Английская Википедия:Hardings Wood Junction

Материал из Онлайн справочника
Версия от 09:13, 19 марта 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|Canal junction in Staffordshire, England}} {{Use dmy dates|date=March 2018}} {{Use British English|date=March 2018}} {{Infobox Canal |name = Hardings Wood Junction |image = TandMJunctionMacclesfield.JPG |image_caption = The junction, viewed from the island between a pair of parallel locks. The Trent and Mersey Canal runs both sides of the...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates Шаблон:Use British English Шаблон:Infobox Canal Шаблон:Hardings Wood Junction map Hardings Wood Junction (Шаблон:Gbmapping) is a canal junction near Kidsgrove, Staffordshire, England and the point at which the Macclesfield Canal (or, historically, the Hall Green Branch) joins the Trent and Mersey Canal. It opened in 1831.

History

The Trent and Mersey Canal was authorised by an Act of Parliament in 1766, and construction began at once. After rising through 40 locks from Shardlow on the River Trent, the Шаблон:Convert canal had a short summit section, most of which was through the Шаблон:Convert Harecastle Tunnel, before it began its descent through another 36 locks to reach Preston Brook and the Bridgewater Canal. It was completed in 1777.[1]

From the time of its opening, there were plans for a canal through Macclesfield, but no firm action was taken until 1824. Thomas Telford produced a survey in 1825, and an Act of Parliament was obtained in 1826, but although it was based on Telford's design, he did not oversee the work, which was managed by William Crosley.[2] At the same time, Brindley's original tunnel at Harecastle was sinking, and Telford's new tunnel was authorised in 1823, which would be larger than the old one, and would incorporate a towpath. It was slightly longer, at Шаблон:Convert but was completed in just over two years, opening on 16 March 1827.[3] The Trent and Mersey were keen to ensure that none of their limited water supply was lost to the Macclesfield Canal, and obtained an Act of Parliament in 1827, which gave them powers to build the first Шаблон:Convert of it, to Hall Green Stop Lock. They insisted that the water level of the Macclesfield canal should be maintained Шаблон:Convert higher than their section, which was known as the Hall Green Branch, so that water passed from the Macclesfield Canal, rather than to it. The canal, and hence the junction, opened in 1831.[4][5]

Location

The junction lies close to the northern portal of the Harecastle Tunnel. The Trent and Mersey Canal turns to the west after leaving the tunnel, and the Hall Green Branch initially turns off to the south. There is a sharp right-hand bend, after which it runs parallel to the main line, which descends through two locks. There is then another sharp right-hand bend, and the branch crosses over the main line on an aqueduct. The Macclesfield Canal is Шаблон:Convert long from the stop lock to Marple Junction, and ascends through a single flight of 12 locks, located Шаблон:Convert from the stop lock. Since both canals are now managed by British Waterways, the Hall Green Branch is usually considered to be part of the Macclesfield Canal.[6][5] The summit level of the Trent and Mersey is Шаблон:Convert long, and ends close to the junction at lock 41. Travelling south, the other end of the summit is at lock 40, just after Etruria Junction, where the Caldon Canal joins the main line.[7]

See also

Шаблон:Portal

Bibliography

Шаблон:Refbegin

Шаблон:Refend

References

Шаблон:Reflist

Шаблон:Coord