasury Board objected to the program, claiming that the project was run poorly with project costs not developed accurately, especially those tied to infrastructure needs.Шаблон:SfnШаблон:Sfn Members of the opposition focused on the estimated C$8 billionШаблон:Sfn cost of the project, pointing out the steadily increasing size of the federal deficit and debt.Шаблон:Sfn The announcement came slightly more than a year after the Chernobyl disaster, prompting fears of similar nuclear incidents even though no submarine accidents involving reactors had occurred in the then three decades of NATO nuclear submarine use.Шаблон:Sfn

American opposition

The United States objected to the RCN having SSNs as part of its fleet, fearing a significant impact to its own submarine operations in North American waters and possible conflict over access to the Northwest Passage. In order to prevent this, the United States exercised its rights under two previously signed treaties. Under the 1958 US–UK Mutual Defence Agreement, the US had the right to block the sale of submarine nuclear reactors by the United Kingdom to any third party (i.e. Canada), and under a 1959 agreement between the US and Canada the US had the right to block the purchase of submarine nuclear reactors by Canada from any third party (i.e. the United Kingdom or France).Шаблон:Sfn Attempts to negotiate with the United States were initially unsuccessful, as Canadian Defence Minister Perrin Beatty was "told in no uncertain terms by the U.S. Defense Department and submarine service officials that a Canadian nuclear submarine program was unnecessary and even unwelcome."[4]

Cancellation

Файл:HMCS Windsor SSK 877.jpg
HMCS Windsor, one of the Upholders later acquired to replace the Oberons

The Conservative government sought re-election 1988, winning in November. However, public opinion had turned against the program and Prime Minister Brian Mulroney placed the submarines behind other costly government priorities.Шаблон:SfnШаблон:Sfn Government support of the project was seen to be flagging when Perrin Beatty was moved to another Cabinet position and replaced by Bill McKnight as Minister of Defence.Шаблон:Sfn Due to internal as well as external opposition to the acquisition of nuclear-powered submarines, a rising federal debt, and with the lessening of tensions between NATO and the Warsaw Pact, the submarines were officially cancelled as part of the federal budget released in April 1989.Шаблон:SfnШаблон:Sfn

The cancellation had a two-fold effect. The first was the loss of the submarines, which were needed to replace the aging Oberons. The second was the loss of the Batch 3 Шаблон:Sclasss, which had been sacrificed in order to pay for the submarines.Шаблон:Sfn The Oberons were not replaced until the purchase of the Шаблон:Sclasss in 1995, a conventionally-powered British design.Шаблон:Sfn

Naming

Construction of the proposed nuclear-powered submarines was never authorized, and as a result no official names or hull numbers were ever assigned to individual submarines. Government documents refer to the submarines as only either 'nuclear powered submarines' or 'SSNs'. Maritime Command's Ships' Names Committee proposed that the submarines be named after the provinces (and possibly territories) of Canada, and be named in the order that they joined Canada or were created.Шаблон:Sfn

Proposed name Notes
Шаблон:HMCS, Шаблон:HMCS, HMCS Nova Scotia, HMCS New Brunswick Order of naming unclear
HMCS Manitoba
HMCS British Columbia
HMCS Prince Edward Island
HMCS Alberta, Шаблон:HMCS Order of naming unclear
HMCS Newfoundland
HMCS North West TerritoriesШаблон:Sfn Assumes that territory based names would be used last if the option for two additional submarines was exercised, otherwise would come before HMCS Manitoba
Шаблон:HMCS Assumes that territory based names would be used last if the option for two additional submarines was exercised, otherwise would come before HMCS Alberta/HMCS Saskatchewan

However a class name based on the lead ship's name does not exist as several provinces became part of Canada simultaneously, (Ontario, Quebec, Nova Scotia and New Brunswick in 1867) and so a 'first province' would have to be chosen. Because of this the Ships' Names Committee proposed the name "Canada class", but this name violated existing procedures for ship class names.Шаблон:Sfn Because of the ambiguity of the class name, these subs are sometimes referred to as "Province-class" submarines, based on the proposed names (cf. the Maritime Command's Halifax-class frigates originally referred to as City class, before final names were assigned). At the time of the proposal two Maritime Command ships were in service with such names, Шаблон:HMCS and Шаблон:HMCS (named not after the provinces, but after the Saskatchewan and Yukon rivers), but were to be retired before the scheduled commissioning of the first of the submarines.

See also

Шаблон:Portal

References

Citations

Шаблон:Reflist

Sources