Английская Википедия:Energoprojekt holding

Материал из Онлайн справочника
Версия от 19:01, 3 марта 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|Serbian engineering company}} {{Infobox company | name = Energoprojekt holding | logo = Energoprojekt holding LOGO.svg | logo_size = 250px | caption = | traded_as = BELEX: [http://www.belex.rs/trgovanje/hartija/dnevni/ENHL ENHL] | type = Joint-stock company | native_name...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Infobox company Energoprojekt holding (full legal name: Energoprojekt holding a.d. Beograd) is a Serbian construction company with headquarters in Belgrade, Serbia. Founded in 1951, it enters into the composition of BELEX15 and BELEXline, the two main indices of the Belgrade Stock Exchange.[1][2]

History

Energoprojekt holding was founded on 11 July 1951. Originally conceived as a consulting company, it has gradually diversified its activities and today it has numerous subsidiaries and joint ventures in Serbia and abroad. Energoprojekt holding was admitted to the regulated market of the Belgrade Stock Exchange 18 July 2007.[3]

In July 2017, after months of negotiations, Napred Razvoj, a Serbian construction company, became the majority stakeholder of the company.[4] In November 2017, a new majority shareholder Napred razvoj has decided to sell insurance subsidiary Energoprojekt Garant to the Slovenian insurance company Sava Osiguranje.[5]

Activities

Energoprojekt holding is a worldwide company based in Serbia and develops activities in the fields of energy, industry, architecture, infrastructure, environment and information technologies,[6] it operates through its subsidiaries Energoprojekt Hidroinženjering (engineering, hydropower, water supply systems and irrigation), Energoprojekt Urbanizam i arhitektura (building, engineering and construction), Energoprojekt Entel (engineering, energy, power plants, transmission and distribution of electricity), Energoprojekt Industrija (engineering, industrial plants and facilities), Energoprojekt Visokogradnja (building, engineering and construction, civil engineering, industrial and energy installations), Energoprojekt Niskogradnja (construction, various facilities in infrastructure), Energoprojekt Oprema (constructions in the areas of energy, of water management and industry), Energoprojekt Energodata (Information Technology) and Energoprojekt Garant (insurance).Шаблон:Citation needed

Locations and operational activities

Aside from Serbia, Energoprojekt holding is represented in:

Achievements

Among the projects undertaken by Energoprojekt holding include plant Iron Gate I Hydroelectric Power Station, near Kladovo (designed jointly with the Institute of Hydroelectrical Researches in Bucharest, Romania between 1956 and 1960) and the dam and power plant Bajina Bašta. The company has also built power plants of Obrenovac and Obilić, while outside of Serbia it has conducted two power plants in Qatar. In Belgrade, in the field of architecture, it has built Belgrade Arena, the Hotel Hyatt Regency Belgrade, a mansion for Robert Mugabe in Harare and others.

Hydropower plants in Serbia

Buildings in Serbia

Market data

As of 8 March 2019, Energoprojekt holding has a market capitalization of 58.33 million.[7]

See also

References

Шаблон:Reflist

External links

Шаблон:BELEX15 companies Шаблон:BELEXline companies