Шаблон:Infobox oil refinery Filyos Natural-gas Processing Plant (Шаблон:Lang-tr) is a plant under construction for natural-gas processing located at the port of Filyos in Çaycuma district, Zonguldak Province, Turkey.[1][2]
The plant will purify raw natural gas delivered by submarine pipelines from the offshore platforms on the Sakarya gas field in the Turkish part of the Black Sea.[3] It is expected that the laying down of nearly Шаблон:Cvt-long pipeline undersea will start in June 2022.[1][2][4] It is planned that the construction of the pipeline with pipes of Шаблон:Cvt length each will last around five months.[4] The plant will be connected to the national natural gas pipeline system in the first quarter of 2023,[4] and will eventually process 3.5 billion cubic metres a year.[5] It is being constructed by TPAO,[3] and will be run by BOTAŞ.[2]
References
- ↑ 1,0 1,1 Ошибка цитирования Неверный тег
<ref>
; для сносокh1
не указан текст - ↑ 2,0 2,1 2,2 Ошибка цитирования Неверный тег
<ref>
; для сносокsd1
не указан текст - ↑ 3,0 3,1 Ошибка цитирования Неверный тег
<ref>
; для сносокib1
не указан текст - ↑ 4,0 4,1 4,2 Ошибка цитирования Неверный тег
<ref>
; для сносокaa1
не указан текст - ↑ Шаблон:Cite web
- Английская Википедия
- Proposed energy infrastructure in Turkey
- Natural gas pipelines in Turkey
- Black Sea energy
- Buildings and structures in Zonguldak Province
- Buildings and structures under construction in Turkey
- Çaycuma District
- Natural gas in Turkey
- Страницы, где используется шаблон "Навигационная таблица/Телепорт"
- Страницы с телепортом
- Википедия
- Статья из Википедии
- Статья из Английской Википедии
- Страницы с ошибками в примечаниях