Английская Википедия:Drury railway station

Материал из Онлайн справочника
Версия от 13:05, 29 февраля 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{short description|Railway station in New Zealand}} {{Use dmy dates|date=August 2015}} {{Use New Zealand English|date=August 2015}} {{Infobox station | name = Drury | type = | image = File:Drury railway station 1905.png | image_caption = Drury railway station 1905 | address = Drury, Auckland | country = New Zealand | coordinates = {{Coord|-37.104|174.952|re...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates Шаблон:Use New Zealand English Шаблон:Infobox station

Drury railway station (formerly under the placeholder name Drury Central railway station) is a railway station under construction in Auckland, New Zealand. It is due to open in 2025 as part of the Auckland railway electrification project. It will serve the Drury area in south Auckland. The station will be located on the existing North Island Main Trunk railway line, south of Waihoehoe Road, between Flanagan Rd and Great South Rd.[1] In 2023 KiwiRail won a court case about objections from a developer to the location of the station.[2]

Between 1874 and 1972, it was a station on the North Island Main Trunk line in New Zealand. It was a stop for southern services on the Auckland railway network.[3][4]

History

The Auckland and Drury Railway Act 1863 was passed by Parliament "to enable the Superintendent of the Province of Auckland to construct a Railway between the Towns of Auckland and Drury with a Branch to Onehunga in the said Province."[5]

The station was opened in October 1874.[6] On 8 December 1918, the existing station was replaced by a new Drury station building on a new site which also replaced the Runciman railway station. On 21 May 1972, the station was closed.[6]

New train stations for Drury West and Paerata are included in a July 2017 proposal for Auckland infrastructure spending of $600 million to support new housing announced by the government. They will be built and owned by a new Crown Infrastructure Partners body, as the Auckland Council has reached its borrowing limit.[7] In 2020, the government announced $247 million in funding for new stations at Drury West and Drury East,[8] to be started in 2023.[9]

As part of the New Zealand Upgrade Programme, Jacinda Ardern's government announced $371 million in funding towards the electrification of track from Papakura to Pukekohe, and a separate $247 million towards the construction of two new stations in Drury Central and Drury West. This was later expanded to include a third station at Paerata.Шаблон:Citation needed

Planning consent was granted for the Drury Central and Paerata stations in February 2022, with further work being undertaken to gain approval for the Drury West station.[10]

The new stations have attracted criticism from public transport advocates, who say that they are too designed for auto-dependency.[11]

In May 2022, KiwiRail and Auckland Transport announced proposed names for the three stations, replacing the placeholder names of Paerata, Drury West, and Drury Central. These names were gifted by mana whenua, in order to restore the original te reo Māori names of the area.[12] The placeholder name of Drury Central was replaced by Maketuu, paying tribute to the traditional name of the Maketuu stream, as well as the historic name of Te Maketuu Pā, nowadays known as the Pratts Road Historic Reserve, which are both located nearby.[13]

In August 2022, the New Zealand Geographic Board returned its verdict on the name, rejecting the use of double vowels as preferred by the Mana Whenua Forum, and also rejecting the use of 'Maketuu' as a name, saying it had little association with the local area and may be confusing. Instead, they recommended the name 'Drury'. The iwi involved expressed strong dislike of the decision, saying that the new proposed name is heavily associated with colonisation, and exclusive of Māori ancestral interests in the area. The public consultations on the name change ran until early November that year. The Board's recommended name was approved by the Land Information Minister Damien O'Connor in March 2023.Шаблон:Citation needed

See also

References

Шаблон:Reflist

External links

Шаблон:Public transport in Auckland Шаблон:Franklin Local Board Area Wairoa Subdivision Шаблон:Papakura Local Board Area