Английская Википедия:Firswood tram stop

Материал из Онлайн справочника
Версия от 00:35, 8 марта 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|Manchester Metrolink tram stop}}{{Use dmy dates|date=January 2017}} {{Use British English|date=January 2017}} {{Infobox station | style = Manchester Metrolink | name = Firswood | type = Metrolink station | image = File:Firswood Metrolink Tram Stop (geograph 5562253).jpg | borough = {{Comma separated entries|Firswood|Trafford}} | coun...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short descriptionШаблон:Use dmy dates Шаблон:Use British English Шаблон:Infobox station Firswood is a tram stop on the South Manchester Line (SML) and Airport Line of Greater Manchester's light-rail Metrolink system. Located in the Firswood area of Stretford, it was built as part of Phase 3a of the network's expansion, and opened on 7 July 2011.[1]

Firswood Metrolink station is located on a section of the former Cheshire Lines Committee railway line, in a cutting adjacent to St John Vianney School on Rye Bank Road. The stop provides access to both Firswood and Whalley Range.

History

Шаблон:See also The station opened on 7 July 2011.[1] and is the first newly constructed station on the new South Manchester Metrolink line out of Manchester. Firswood is a new station on a re-opened railway line, the Cheshire Lines Committee line, which closed to passenger service in 1967. It was planned to re-open the line as part of the expansion of the Manchester Metrolink tram network.[2] Proposals to re-open the line have been put forward since the 1980s,[3] but remained unfunded until the 2000s. The line extension which was originally proposed would take over the disused tracks of the Cheshire Lines Committee as far as East Didsbury.

In 2006, it was announced that Phase 3A would go ahead, including the extension of the network as far St Werburgh's Road.[4] Following the rejection of the Greater Manchester Transport Innovation Fund in a public referendum in 2008, extension of the line as East Didsbury (Phase 3B) will now go ahead with funding from national and local government.[2][5][6]

Construction of the line began in April 2009 and the new line became operational in July 2011.[1]

Services

Firswood is located on the South Manchester Line with trams towards Шаблон:Tram via Victoria and Oldham and to Шаблон:Tram running every 12 minutes Monday-Saturdays and Sunday daytime and every 15 minutes Sunday early mornings and evenings.[7] Services extended from St Werburgh's Road to Шаблон:Tram on 23 May 2013 and, from 3 November 2014, services ran to Шаблон:Tram from Шаблон:Tram.

Service pattern

Connecting bus routes

Firswood is not served by any direct bus service but some services stop nearby to the stop. Stagecoach Manchester service 15 stops on King's Road and runs westbound to Flixton via Stretford and Urmston and eastbound to Manchester.[8]

Gallery

References

Шаблон:Reflist

External links

Шаблон:Greater Manchester Metrolink stations