Английская Википедия:Central Park North–110th Street station

Материал из Онлайн справочника
Версия от 07:49, 16 февраля 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|New York City Subway station in Manhattan}} {{other uses|110th Street (disambiguation)}} {{Use mdy dates|date=August 2023}} {{Use American English|date=August 2023}} {{Infobox NYCS | name = Central Park North–110 Street | former = 110 St–Central Park North | bg_color = #E20F00 | image = 110th Street-Central Park North Station.jpg | image_caption = North end of t...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Other uses Шаблон:Use mdy dates Шаблон:Use American English Шаблон:Infobox NYCS The Central Park North–110th Street station (signed as 110 St–Central Park North on overhead signs) is a station on the IRT Lenox Avenue Line of the New York City Subway, located at the intersection of 110th Street and Lenox Avenue at the southern edge of Harlem, Manhattan. It is served by the 2 and 3 trains at all times.

The 110th Street–Central Park North station was constructed for the Interborough Rapid Transit Company (IRT) as part of the city's first subway line, which was approved in 1900. Construction on the tunnel to the south of 110th Street started on August 30, and construction on the tunnel to the north started on October 2 of the same year. The station opened on November 23, 1904. The station's platform was lengthened in 1910.

The 110th Street–Central Park North station contains one island platform and two tracks. The station was built with tile and mosaic decorations. The platform contains exits to Lenox Avenue's intersections with 110th Street and 111th Street.

History

Construction and opening

Planning for a subway line in New York City dates to 1864.[1]Шаблон:Rp However, development of what would become the city's first subway line did not start until 1894, when the New York State Legislature passed the Rapid Transit Act.[1]Шаблон:Rp The subway plans were drawn up by a team of engineers led by William Barclay Parsons, the Rapid Transit Commission's chief engineer. It called for a subway line from New York City Hall in Lower Manhattan to the Upper West Side, where two branches would lead north into the Bronx.[2]Шаблон:Rp A plan was formally adopted in 1897, and legal challenges were resolved near the end of 1899.[1]Шаблон:Rp The Rapid Transit Construction Company, organized by John B. McDonald and funded by August Belmont Jr., signed the initial Contract 1 with the Rapid Transit Commission in February 1900,[3] in which it would construct the subway and maintain a 50-year operating lease from the opening of the line.[1]Шаблон:Rp In 1901, the firm of Heins & LaFarge was hired to design the underground stations.[2]Шаблон:Rp Belmont incorporated the Interborough Rapid Transit Company (IRT) in April 1902 to operate the subway.[1]Шаблон:Rp

The 110th Street–Central Park North station was constructed as part of the IRT's East Side Branch (now the Lenox Avenue Line). Farrell & Hopper began building the section from 110th Street to 135th Street on August 30, 1900. Farrell & Hopper started constructing the section from 103rd Street to 110th Street and Lenox Avenue on October 2, 1900.[3][4]Шаблон:Rp The excavation was relatively easy because the subway was under one side of Lenox Avenue and there were no street railway tracks to work around.[4]Шаблон:Rp At Lenox Avenue and 110th Street, a Шаблон:Convert diameter circular brick sewer, draining Шаблон:Convert of the west side of Manhattan, was intersected by the subway. A new sewer of equal diameter, but to a depth sufficient to pass beneath the subway was constructed on either side of the subway structure. Where the sewer passed beneath the subway, the brick sewer was replaced by three Шаблон:Convert diameter cast iron pipes.[4]Шаблон:Rp

On November 23, 1904, the East Side Branch opened to 145th Street.[5][6] Initially, the station was served by East Side local and express trains. Local trains ran from City Hall to Lenox Avenue (145th Street). Express trains had their southern terminus at South Ferry or Atlantic Avenue and had their northern terminus at 145th Street or West Farms (180th Street).[7] Express trains to 145th Street were eliminated in 1906, and West Farms express trains operated through to Atlantic Avenue in Brooklyn.[8]

Service changes and station renovations

To address overcrowding, in 1909, the New York Public Service Commission proposed lengthening the platforms at stations along the original IRT subway.[9]Шаблон:Rp As part of a modification to the IRT's construction contracts made on January 18, 1910, the company was to lengthen station platforms to accommodate ten-car express and six-car local trains. In addition to $1.5 million (equivalent to $Шаблон:Inflation million in Шаблон:Inflation/year) spent on platform lengthening, $500,000 (equivalent to $Шаблон:Inflation million in Шаблон:Inflation/year) was spent on building additional entrances and exits. It was anticipated that these improvements would increase capacity by 25 percent.[10]Шаблон:Rp The platform at the 110th Street–Central Park North station was extended Шаблон:Convert to the north.[10]Шаблон:Rp On January 23, 1911, ten-car express trains began running on the East Side Line.[9]Шаблон:Rp[11]

In 1918, the Broadway–Seventh Avenue Line opened south of Times Square–42nd Street, and the original line was divided into an H-shaped system. Local trains were sent to South Ferry, while express trains used the new Clark Street Tunnel to Brooklyn.[12]

The city government took over the IRT's operations on June 12, 1940.[13][14] The IRT routes were given numbered designations with the introduction of "R-type" rolling stock. These fleet contained rollsigns with numbered designations for each service. The first such fleet, the R12, was put into service in 1948.[15] The route to White Plains Road, formerly the route to West Farms, became known as the 2, while the route to Lenox Avenue–145th Street became the 3.[16] The New York City Transit Authority (NYCTA) announced plans in 1956 to add fluorescent lights above the edges of the station's platforms.[17] In 1959, all 2 and 3 trains became express.[18] In November 1959, the Warshaw Construction Company received a contract to remove fifteen entrance/exit kiosks on IRT lines, including three at the 110th Street station: two at the 111th Street entrance and one at the 110th Street entrance. This was part of a citywide initiative to remove the kiosks, which obstructed motorists' views of pedestrians.[19]

Starting on March 2, 1998, the tunnel was reconstructed along with the cracked tunnel floor. This was done to correct a major water problem that had existed for many years due to the presence of the Harlem Creek and other underground streams, which caused extensive flooding, water damage, and seepage problems that occasionally contributed to severe service disruptions.[20][21] The project cost $82 million and was finished on October 12, 1998.[20][22] During the reconstruction, many Шаблон:NYCS trains were rerouted via the IRT Lexington Avenue Line, while the Шаблон:NYCS trains were rerouted to the 137th Street–City College station on the IRT Broadway–Seventh Avenue Line. Each of the two Lenox Avenue Line tracks were alternately taken out of service and supplemental shuttle bus service connecting to other lines in the area were provided for much of this time.[23][24]

Fire

On March 27, 2020, a northbound 2 train caught fire as it entered the Central Park North–110th Street station, killing the operator, injuring at least 16 others, and severely damaging the station.[25][26] The incident was investigated as a possible arson, as several other fires had been observed in nearby stations.[27][28]

Station layout

Файл:110st23jeh.JPG
The entrance to the 110th Street-Central Park North station
Ground Street level Exit/entrance
Platform level Northbound Шаблон:Rint toward Шаблон:Stl (Шаблон:Stl)
Шаблон:Rint toward Шаблон:Stl (116th Street)
Island platform
Fare control, station agent
Island platform
Southbound Шаблон:0 Шаблон:Rint toward Шаблон:Stl (Шаблон:Stl)
Шаблон:0 Шаблон:Rint toward Шаблон:Stl (Шаблон:Stl late nights) (96th Street)

The 110th Street–Central Park North station has two tracks and an island platform.[29] The 2 and 3 trains stop here at all times.[30][31] The station is between 96th Street to the south and 116th Street to the north.[32] The platform was originally Шаблон:Convert long, like at other stations north of 96th Street.[2]Шаблон:Rp[33]Шаблон:Rp The platform is wider at its south end than at its north, where it was extended in the 1950s and the tracks curve.

This underground station is the southernmost station on the Lenox Avenue Line. South of this station, the line turns southwest under the Great Hill and North Woods of Central Park, then west under 104th Street, and then south once again at Broadway, merging with the IRT Broadway–Seventh Avenue Line to become the express tracks of that line.

Design

As with other stations built as part of the original IRT, the station was constructed using a cut-and-cover method.[4]Шаблон:Rp The tunnel is covered by a U-shaped trough that contains utility pipes and wires. The bottom of this trough contains a foundation of concrete no less than Шаблон:Convert thick.[33]Шаблон:Rp The platform consists of Шаблон:Convert concrete slabs, beneath which are drainage basins. The original platform contains circular, cast-iron Doric-style columns spaced every Шаблон:Convert, while the platform extensions contain I-beam columns. Additional columns beside the tracks, spaced every Шаблон:Convert, support the jack-arched concrete station roofs.[2]Шаблон:Rp[33]Шаблон:Rp There is a Шаблон:Convert gap between the trough wall and the track walls, which are made of Шаблон:Convert-thick brick covered over by a tiled finish.[33]Шаблон:Rp

The original decorative scheme consisted of blue/green tile panels and green and buff tile bands.[33]Шаблон:Rp The mosaic tiles at all original IRT stations were manufactured by the American Encaustic Tile Company, which subcontracted the installations at each station.[33]Шаблон:Rp The decorative work was performed by tile contractor John H. Parry.[33]Шаблон:Rp The station's artwork, installed during a 1998 renovation, is called Message from Malcolm by Maren Hassinger. It consists of mosaic panels on the platform and main fare control area's street stairs that depict quotes and writings by Malcolm X written in script and surrounded by mosaic borders.

Exits

This station has two fare control areas, both of which are on platform level. The full-time one is at the south end and has a bank of four turnstiles, token booth, and double-wide staircase going up to the northwest corner of Central Park North and Malcolm X Boulevard.[34] A full height turnstile at the center of the platform leads to a staircase that goes up to the northwest corner of West 111th Street and Malcolm X Boulevard.[34]

Шаблон:-

References

Шаблон:Reflist

External links

Шаблон:Commons category

Шаблон:NYCS stations navbox by service Шаблон:NYCS stations navbox by line Шаблон:Central Park