Версия от 04:46, 24 февраля 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Infobox bridge |fetchwikidata=coordinates |name = Dalsfjord Bridge |native_name = Dalsfjordbrua |native_name_lang = NO |official_name = |other_name = |image = Dale Panorama2.jpg |image_size = 250px |alt = |caption = View of the bridge |carries = {{fylkesvei|609}} |crosses = Dalsfjorden (Sunnfjord)...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Infobox bridge

The Dalsfjord Bridge is a suspension bridge over the Dalsfjorden in Vestland county, Norway. The bridge connects the municipalities of Fjaler and Askvoll on either side of the fjord. The suspension bridge has a main span of Шаблон:Convert and the bridge towers are Шаблон:Convert high. It was opened on 14 December 2013. The bridge was built as part of the Dalsfjord Connection project and is part of Norwegian County Road 609. On the west side, the road enters the Otterstein Tunnel, while on the east side of the bridge the road enters a Шаблон:Convert tunnel arm into a roundabout inside the Nishammart Tunnel.[1][2]

History

The bridge plans date back to the 1960s and a desire for a road connection between the villages of Askvoll and Dale and the town of Førde with a road on the north side of the Dalsfjorden. Among other things, 1,200 signatures were collected in support of the project in 1962. Later, it was decided that a bridge would be built across the Dalsfjorden. In 1975, construction of the road started from the ferry dock at Eikenes and inwards the fjord towards Otterstein, where the Dalsfjord bridge was to be built over to Nishammar on the south side. After Шаблон:Convert of road and one Шаблон:Convert tunnel had been built, roadwork was stopped in 1979. In 1981, the project was put on hold even though it had already cost Шаблон:NOK and the new road ended at a rock wall. During the 1990s, the road project was discussed further, but it wasn't until 2010 when the project was resumed. The road opened in 2013.[3]

Шаблон:Wide image

References

Шаблон:Reflist

Шаблон:Authority control