Английская Википедия:Dandong–Dalian intercity railway

Материал из Онлайн справочника
Версия от 09:25, 24 февраля 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|Railway line in Liaoning, China}} {{Use dmy dates|date=December 2016}} {{Infobox rail line | box_width = | name = Dandong–Dalian intercity railway | native_name = {{lang|zh-hans|丹大城际铁路<br>丹大快铁<br>丹大快速铁路<br>沿海通道丹东至大连段}} | native_name_lang = zh-hans | color = {{rcr|CRH}} | logo = CRH-log...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates Шаблон:Infobox rail line The Dandong–Dalian intercity railway (Шаблон:Zh) is a high-speed line operated by China Railway High-speed within the Liaodong Peninsula of Liaoning province, connecting the coastal cities of Dandong and Dalian.

Overview

Dandong–Dalian intercity railway is broken down into three segments: DandongZhuanghe, Zhuanghe–Dengshahe, and Dengshahe–Dalian. It will have a total length of about Шаблон:Convert, of which Шаблон:Convert will be in the Dandong prefectural area, Шаблон:Convert will be in the Dalian region.[1] The total investment is estimated to be about 14.7 billion yuan with a design speed of Шаблон:Convert of primarily double tracked electrified railway. The construction period was estimated to take about three and a half years[2] and was started on 17 March 2010. It started operation on 17 December 2015.[3]

History

Planning phase

  • 21 April 2009 – Liaoning Provincial Government and the Ministry of Railways signed the "On the strengthening of Liaoning railway construction Minutes", which set a railway design speed of Шаблон:Convert along a double track line electrified railway for passengers and freight.
  • 28 June 2009 – Ministry of Railways jointly with the provincial government reported to the National Development and Reform Commission about their studies on this project.[4]
  • 19–21 December 2009 – Ministry of Railways held preliminary design review meeting, formally adopting the project preliminary design review.

Construction phase

  • 17 March 2010 – Dandong – Zhuanghe section started.[5]
  • 2 December 2010 – First bridge girder erection in the Donggang, Liaoning, area, well north of the town of Wolong with several large bridges completed.[6]

Operation phase

  • 17 December 2015 – Start operation.

References

Шаблон:Reflist

Шаблон:Coastal corridor Шаблон:Regional and commuter rail transit in China Шаблон:High-speed rail in the People's Republic of China Шаблон:Liaoning transit