Английская Википедия:Haldibari–New Jalpaiguri line

Материал из Онлайн справочника
Версия от 18:17, 18 марта 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|Railway line in India}} {{Use dmy dates|date=January 2016}} {{Use Indian English|date=January 2016}} {{Infobox rail line | box_width = 32em | name = Haldibari–New Jalpaiguri line | color = | logo = <!-- Do NOT place a non-free image here without complying with WP...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates Шаблон:Use Indian English Шаблон:Infobox rail line The Haldibari–New Jalpaiguri line connecting Шаблон:Stnlnk in Cooch Behar district and Шаблон:Stnlnk in Jalpaiguri district in the Indian state of West Bengal, was since 1878 a part of the Kolkata–Siliguri broad-gauge route. With the partition of India in 1947, while the main part of the route lay in East Pakistan, later Bangladesh, the two ends of the route lying in India were detached. (For more details see Howrah–New Jalpaiguri line). However, the route continued to be operational till the Indo-Pakistani War of 1965. Thereafter, the route had been closed till its reopening in 2020. The rest of the line had been in use in the respective countries.

Gauge changes

The Siliguri–Haldibari line has gone through two successive gauge changes. The line was initially built in Шаблон:Track gauge broad gauge by the Eastern Bengal Railway. After partition of India since most of the other railway tracks in the area were metre gauge, the line was converted from Шаблон:Track gauge broad gauge to metre gauge in 1949. Then in the 1960s, when broad gauge was introduced in the area, the line was converted back to broad gauge and connected to the new station at New Jalpaiguri.[1]

Haldibari–Chilahati section

There were regular services running through the Haldibari-Chilahati section until the Indo-Pakistani War of 1965 following which the services were abandoned. Following the independence of Bangladesh there were plans to re-open the section. Bangladesh Railway had to construct 7.5 kilometres of new rail tracks from Шаблон:Stnlnk to reach the border while the Indian authorities had to set up 4.5 kilometres of tracks from its border to Haldibari railway station.[2]

In the Joint Statement issued on the occasion of the visit of the Prime Minister of India to Bangladesh, on 7 September 2011, it was stated: " Bangladesh Prime Minister expressed her appreciation to the Indian Prime Minister for amendment of the MoU between the Bangladesh and Indian Railways allowing Rohanpur-Singabad as an additional route for both bulk and container cargo for Nepalese rail transit traffic. Bangladesh side also appreciated the assistance from India for the movement of fertilizers from Bangladesh to Nepal by rail route. They also agreed to re-establish rail connections between Chilahati–Haldibari and Kulaura–Mahishashan in the spirit of encouraging revival of old linkages and transport routes between the two countries."[3]

The Haldibari-Chilhati section was reopened on 17 December 2020. The railway link was inaugurated by the Indian prime minister Narendra Modi and his Bangladeshi counterpart Sheikh Hasina, in a virtual bilateral summit.[4][5][6]

Electrification

The New Jalpaiguri–Raninagar Jalpaiguri section was completely electrified in 2021 as a part of the Katihar-Guwahati route electrification.[7] The Raninagar Jalpaiguri-Haldibari section's electrification was completed in 10 January 2024.[8]

References

Шаблон:Reflist

External links

  • All trains from New Jalpaiguri to Haldibari [1]
  • All trains from Haldibari to New Jalpaiguri [2]

|Шаблон:Railways in Eastern India Шаблон:Railways in North-East India Шаблон:Jalpaiguri topics