Английская Википедия:Georgia State Route 201

Материал из Онлайн справочника
Версия от 17:37, 12 марта 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|State highway in Georgia}} {{Infobox road |state=GA |type= GA |route=201 |map={{maplink-road|from=Georgia State Route 201.map}} |map_custom=yes |map_notes=SR 201 highlighted in red |length_mi=20.9 |length_round=1 |length_ref=<ref name="Google">{{Google maps |url=https://maps.google.com/maps?saddr=GA-201+N&daddr=S+Spring+St&hl=en&ll=34.798017,-85.020447&spn=0.299969...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Infobox road

State Route 201 (SR 201) is a Шаблон:Convert state highway in the northwestern part of the U.S. state of Georgia. It travels from Villanow, in Walker County northeast to Varnell, in Whitfield County.

Route description

Файл:Georgia State Route 201 in Villanow, Oct 2016.jpg
SR 201 in Villanow, Georgia

SR 201 begins at an intersection with SR 136 in Villanow. It heads north-northeast, through portions of the Chattahoochee-Oconee National Forest, until it enters Whitfield County. The highway continues to the north-northeast, and travels through the unincorporated community of Mt. Vernon. Shortly afterward, SR 201 travels past the western edge of Rocky Face. There, it intersects US 41/US 76/SR 3 (Chattanooga Road), and the four highways travel concurrently north to Tunnel Hill, where SR 201 departs to the northeast, while US 41/US 76/SR 3 continue on Chattanooga Road. Just past the northeastern edge of Tunnel Hill is an interchange with Interstate 75 (I-75; Larry McDonald Memorial Highway). SR 201 continues heading northeast until it meets its northern terminus, an intersection with SR 2 in Varnell.[1]

SR 201 is not part of the National Highway System, a system of roadways important to the nation's economy, defense, and mobility.[2]

History

The roadway that would eventually become SR 201 was established between 1926 and the end of 1929 as part of SR 2, but on a slightly different path, from Villanow to Dalton.[3][4] The next year, this segment's northern end was shifted to the northwest to travel from Villanow to US 41/SR 3 in Tunnel Hill. Its southern part was under construction.[5][6] By the end of 1931, the southern part had completed grading, but no surface course, while the northern part was under construction.[6][7] In February 1932, the southern end was shifted slightly to the west.[8][9] In July of the next year, this entire segment of SR 2 had a "sand clay or top soil" surface.[10][11] Around the middle of 1934, the entire segment had a "completed semi hard surface".[12][13] At the beginning of 1940, SR 158 was established from US 41/SR 3 in Tunnel Hill to SR 71 in Varnell.[14][15] Later that year, the Whitfield County portion of the Villanow–Tunnel Hill segment of SR 2 had a "completed hard surface".[15][16] At the end of 1941, the entire length of SR 158 was redesignated as part of SR 201.[17][18] By the end of 1946, SR 2 in Tunnel Hill was shifted back to Dalton, with the entire segment from Villanow to Dalton hard surfaced.[19][20] By the beginning of 1948, all of SR 201 at the time, except for its northern terminus, had a "sand clay, top soil, or stabilized earth" surface. Its northern terminus was hard surfaced.[20][21] The next year, SR 2 was shifted north. Its segment northeast of Villanow was redesignated as a southern extension of SR 201. The highway's northern segment was replaced by SR 2's new routing, thereby truncationg it to the western part of Varnell.[21][22] In 1953, the segment from Tunnel Hill–Varnell was hard surfaced.[23][24] Шаблон:-

Major junctions

Шаблон:Jcttop Шаблон:GAint Шаблон:GAint Шаблон:GAint Шаблон:GAint Шаблон:GAint Шаблон:Jctbtm

See also

References

Шаблон:Reflist

External links

Шаблон:AttachedKML