Английская Википедия:Garsen–Witu–Lamu Highway
Шаблон:Short description Шаблон:Use dmy dates Шаблон:Infobox road
Garsen–Witu–Lamu Highway is a road, under construction in Kenya, connecting the towns of Garsen,Witu and Lamu.[1]
Location
The road starts at Garsen, in Tana River County, pursuing a general easterly direction through Witu to end at Mokowe in Lamu County, where the ferry connects to Lamu Island, a total distance of about Шаблон:Convert.[2] However the construction contract gives the distance as Шаблон:Convert.[1]
Overview
This road, is an important trade corridor for traffic headed from Nairobi, South Sudan and Ethiopia, to the proposed Port Lamu and is a component of the Lamu-Moyale Highway, part of LAPSSET.[3][4][5][6]
Upgrade and funding
The government of Kenya, using locally sourced funds, plans to upgrade the entire road to class II bitumen surface with shoulders, culverts and drainage channels. Kenya National Highway Authority is handling the hiring of a qualified, competent contractor to carry on the work.[4][5]
H-Young Company was selected to improve the surface to grade II bitumen standard, widen the road to Шаблон:Convert across, with culverts, drainage channels and side paths at a cost of KSh10.8 billion (US$108 million). As of December 2018, construction works were approximately 20 percent complete, with a completion date of December 2019.[1]
In December 2020 The EastAfrican newspaper reported construction progress at 75 percent, with commissioning expected in October 2021.[7]
In March 2021, The Star Kenya reported work progress at an estimated 87 percent complete. At that time the road length is reported as Шаблон:Convert long. Completion is expected later in 2021.[8]
See also
References
External links
- Webpage of the Kenya National Highway Authority
- Highways agency seeks Nema nod for Lamu-Garissa road