Версия от 15:15, 1 марта 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{short description|Dedicated freight railway under construction in India}} {{Use dmy dates|date=March 2021}} {{Use Indian English|date=March 2018}} {{Infobox rail line | box_width = 300px | name = Eastern Dedicated Freight Corridor | other_name = | native_name = | native_name_lang...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates Шаблон:Use Indian English Шаблон:Infobox rail line

Eastern Dedicated Freight Corridor or Eastern DFC is a broad gauge freight corridor in India. The railway will run between Ludhiana in Punjab and Dankuni (near Kolkata) in West Bengal via Meerut and Khurja in Uttar Pradesh.[1] This railway line is one of the multiple freight corridors being constructed by the Dedicated Freight Corridor Corporation of India (DFCCIL), a public-sector unit (PSU) under the Ministry of Railways.

Logistic Hub and Network

A large Logisitic Hub is proposed in Meerut, which is well connected to EDFC and several expressways.

The Eastern DFC will mostly have double tracks and will be electrified, but the section from Ludhiana to Khurja (365 km) will be single line electrified due to lack of space. This freight corridor will cover a total distance of 1,839 km. This corridor is having a 46 km branch line which is joining Khurja (Bulandshahr district) on the Eastern DFC with Dadri (Gautam Buddha Nagar district) on the Western Dedicated Freight Corridor (Western DFC).

As of August 2023, 1150 km or 86% of the Eastern DFC has been completed and 99% required land for these have been acquired.[2] First two DFCs, Western DFC, from Dadri, Uttar Pradesh to JNPT (Navi Mumbai) and Eastern DFC from Punjab to West Bengal, which will decongest the railway network by moving 70% of India's goods trains to these two corridors.

Route

The freight corridor will cover first 447 km of Ludhiana - Dhari - Khurja section with single electrified track. After this the remaining line will be double track electrified up to Dankuni in West Bengal. This will pass through the important districts of Sahnewal, Doraha, Ludhiana, Sirhind, Rajpura, Ambala, Yamunanagar, Saharanpur, Muzaffarnagar, Meerut (Logistic Hub), Hapur, Bulandshahr, Aligarh, Hathras, Barhan, Tundla, Firozabad, Etawah, Kanpur, Prayagraj and Chandauli. To reduce load over the main line, this line will have many junctions. The proposed junctions on this line are Dhandharikalan, Sirhind, Rajpura, Khalanaur, Khurja, Daudkhan, Tundla, Bhaupur, Prempur, Karchhana, Jeonathpur, Mughalsarai Junction railway station, Ganjkhwaja, Sasaram, Dehri On Sone, Son Nagar, Gomoh, Andal, Bardhaman and Dankuni (The eastern terminal point).

Eastern DFC
State Distance Covered
Punjab 88
Haryana 72
Uttar Pradesh 1076
Bihar 236
Jharkhand 199
West Bengal 202
Total 1873

Logistic hub

A large logistic hub is also proposed in Meerut, since the city is suitable major hub due to its well connectivity and proximity with expressways like Delhi Meerut Expressway, Ganga Expressway, Delhi Mumbai Expressway, Yamuna Expressway and upcoming Meerut Haridwar Expressway. [3]

The land around the departure points of Meerut, from where the expressway is to start, will be developed for industries.

Ashok Agarwal, national president, Indian Industries Association (IIA), said “We have also received queries related to the allotment of land along the Ganga Expressway from investors. Most of the queries are for land in Meerut, Budaun and its adjoining areas”.

Government proposed following investment zones -

  • Meerut along Delhi Meerut Expressway
  • Meerut Muzaffarnagar Investment region
  • Dadri Noida Ghaziabad Investment Region

Construction

This corridor is divided into multiple sections for contracting purposes.[4][5]

Eastern DFC
Section Distance in km Route Status Project contractor Completion Date
Ludhiana - Khurja 365 Ludhiana-Ambala-Yamunanagar-Saharanpur-Muzaffarnagar-Meerut-Hapur-Bulandshahr-Khurja Шаблон:Active GMR Group 2023 August
Dadri - Khurja (branch line) 46 Dadri-Khurja Шаблон:Active GMR Group 2022 October
Khurja - Bhaupur 351 Khurja-Aligarh-Hathras-Tundla-Etawah-Bhaupur Шаблон:Active [6] Tata Projects India- Aldesa Group[7][8] 2020 December
Bhaupur - Manauri - New Ganjkhwaja 279 Bhaupur-Prempur-Manauri (near Prayagraj)-Chheoki East/ Karchhana west (near Prayagraj) - New Ganjkhwaja Шаблон:Active GMR Group[9] 2023 June
New Ganjkhwaja - New Chiraila Pauthu 123 New Ganjkhwaja - Pt Deen Dayal Upadhyay Nagar - New Chiraila Pauthu Шаблон:Active GMR Group[9] 2021 July
New Chiraila Pauthu - Sonnagar 137 New Chiraila Pauthu - Dehri On Sone-Sonnagar Шаблон:Active C&C Construction Gurgaon and BSCPL 2021 December
Sonnagar - Dankuni 538 Sonnagar-Gomoh-Dankuni Шаблон:Pending PPP Model
Total 1839

Operations control center (OCC)

Built by Alstom at Prayagraj, OCC will house command and control center to monitor all trains and power supply systems on Eastern Dedicated Freight Corridor.[10] It will be staffed by 150 people and the facility is spread across 4.2 acres.[11][12]

Файл:Djg9hqNXsAA8fRi.jpg
Bhadan and Khurja section of Eastern DFC in 2018.

Latest Map from DFCCIL: https://dfccil.com/images/uploads/img/MapDFC_NIZC.png

Status updates

  • Apr 2005: The project is announced by the then Prime Minister of India Manmohan Singh.
  • Oct 2006: The Dedicated Freight Corridor Corporation of India (DFCCIL) is formed by the Ministry of Railways on 30 October.
  • Feb 2008: The Cabinet Committee on Economic Affairs (CCEA) approves the Western DFC and the Eastern DFC.
  • Sep 2009: The Union Cabinet approved a JICA loan.
  • 2018-19: DFC is revived by the Union government after a decade of inactivity, with a target of going live by March 2023. However, the COVID crisis stalls the project's progress, and the timelines are shifted by a year. A major part of the project becomes operational by 2023. Шаблон:Citation needed
  • Jun 2023: 77% of the DFC is completed and the project is set to be completed by the end of 2023. [13]
  • Oct 2023: The last leg of the Eastern DFC underwent a successful trial run. With this, the line is completed to Son Nagar.[14]
  • Feb 2024: Construction has been completed.[15]