Английская Википедия:Chestnut Hill Avenue station

Материал из Онлайн справочника
Версия от 15:15, 17 февраля 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{about|the Green Line B branch station|the Green Line D branch station|Chestnut Hill station (MBTA)}} {{Short description|Light rail station in Boston, Massachusetts}} {{Infobox station | name=Chestnut Hill Avenue | style=MBTA |style2=Green | image=Inbound train at Chestnut Hill Avenue, August 2016.JPG | image_caption=An inbound train at Chestnut Hill Avenue station in 2016 | add...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:About Шаблон:Short description Шаблон:Infobox station

Chestnut Hill Avenue station is a light rail surface stop on the MBTA Green Line B branch, located in the median of Commonwealth Avenue just east of Chestnut Hill Avenue in the Brighton neighborhood of Boston, Massachusetts. Chestnut Hill Avenue has two low-level platforms, serving the B branch's two tracks; the stop is not accessible.

Just to the west of the station, there is a wye connecting the B branch to non-revenue tracks that run along Chestnut Hill Avenue to Reservoir Carhouse at Cleveland Circle. The tracks are used to supply the B branch with cars before rush hour, as the carhouse at Boston College has limited storage area.[1] The leg of the wye leading from the westbound B branch to the non-revenue tracks is out of service and paved over.

History

Файл:Passengers waiting at Braemore Road, circa 1910.jpg
Passengers waiting at Braemore Road in the 1910s

On May 14, 2008, an outbound train derailed at Chestnut Hill Avenue. It struck a nearby utility pole, which brought down the overhead wires, causing the trolley to catch fire. No injuries were reported, but the trolley suffered significant damage.[2][3]

Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops.[4] Design for Chestnut Hill Avenue and four other B Branch stops was 30% complete by December 2022.[5] Шаблон:As of, construction is expected to begin in spring 2025.[6] Шаблон:Clear left

References

Шаблон:Reflist

External links

Шаблон:Commons category inline

Шаблон:MBTA Subway Stations

Шаблон:Tram-stub Шаблон:Massachusetts-railstation-stub Шаблон:MBTA-stub

  1. Ошибка цитирования Неверный тег <ref>; для сносок bluebook не указан текст
  2. Шаблон:Cite news
  3. Шаблон:Cite news
  4. Шаблон:Cite web
  5. Шаблон:Cite web
  6. Шаблон:Cite web