Версия от 02:39, 26 февраля 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|Irrigation project in India}} {{Refimprove|date=January 2010}} {{EngvarB|date=March 2014}} {{Use dmy dates|date=March 2014}} The '''Dehani lift irrigation scheme''' is a technologically sophisticated project to irrigate Vidarbha, a large, semi-arid region of India. ==Background== Vidharba is a semi-arid region that has an ailing a...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Refimprove Шаблон:EngvarB Шаблон:Use dmy dates

The Dehani lift irrigation scheme is a technologically sophisticated project to irrigate Vidarbha, a large, semi-arid region of India.

Background

Vidharba is a semi-arid region that has an ailing agricultural community which has huge amounts of debts. This has led to a high farm suicide rate.[1] The Prime Minister has proposed a centrally funded package to irrigate nearly Шаблон:Convert and therefore provide economic relief.

Details

The project is being executed by Vidarbha Irrigation Development Corporation and IVRCL Infrastructures and Projects Limited. The region to be irrigated is Шаблон:Convert in Dehani, Babhulgaon taluk, Yavatmal district, over the river Bembla at Khadasawanga. The project costed INR 1,988,300,000 (1.988 billion)[2] and was completed in 2011.

This project was the first of its kind in India[3] and envisions the drip irrigation of a large area, while making use of the latest in communication technology. The Supervisory Control and Data Acquisition System (SCADA) will interconnect all components of the system via a satellite uplink, making it possible for the central command centre of the irrigation scheme to be able to control all components remotely.

Components

Bembla reservoir

The Bembla dam built over the river Bembla at Khadaksawanga is Шаблон:Convert long and Шаблон:Convert high, with a capacity of Шаблон:Convert. The Bembla project currently has a command area of Шаблон:Convert, and the completed project will have a command area of Шаблон:Convert. The total project cost is expected to be INR 12.8 billion.[4]

Approach channel

A Шаблон:Convert approach channel carries water from the Bembla reservoir into the Forebay Stage-1. The channel is of trapezoidal cross-section.[5]

Forebay Stage-1

Файл:Forebay Stage-1, DLIS.JPG
Forebay Stage-1

The forebay is Шаблон:Convert long and has an average depth of Шаблон:Convert. This structure functions as a storage space for water before it is pumped farther ahead.[5]

Pumphouse Stage-1

This pumphouse is attached to the Forebay Stage-1 and has vertical turbine pumps with an installed capacity of Шаблон:Convert. Water is pumped from a reduced level of Шаблон:Convert to the Main Distribution Chamber Stage-1 up to an elevation of Шаблон:Convert via the Rising Mains Stage-1, which consist of one row of Шаблон:Convert steel pipe and one row of Шаблон:Convert steel pipe.[5]

Main Distribution Chamber (MDC) Stage-1

Файл:MDC-1 and Forebay-2.JPG
MDC Stage-1 and Forebay Stage-2

From MDC Stage-1, part of the water enters the forebay of Pumphouse Stage-2, which has an installed vertical turbine pump capacity of Шаблон:Convert. The remainder of the water is supplied to 34 Sub Distribution Chambers via pre-stressed concrete pipes which form part of the Gravity Mains.[5]

Sub Distribution Chamber (SDC)

Each SDC is a circular underground tank with a capacity of Шаблон:Convert. The average depth of each SDC below the ground level is Шаблон:Convert. Each will service an area of Шаблон:Convert.[5] Each SDC, along with its associated instrument panel room and transformer, has been allocated a Шаблон:Convert area.

Each SDC has a Шаблон:Convert pump installed. A trained operator will be employed in each instrument panel room to make the relevant data entries regarding the type of crops on the sub-zones being serviced by that particular SDC. The programme distributes the exact amount of water required in each sub-zone and cuts off the flow when the requirement has been fulfilled.

The entire project has been divided into two stages, the first stage consists of 34 SDCs and the second stage consists of 23 SDCs. In all there will be 57 SDCs servicing the 57 zones that are subdivisions of the command area. Each zone is to be divided into 27 sub-zones. The SCADA system to be implemented is capable of delivering the exact amount of water required at each field according to the cropping pattern. It is proposed to train three representatives of the farming community from each zone, so that they will be able to operate the instrument panel of each SDC. For the initial three years of functioning, the IVRCL personnel will run the entire project, after which the responsibility of the day-to-day activities at the SDC will be handed over to the representatives of the farming community.

Forebay Stage-2

Part of the water stored in the MDC Stage-1 is supplied into this forebay. From here Шаблон:Convert vertical turbine pumps (installed in the Pumphouse Stage-2) are used to pump the water farther ahead into the second stage of the project serviced by MDC Stage-2, which will supply 23 more SDCs.[5]