Английская Википедия:Helix Producer 1

Материал из Онлайн справочника
Версия от 11:30, 20 марта 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Use dmy dates|date=February 2019}} {|{{Infobox ship begin |display title=ital}} {{Infobox ship image | Ship image = HelixProducer1FlaringGas.JPG | Ship caption = ''Helix Producer I'' seen flaring natural gas in the Gulf of Mexico over the Phoenix Field. }} {{Infobox ship career | Ship name =*''Helix Producer I'' *''Karl Carstens'' (1986–2009...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Use dmy dates

Шаблон:Infobox ship imageШаблон:Infobox ship careerШаблон:Infobox ship characteristics

Helix Producer I is a ship-shaped monohull floating production and offloading vessel, converted from the ferry MV Karl Carstens. It has no storage capability.[1]

MV Karl Carstens

The ship was built in 1986 for Deutsche Bundesbahn as a roll-on roll-off (RORO) ferry serving on the Vogelfluglinie, a connection between Fehmarn, Germany and Denmark. It remained in service from 1986 until 1997.

Helix Producer I

The ship was reconfigured as a Floating Production vessel and converted between 2006–2008 at the Viktor Lenac Shipyard in Croatia.[1][2] Topside production facilities were designed by OFD Engineering in Houston, Texas and installed in 2009 at the Kiewit shipyard in Corpus Christi, Texas, United States.[3]

Helix Producer I has a Disconectable Transfer system (DTS) designed and supplied by Flexible Engineered Solutions LTD (FES), UK, and consists of a riser buoy supporting sub-sea risers and control umbilicals that would be connected to a deep water well and can be released from the hull, allowing the vessel to move out of the way of an approaching hurricane. After the storm, the vessel would return to the site and reconnect the buoy resuming normal oil extraction. It is operated by the Helix Energy Solutions Group and was scheduled to operate on the Phoenix Oil Field in the Gulf of Mexico, but on 14 June 2010 Helix announced that the ship would be directed to assist BP at the Deepwater Horizon oil spill site.[4]

In its new configuration the ship has a length of Шаблон:Convert, a breadth of Шаблон:Convert (increased from before Шаблон:Convert), a depth of Шаблон:Convert, and a draft of Шаблон:Convert. The vessel has a maximum displacement of Шаблон:Convert, and as a light ship of Шаблон:Convert.[1]

Service at Deepwater Horizon site

In June 2010, BP announced that Helix Producer I would join Discoverer Enterprise and Toisa Pisces at the Deepwater Horizon site to process oil that is flowing from the deepwater well. While Discover Enterprise can process about 18,000 barrels (760,000 US gallons; 2,900 cubic metres) of oil per day, Helix Producer I can handle about 30,000 barrels.[5] The estimate of the uncontrolled oil flow at that time was up to 60,000 barrels. It was anticipated that Helix Producer I would be used for 2 months for this mission.[5] Oil from Helix Producer I was to be offloaded by a shuttle tanker. Starting in early August mud, later cement was pumped into the well, eventually closing it, so that by 19 September 2010, it could be announced that the Macondo Well had been finally killed.[6]

References

Шаблон:Reflist

Шаблон:Deepwater