Версия от 10:40, 15 февраля 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|Gold mine in Western Australia}} {{Use Australian English|date=March 2017}} {{Use dmy dates|date=March 2017}} {{Infobox gold mine | name = Carosue Dam | image = | width = | caption = | pushpin_map = Western Australia | pushpin_label =Carosue Dam Gold Mine | pushpin_map_caption = Location in Western Australia | coordinates = {{coord|-30.1531|122.3521|region:AU-WA|for...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use Australian English Шаблон:Use dmy dates Шаблон:Infobox gold mine

The Carosue Dam Gold Mine is a gold mine located south of Laverton, Western Australia.

Carosue Dam was previously owned by the now defunct mining company Sons of Gwalia Limited.[1] Purchased in 2005, the mine was placed into care and maintenance by new owners St Barbara in June 2005 and sold to Saracen Mineral Holdings in February 2006. Saracen reopened the mine in early 2010. It is now owned and operated by Northern Star Resources after a merger with Saracen in 2021.

History

Файл:Gold mines Kalgoorlie Leonora (2).svg
Gold mines in the Kalgoorlie - Leonora region

Located within the South Laverton gold field, situated 120 km north east of Kalgoorlie, the processing plant at Carosue Dam was constructed and commissioned in 2000, then owned by Pacmin Mining. In October 2001, it was acquired by Sons of Gwalia.[2] During its five-year operation until June 2005, the mine produced over 700,000 ounces of gold.[3]

Sons of Gwalia went into administration on 30 August 2004 and the company's gold mining operations were sold to St Barbara Limited in March 2005 for A$38 million, having been valued by the Sons of Gwalia directors at A$120 million. It was one of four gold mines sold to St Barbara in this deal, the other three being the Marvel Loch Gold Mine, the Tarmoola Gold Mine and the Gwalia Gold Mine.[4][5][6]

After the collapse of Sons of Gwalia in 2004, the mine continued producing but was placed in care and maintenance by St Barbara three months after its purchase.[7]

In October 2005, St Barbara announced the sale of Carosue Dam to Saracens for A$19.4 million in cash and shares. St Barbara acquired a 20% interest in Saracens through this transaction.[8]

With the purchase of the mine by Saracen, the new owners developed a two-staged plan to reopen the mine in 2010. After a period of open pit mining, lasting for three to five years, the second stage will also include an underground operation.[9]

On 15 June 2009 Saracen announced that the mine would be connected to the Western Power grid through a 90 km power line rather than being supplied by diesel generators on site. This line, scheduled to be completed in late 2010, is estimated to cost between $10 and 15 million but should provide the company with savings in the range of $50 to 100 per ounce of gold produced.[10]

In November 2009, Saracen announced that the $7 million construction project at the mine had been finished and plant commissioning had started. Gold production was scheduled to begin in February 2010,[11] with the first gold pour announced on 29 January 2010.[12]

In October 2020, a merger between Northern Star Resources and Saracen Metal Holdings was proposed and completed in February 2021 when Saracen was de-listed from the Australian Securities Exchange.[13][14]

As of 2022, the mine operated by Northern Star Resources as an underground and surface operation.[15]

A 5MW solar power station was commissioned in June 2022 to reduce the mine's emissions by over 5600 tonnes per year.[16]

Production

Production of the mine:[17][18][19][7][20][21][22][15][23]

Year Production Grade Cost per ounce
2001 121, 161 ounces 1.76 g/t A$345
2002 95,144 ounces Шаблон:Ref 1.8 g/t A$388
2002–03 139,894 ounces A$426
2003–04 172,388 ounces A$387
2005 29,528 ounces Шаблон:Ref 3.28 g/t A$349
2005–09 inactive
2009–10 25,036 ounces A$654
2010–11 111,163 ounces A$738
2011–12
2012–13
2013–14
2014–15
2015–16 157,191 ounces 2.3 g/t A$1,067
2016–17 155,970 ounces 2.14 g/t A$1,413
2017–18 171,301 ounces 2.3 g/t A$1,199
2018–19
2019–20 203,280 ounces 3.2 g/t A$1,263
2020–21 232,276 ounces 3.1 g/t A$1,311
2021–22 237,625 ounces 2.1 g/t A$1,785

Notes

Шаблон:Refbegin

Шаблон:Refend

References

Шаблон:Reflist

Bibliography

External links

Шаблон:Active Gold Mines in Western Australia

  1. The Australian Mines Handbook: 2003-2004 Edition, page 520
  2. MINEDEX on the Web Шаблон:Webarchive accessed: 4 September 2009
  3. Saracen website - Plant and Infrastructure Шаблон:Webarchive accessed: 4 September 2009
  4. Sons of Gwalia Limited at delisted.com.au accessed: 3 September 2009
  5. St Barbara Mines Limited - Lodgment of Open Briefing Шаблон:Webarchive published: 28 June 2005, accessed: 3 September 2009
  6. The West Australian, published 16 March 2005, accessed: 3 September 2009
  7. 7,0 7,1 Шаблон:Cite web
  8. St Barbara annual report 2006 Шаблон:Webarchive accessed: 4 September 2009
  9. Saracens website - Operations - Stage 2 Шаблон:Webarchive accessed: 4 September 2009
  10. Carosue Dam Operations - Mains power supply Saracens website, published: 15 June 2009, accessed: 5 September 2009
  11. Carosue Dam plant commissioning commenced Gold production expected in February 2010 Шаблон:Webarchive ASX announcement, published: 30 November 2009, accessed: 27 December 2009
  12. First Gold Pour at the Carosue Dam Operations Saracens ASX announcement, published: 29 January 2010, accessed: 30 January 2010
  13. Шаблон:Cite news
  14. Шаблон:Cite news
  15. 15,0 15,1 Шаблон:Cite web
  16. Шаблон:Cite news
  17. The Australian Mines Handbook: 2003-2004 Edition, page 77
  18. Sons of Gwalia annual report 2003 accessed: 12 January 2010
  19. Sons of Gwalia fourth quarter report 2004 accessed: 12 January 2010
  20. Quarterly Activities Report June 2010 Saracen ASX announcement, published: 29 July 2010, accessed: 5 August 2011
  21. Quarterly Activities Report June 2011 Saracen ASX announcement, published: 28 July 2011, accessed: 5 August 2011
  22. Шаблон:Cite web
  23. Шаблон:Cite web