Версия от 16:10, 18 марта 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|Road in Vietnam}} {{Infobox road | country = VNM | type = CT | route = 06 | alternate_name = Đường cao tốc Hải Phòng – Hạ Long – Vân Đồn – Móng Cái | translation = Hai Phong–Ha Long–Van Don–Mong Cai Expressway | length_mi = |length_km = 175 |length_ref = |established = 1 September 2018 | ahn = | maint = SunGroup | map...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Infobox road

The Haiphong–Ha Long–Van Don–Mong Cai Expressway (Шаблон:Lang-vi) is an expressway in Vietnam, connecting Hanoi with the east border town of Mong Cai, towards Dongxing in China. It connects to G7511 Qinzhou–Dongxing Expressway on the Chinese side of the border.

Construction

Haiphong–Ha Long

This section starts at Haiphong, connecting to the Hanoi–Haiphong Expressway. It was built at a total investment cost of VND 25,000 billion. The total length is Шаблон:Convert. The maximum speed is Шаблон:Convert.[1] The government of Quảng Ninh province invested 6,400 billion VND in this section, making it one of the first examples of regional government investment in expressways.[2][3]

Ha Long–Van Don

The investment cost for this Шаблон:Convert, four-lane section was VND 12,000 billion. It opened in December 2018.[4] The toll amount was set at VND 2,100/km.[5][6] The expressway currently ends at Van Don International Airport.

Van Don–Mong Cai

This section runs from Van Don Airport to the border with China at Móng Cái, totaling 80 km, with an investment cost of VND 11,195 billion, financed through a 19-year build-operate-transfer contract with a Sun Group daughter company. Travel time between the two termini was shortened from 120 minutes to 50 minutes and the maximum speed was initially 100 km/h, and was later modified to 120 km/h. Construction started in 2020 and finished on 30 April 2022.[7][8][9]