Английская Википедия:Chirkey Dam

Материал из Онлайн справочника
Версия от 01:38, 18 февраля 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|Dam in Dagestan, Russia}} {{Infobox dam | name = Chirkey Dam | name_official = Chirkey GES | image = ЧІикІаб (Чиркейская) ГЭС.jpg | image_size = 300px | image_caption = Chirkey Dam | image_alt = | location_map = Russia Dagestan#Russia | location_map_size = | location_m...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Infobox dam The Chirkey Dam (Chirkeisk GES) is an arch dam on the Sulak River in Dagestan, Russia. The main purpose of the dam is hydroelectric power production, and it supports a 1,000 MW power station. Construction on the dam began in 1964, the first generator was operational by 1974, the last in 1976 while the project was officially completed in 1978. It is the tallest arch dam in Russia.

Design

The dam is a Шаблон:Convert tall and Шаблон:Convert long (crest) concrete arch dam. It is Шаблон:Convert wide at its crest, Шаблон:Convert wide at its base and contains Шаблон:Convert of concrete. The dam withholds a Шаблон:Convert reservoir of which Шаблон:Convert is active or "useful" storage. The reservoir has a surface area of Шаблон:Convert, length of Шаблон:Convert and maximum width of Шаблон:Convert. Maximum depth of the reservoir is Шаблон:Convert and its catchment area is Шаблон:Convert.[1][2]

The dam's spillway consists of a Шаблон:Convert long non-pressure tunnel with its intake on the left bank of the dam. The spillway's capacity is Шаблон:Convert. The dam's outlet works, spillway and power station have a combined discharge capacity of Шаблон:Convert.[1]

The dam's power station contains 4 × 250 MW Francis turbine-generators for a total installed capacity of 1,000 MW. Each generator is supplied with water by a penstock, all four of which intake on the upstream side of the dam's face and run down its surface toward the power station at the dam's base.[1]

See also

Шаблон:Portal

References

Шаблон:Reflist

External links

Шаблон:Authority control