Английская Википедия:Chongqing–Wanzhou intercity railway

Материал из Онлайн справочника
Версия от 05:18, 18 февраля 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|Railway line in China}} {{for|the planned railway|Chongqing–Wanzhou high-speed railway}} {{Refimprove|date=January 2017}} {{use dmy dates|date=October 2018}} {{Infobox rail line | box_width = | name = {{nowrap|Chongqing–Wanzhou Intercity Railway}}<br/>{{nobold|{{lang|zh-hans|渝万城际铁路}}}} | color = | logo = | logo_width = 1...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:For

Шаблон:Refimprove Шаблон:Use dmy dates Шаблон:Infobox rail line Шаблон:Chinese Chongqing–Wanzhou intercity railway is a high speed railway between urban Chongqing and its satellite district of Wanzhou. It is also known at the Yu-Wan Railway, which are abbreviations for Chongqing and Wanzhou. Construction started in December 2012, according to the summarizing and commending meeting of the phase II of "100-day Battle" in Chongqing Liangjiang New Area.[1] It was completed on 29 November 2016 and takes passengers from Chongqing North Railway Station to Wanzhou North railway station in one hour. This railway forms a smaller section of two larger railway projects, the Chongqing–Xi'an high-speed railway and the Zhengzhou–Wanzhou high-speed railway, extending north and northeast from Wanzhou respectively. It was opened on 28 November 2016.


Route Description

The Шаблон:Cvt-long Chongqing–Wanzhou railway is designed to run at a speed of Шаблон:Cvt connecting Chongqing North Railway, Fusheng, Changshou, Changshou Lake, Dianjiang County, Liangping and Wanzhou, according to the approval from The Ministry of Railways of PRC.

  • It has been built as a double tracked electrified high speed railway.
  • It has been built to the heavy rail standard with continuous welded track on ballastless track
  • The length of the line supported on bridges or viaducts is 39.67% of the total railway length.
  • The length of the line through tunnels is 31.77% of total railway length. The longest at Шаблон:Cvt and the shortest tunnel at Шаблон:Cvt.
  • The length of the line built at grade, on ground level is 29.66%
  • The length of the roadbed within the stations is Шаблон:Cvt.

Operations

The train can take passengers from Wanzhou North or Dianjiang County to urban Chongqing in 90 or 30 minutes respectively. High speed services extend to Chengdu with a travel time of 3 and a half hours.

Future

Шаблон:Main A second route between Chongqing and Wanzhou, the Chongqing–Wanzhou high-speed railway, on a faster Шаблон:Convert alignment, is expected to open in 2025.

References

Шаблон:Reflist

Шаблон:High-speed rail in the People's Republic of China Шаблон:Regional and commuter rail transit in China