Английская Википедия:Guangtong–Dali railway
Шаблон:Short description The Guangtong–Dali or Guangda railway (Шаблон:Zh), is a single-track electrified railroad in Yunnan Province of Southwest China. The line branches off from the Guangtong station, near Kunming on the Chengdu–Kunming railway and runs west to Dali City. The line is Шаблон:Convert in length and was built from May 1992 to June 1998.[1] Major cities and towns along the route include Chuxiong City, Nanhua, Xiangyun County, Midu County and Dali.
Construction on a new, 175-km dual-track electrified section of the line began in September 2010. Difficulties in construction included 110,000 cubic meters of water inundation of the tunnels. The new electrified line is scheduled to open for traffic in July 2018, upping speeds from 60 to 200 km/h and doubling the track.[2]
Rail connections
- Guangtong: Chengdu–Kunming railway to Kunming
- Dali: Dali–Lijiang railway, Dali–Ruili railway
See also
References
Шаблон:Kunming–Singapore railway
Шаблон:PRChina-rail-transport-stub