Английская Википедия:History of the Staten Island Railway

Материал из Онлайн справочника
Версия от 06:07, 22 марта 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|none}} {{good article}} {{Use mdy dates|date=February 2018}} thumb|right|300px|A Staten Island Railway local train of [[R44 (New York City Subway car)|R44s at the Oakwood Heights station]] File:Proposed Staten Island Rapid Transit Route.png|A p...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Good article Шаблон:Use mdy dates

Файл:MTA Staten Island Railway local train at Oakwood Heights.jpg
A Staten Island Railway local train of R44s at the Oakwood Heights station
Файл:Proposed Staten Island Rapid Transit Route.png
A plan from 1883 showing the planned routes of the North Shore and East Shore lines in addition to the then-existing line.

The Staten Island Railway (SIR) is the only rapid transit line in the New York City borough of Staten Island and is operated by the Staten Island Rapid Transit Operating Authority, a unit of the Metropolitan Transportation Authority. The railway was historically considered a standard railroad line, but today only the western portion of the North Shore Branch, which is disconnected from the rest of the SIR, is used by freight and is connected to the national railway system.

While the first rail proposal for rail service on Staten Island was issued in 1836, construction did not begin until 1855 after the project was attempted a second time under the name Staten Island Railroad. This attempt was successful due to the financial backing of William Vanderbilt. The line opened in 1860 and ran from Tottenville to Vanderbilt's Landing and connected with ferries to Perth Amboy, New Jersey and New York, respectively. After the Westfield ferry disaster at Whitehall Street Terminal in 1871, the railroad went into receivership and was reorganized into the Staten Island Railway Company in 1873. In the 1880s, Erastus Wiman planned a system of rail lines encircling the island using a portion of the existing rail line, and organized the Staten Island Rapid Transit Railroad in 1880, in cooperation with the Baltimore & Ohio Railroad (B&O), which wanted an entry into New York. B&O gained a majority stake in the line in 1885, and by 1890 new extensions to the line were in service. In 1890, the Arthur Kill Bridge opened, connecting the island to New Jersey. This route proved to be a major freight corridor. After a period of financial turmoil in the 1890s which saw both B&O and the Staten Island Rapid Transit Railroad company enter bankruptcy, the railroad was restructured as the Staten Island Rapid Transit Railway (SIRT), and was purchased by the B&O in 1899.

In 1924, SIRT began electrification of its lines, to comply with the Kaufman Act, which had become law the previous year. New train cars, designed to be compatible with subway service, were ordered, and electric service was inaugurated on the system's three branches in 1925. Through the 1930s and 1940s grade-crossing elimination projects were completed on the three branches. During World War II, freight traffic on the SIRT increased dramatically, briefly making it profitable. In 1948, the New York City Board of Transportation took over all of the bus lines on Staten Island, resulting in a decrease in bus fares from five cents per zone to seven cents for the whole island. Riders of the SIRT flocked to the buses, resulting in a steep drop in ridership. Service on the branches was subsequently reduced. In 1953, the SIRT discontinued service on the North Shore Branch and South Beach Branch. The South Beach Branch was abandoned shortly thereafter while the North Shore Branch continued to carry freight. While the SIRT threatened to discontinue service on the Tottenville Branch, the service was preserved as New York City stepped in to subsidize the operation. The last grade crossings on the line were eliminated in 1965. In 1971, New York City purchased the Tottenville line, and the line's operation was turned over to the Staten Island Rapid Transit Operating Authority, a division of the state-operated Metropolitan Transportation Authority (MTA). Freight service continued until 1991.

Improvements were made under MTA operations. The line received its first new train cars since the 1920s, and several stations were renovated. The MTA rebranded the Staten Island Rapid Transit as the MTA Staten Island Railway (SIR) in 1994. Fares on the line between Tompkinsville and Tottenville were eliminated in 1997 with the introduction of the MetroCard. In 2010, fare collection was reintroduced at Tompkinsville. A new station on the main line, Arthur Kill, opened in 2017, replacing the deteriorated Nassau and Atlantic stations. It was the first new station opened on the main line in seventy years. While the railway does not serve residents on the western or northern sides of the borough, light rail and bus rapid transit have been proposed for these corridors. Freight service in northwestern Staten Island was restored in the 2000s.

Corporate history

Years Company Abbreviation Notes
1836-1838 Staten Island Rail-Road Company Failed attempt to build the railway.[1]Шаблон:Rp
1851-1873 Staten Island Railroad Company SIRR Created by Vanderbilt in 1851; was sold to Law in 1872, and then sold to the Staten Island Railway Company in 1873.[1]Шаблон:Rp
1873-1884 Staten Island Railway Company SIRW Created to assume operations of the SIRR, and was leased by the SIRTR in 1884. It continued to operate as a separate company.[1]Шаблон:Rp
1880-1899 Staten Island Rapid Transit Railroad Company SIRTR Created to build extensions; was sold to the SIRT in 1899.[1]Шаблон:Rp
1899-1971 Staten Island Rapid Transit Railway Company SIRT Created to operate the SIRTR;[1]Шаблон:Rp was sold by the B&O to the MTA in 1971.

Was commonly known as the SIRT.[2]

1971–present Staten Island Rapid Transit Operating Authority SIRTOA Created in 1971 to transfer operations of the SIRT from the B&O to the Metropolitan Transportation Authority (MTA);[2] publicly known as MTA Staten Island Railway (SIR) since 1994.[3]

First line: 1836–1885

Файл:Staten Island Railway 1867.jpg
SIRT timetable, circa 1867

Initial efforts: 1836–1860

The railway's predecessor, the Staten Island Rail-Road Company, was incorporated on May 21, 1836. The charter called for the construction of a single or double-tracked line "commencing at some point in the town of Southfield, within one mile of the steamboat landing at the Quarantine, and terminating at some point in the town of Westfield; opposite Amboy." The proposed line would have run between the present-day locations of Clifton and Tottenville.[4]Шаблон:Rp[5]Шаблон:Rp[6]Шаблон:Rp The Шаблон:Convert route had an estimated cost of $300,000.[7]Шаблон:Rp However, the company lost its charter in 1838 because the railroad was not built within two years after it was incorporated.[1]Шаблон:Rp

Attempts to start a rail line on the island were restarted in 1849 and 1850, when residents of Perth Amboy and Staten Island held meetings concerning a possible Tottenville-to-Stapleton line. Like the previous attempt in 1836, they faced financial difficulties, and sought out the help of William Vanderbilt—a son of Cornelius "Commodore" Vanderbilt and a resident of Staten Island. Vanderbilt had conceived of such a railroad as a way to reduce the monopoly of the Camden and Amboy Railroad, which was the only mean of reaching Philadelphia. Passengers would take ferries from New York City to Amboy, the railroad to Camden, and finally a ferry to Philadelphia. Vanderbilt thought his railroad would cut travel times—passengers would take a ferry from New York to Staten Island, then take his railroad, before taking a ferry to Amboy—and eliminate the monopoly of the Camden and Amboy between New York City and its terminus in Amboy.[8] Since the plan conceived by the local residents followed Vanderbilt's proposed route, he helped charter the Staten Island Railroad Company (SIRR) on August 2, 1851, in order to build the rail line. The articles of association for the company were filed on October 18, 1851.[9]Шаблон:Rp

In 1852, the line was expected to cost $322,195. Two possible route options were considered; the first would start at New Ferry Dock in Stapleton, before passing through Rocky Hollow, following the valley between Castleton and Southfield Heights before descending to New Dorp. After going Шаблон:Convert through the valley, the line would curve toward Amboy Road before curving southward, passing Billop House, and ending near Biddle's Grove and the Amboy ferries. The second route would start at Vanderbilt's Landing and run through Clifton to New Dorp.[9]Шаблон:Rp

The railroad's charter gave it two years to be built. Like the original plan for the line, however, difficulties were encountered. One problem was the acquisition of property for the line's right-of-way; many property owners refused to sell their land, blocking the proposed line. To prevent the loss of the line's charter, in 1853, the company successfully petitioned for a two-year extension to build the line. In 1853, a bill giving the company the right to operate ferries between New York and Staten Island was passed.[10][11] Still facing difficulties, in January 1855 the company applied to the New York State Legislature for a three-year extension to complete the project. After all of the property required for the right-of-way was acquired, construction commenced in November 1855.[4]Шаблон:Rp[1]Шаблон:Rp[12]Шаблон:Rp The company, however, had run out of money to complete the line and asked Cornelius Vanderbilt—the sole Staten Island-to-Manhattan ferry operator—for a loan.[6]Шаблон:Rp Vanderbilt agreed to finance the railroad,[5]Шаблон:Rp but changed the northern terminal of the line from Stapleton to Vanderbilt's Landing, his ferry landing further east.[13]Шаблон:Rp Vanderbilt tried to stop competitors who had obtained a lease for the ferry at Vanderbilt's Landing before he could get a lease. He appointed James R. Robinson to build a structure to block his competitors, but on July 28, 1851, people tried to deconstruct the almost-finished structure and threatened to hurt Robinson if he tried to block them.[6]Шаблон:Rp In 1858, Cornelius's son William Vanderbilt was inducted onto the railroad's board of directors.[4]Шаблон:Rp

Opening: 1860

Stockholders and officials took an inaugural ride on the double-track line between Vanderbilt's Landing and Eltingville on February 1, 1860, and passenger operations began on April 23 that year.[5]Шаблон:Rp[6]Шаблон:Rp[14][15] At Vanderbilt's Landing, passengers continued their passage to Manhattan by ferry. The first locomotive was named "Albert Journeay", after the railroad's president. A second locomotive was added to the line on May 5, 1860; it was named "E. Bancker" after the company's vice-president.[16] The remainder of the line was expected to be completed in a month.[15]

Over the next month, the remainder of the line was built between Annadale and Pleasant Plains as a single-track line, with a passing siding at Huguenot, passing through mosquito-infested land laced with peat bogs and quicksand—an area known locally as Skunk's Misery. It took a lot of time and wood to build the sub-roadbed with logs. It was viewed as unlikely to be a worthwhile investment to double-track the line because of the low passenger volume south of New Dorp. South of Pleasant Plains, the line was double-tracked.[16] The line was extended to Annadale on May 14, 1860, and was completed to Tottenville on June 2, 1860, with a formal opening of the railroad.[6]Шаблон:Rp[17] The completion of the line to Tottenville allowed passengers to transfer to a ferry that crossed the Arthur Kill and allowed passage to Perth Amboy, New Jersey.[4]Шаблон:Rp[5]Шаблон:Rp[18]Шаблон:Rp Initially, services made eleven stops between Vanderbilt's Landing and Tottenville.[19] Many stations were named after nearby large farms, such as Garretson's and Gifford's. The stations built at Eltingville and Annadale—whose namesakes, the Eltings family and Anna Seguine, were influential in paying for the construction of the rail line—were the most elaborate.[16] The arrival of the railroad gave dignity to some locations on Staten Island; "Poverty Hollow" was renamed Rosebank, Oakwood became Oakwood Heights, and other places were renamed with the coming of the railroad.[20]

Файл:Staten Island RR 1864.jpg
Share of the Staten Island Rail Road Company, issued 28. March 1864, signed by William Henry Vanderbilt as president

In August 1860, the railroad was extended from the depot at Vanderbilt's Landing to the wharf, which allowed passengers to walk directly to the boat from the train instead of walking Шаблон:Convert along the sand. At the time, it took one and a half hours to get to Tottenville from Manhattan. Patronage of the rail line exceeded the greatest expectations of its projectors.[19] On February 27, 1861, the New Jersey Locomotive Works gave notice of foreclosure on the two locomotives; Cornelius Vanderbilt interceded again and on September 4, 1861, the SIRR was placed into receivership with William Vanderbilt to prevent the loss of the locomotives and rolling stock to creditors.[4]Шаблон:Rp[5]Шаблон:Rp[6]Шаблон:Rp The Vanderbilts had taken stock in the railroad but in 1863, William Vanderbilt managed the receivership well enough for it to be discharged, with the debt paid off. As a result, the railroad became property of the Vanderbilts; facilities were enlarged under their leadership—an expansion made possible by increasing the capital stock to $800,000 from $350,000.[8]

On October 5, 1861, in what might have been the first major accident on the railroad, Mary Austin, age 16, was killed by a train at Princess Bay as she crossed the tracks.[21]

Ferry conflicts: 1860–1884

Ferry service between Perth Amboy and Tottenville began in 1863, operated by the SIRR.[22] It was necessary to have a direct connection between the trains and the infrequent ferries to and from Manhattan, but this was difficult during the beginning of operation. The ferries serving Vanderbilt's Landing were owned by the attorney George Law. Vanderbilt tried to operate a ferry service between Manhattan and Staten Island that would compete with Law's. He also started construction on a central dock on the island, but he abandoned the scheme after a storm destroyed the timber work. Only the large stone foundation remained; it was still visible at low tide in 1900.[13]Шаблон:Rp

Vanderbilt was eventually forced to sell his ferry service to Law after a franchise battle.[5]Шаблон:Rp After the battle, Vanderbilt lost interest in transit operations on Staten Island and he handed the ferry and railroad operations to his brother Jacob H. Vanderbilt, who was the president of the company until 1883.[4]Шаблон:Rp[13]Шаблон:Rp[16] In March 1864, William Vanderbilt bought Law's ferries, bringing both the railroad and the ferries under the same company.[5]Шаблон:Rp In 1865, the railroad took over operation of the New York & Richmond Ferry Company, and would later assume direct responsibility for operating the ferry service to Manhattan.[4]Шаблон:Rp The Perth Amboy and Staten Island ferries were taken over by the railroad under the leadership of Jacob Vanderbilt, who increased service.[16]

Файл:Staten Island Railroad 1874 Timetable.jpg
1874 timetable

The SIRR and its ferry line were making a modest profit until the boiler of the ferry "Westfield" exploded at Whitehall Street Terminal on July 30, 1871, killing 85 and injuring hundreds.[4]Шаблон:Rp[5]Шаблон:Rp As president of the railway, Jacob Vanderbilt was arrested but was not charged.[23]Шаблон:Rp As a result of the disaster, on March 28, 1872, the railroad and the ferry went into receivership.[5]Шаблон:Rp[24]Шаблон:Rp On September 17, 1872, the property of the company was sold to George Law in foreclosure,[5]Шаблон:Rp with the exception of the ferry "Westfield", which was purchased by Horace Theall.[6]Шаблон:Rp[13]Шаблон:Rp Some time after, Law and Theall sold the SIRR and ferry to the Staten Island Railway Company (SIRW). Law had threatened to form a company of his own if the stockholders did not come to his terms promptly, but a deal was reached. The charter for the SIRW was created on March 20, 1873, and on April 1, 1873, Law transferred the SIRR's property to the SIRW for $480,000.[1]Шаблон:Rp[13]Шаблон:Rp[16][25]Шаблон:Rp The ferry operation was transferred to the newly formed Staten Island Railway Ferry Company. The ferry and rail services were split into separate rail companies to prevent problems with one from leading to the demise of the other, while ensuring that connecting service could still be provided for passengers.[22]

During the American Civil War, a boat connected with the SIRW, the "Southfield", was sold to the government and converted into a gunboat; it was destroyed during an attack on Mississippi. In 1876, competition to the SIRW's ferry system emerged: Commodore Garner obtained possession of a ferry and ran the "D. R. Martin" on the East Shore. However, this ferry service was suddenly ended when Garner died. His boats were purchased by John Starin, who paid $5,000 for each of them, and obtained a franchise. He operated it until it was taken over by the Staten Island Rapid Transit Railroad Company (SIRTR) on August 1, 1884.[13]Шаблон:Rp[26]Шаблон:Rp

SIRT/B&O operation: 1880–1900

Organization: 1880–1884

By 1880, the SIRW was barely operational, and as a result New York State sued through Attorney General Hamilton Ward to have the company dissolved in May that year. The suit said the company had become "insolvent in September 1872, to have then surrendered its rights to others, and have failed to exercise those rights". The legal proceedings commenced after an injunction was obtained that restrained the creditors of the railway company from proceeding against it until after the suit of the people was determined.[5]Шаблон:Rp[27] Although it was floundering, the railway become the centerpiece of a plan to develop the island by a Canadian, Erastus Wiman. In 1867, Wiman arrived in New York to oversee the main office of Dun, Barlow, and Company in New York.[18]Шаблон:Rp Wiman became one of the most prominent residents of Staten Island after moving into a mansion there. He was dubbed the "Duke of Staten Island," and was interested in developing the island; Wiman recognized that to succeed he would need to build a coordinated transportation hub with connections to New York City and New Jersey.[5]Шаблон:Rp[18]Шаблон:Rp To this end the Staten Island Rapid Transit Railroad Company (SIRTR) was organized on March 25, 1880[25]Шаблон:Rp and incorporated on April 14, 1880.[1]Шаблон:Rp

Wiman's plan called for a system encircling the island using two miles of the SIRW between Vanderbilt's Landing and Tompkinsville. His plan also called for the centralization of all ferries from one terminal, replacing the six to eight terminals active near what is now St. George. Wiman approached Robert Garrett, president of the Baltimore & Ohio Railroad (B&O), to back the plan, and Garrett agreed.[4]Шаблон:Rp The SIRTR began to seek legislation to acquire various rights-of-way needed to implement Wiman's plan. At that time, Wiman's company neither owned nor controlled a railroad; If it gained a charter to build connections, it would have had nothing to connect to. The SIRTR then began surveying for the proposed routes; in April 1881, it acquired Шаблон:Convert of critical right-of-way directly from George Law.[5]Шаблон:Rp When Wiman explained his plan he secured a waterfront option from Law; however, Law refused to renew the option when it expired. To persuade Law to renew it, Wiman offered to name the place "St. George." Law was amused by the gesture and granted Wiman the option.[28]Шаблон:Rp[29]Шаблон:Rp In October 1882, Wiman made an application for a wharf to land passengers from the SIRTR's planned new ferry service to Manhattan.[5]Шаблон:Rp

Clarence T. Barrett, Henry P. Judah, and Theodore C. Vermilyen were appointed as commissioners to appraise the value of the land required by the SIRTR to extend the Staten Island Railway from Vanderbilt's Landing to Tompkinsville. Work on the line was delayed until the commissioners reported.[30] The SIRTR filed a map of the proposed route at the office of the clerk of Richmond County. The line as planned would cross the lawn of Ms. Post on the North Shore of the island; on February 26, 1883, Mr. Franklin Bartlett and Mr. Clifford Bartlett, on behalf of Ms. Post, notified the court a change of route would be demanded.[31]Шаблон:Efn

Файл:"Proposed Staten Island Rapid Transit Route"- "Existing Ferry Routes are indicated by blue lines" 1884.jpg
Proposed Staten Island Transit route map. "Existing Ferry Routes are indicated by blue lines." Issued c. 1884 by E.C. Bridgman, NY, Map Publisher.

On April 3, 1883, the SIRTR gained control of the SIRW and its boats. On the same date, at the annual meeting of the SIRW, Erasmus Wiman gained control of the railway by being elected to the board of Directors of the Railroad and becoming the railway's president.[5]Шаблон:Rp At the meeting, Wiman laid out his proposals for rail lines on Staten Island.[18]Шаблон:Rp He proposed extending the Staten Island Railway line to Hyatt Street in what is today Saint George. From there, a line would run through New Brighton and Snug Harbor along the island's North Shore. The line would then go inland, running parallel to the Kill Van Kull. Additional spur lines would have been built in the interior of the island based on where people settled.[32] Wiman also proposed a bridge across Arthur Kill from Tottenville to Perth Amboy, replacing the ferry that operated there. This would have been part of a direct route between New York City and Philadelphia via Perth Amboy and South Amboy, with a new bridge over the Raritan River. In the days before the meeting, Wiman had gained 7,450 out of the 11,800 shareholders to elect him, surprising many of the directors of the railroad.[32] By the end of the month, Wiman resigned from the SIRTR to avoid any conflict of interest. On June 27, 1883, a meeting of the directors of the SIRW and the SIRTR formally ratified the merger of the two companies under the leadership of Erastus Wiman, who was named president.[5]Шаблон:Rp On June 30, 1883, the SIRTR leased the SIRW for a term of 99 years, to become effective when the line opened between Clifton and Tompkinsville.[1]Шаблон:Rp[25]Шаблон:Rp The line between Vanderbilt's Landing and Tottenville continued to be operated by the SIRW.[1]Шаблон:Rp

While the control of the railroad included control of Vanderbilt's ferry, the North Shore Ferry was leased separately and was operated by Starin, whose lease was set to expire on May 1, 1884. On July 18, 1884, the SIRTR outbid Starin for the North Shore operation. As part of the purchase, ferry service would have been operated every forty minutes instead of every hour. The fare for the railroad and the ferry would have been ten cents, except between five and seven in the morning and evening, when it would have been seven cents. Starin continued to fight the lease in the courts for several years.[5]Шаблон:Rp[33]

On May 5, 1885, the Perth Amboy Railroad was incorporated in New York to build a Шаблон:Convert-long line connecting the SIRW in Tottenville to Perth Amboy in New Jersey by bridging over the Arthur Kill. The railroad was incorporated with a capital stock of $1 million.[34] This railroad line was never built,[35] and was possibly in interest of the Pennsylvania Railroad. The Perth Amboy Railroad was to be an alternate freight route to avoid congestion at Harsimus Cove and through Elizabeth.[36]Шаблон:Rp

Expansion: 1884–1900

A controlling interest in the SIRTR was obtained by the B&O in November 1885 through purchases of stock. On November 21, 1885, Robert Garrett, President of the B&O,[37] leased the SIRTR to the B&O for 99 years, which gave the B&O access to New York, allowing it to compete with the Pennsylvania Railroad (PRR).[4]Шаблон:Rp[5]Шаблон:Rp[18]Шаблон:Rp Wiman needed the proceeds of the sale to pay for the construction of the North Shore Branch. The funds also helped pay for the construction of a bridge over the Kill Van Kull, the acquisition of Шаблон:Convert of waterfront property, and for terminal facilities at St. George.[38][39] In 1885, Jacob Vanderbilt retired as President of the SIRW. The new lines opened by the B&O were operated by the SIRTR, while the original line from Clifton to Tottenville was called the SIRW,[40][41] which was maintained as a separate corporation.[16][42]Шаблон:Rp The passenger cars used by the SIRW were leased by the SIRTR.[43]Шаблон:Rp

Construction of the North Shore Branch began on March 17, 1884, after a number of legal proceedings; a party of surveyors started marking out the grades and broke ground for the roadbed.[5]Шаблон:Rp[30][44] The rights of a horse car line to operate in Richmond Terrace were bought to build the line; the right of way followed the island's North Shore and reached a ferry to Elizabeth, New Jersey that had been operating since the mid-1700s.[45] The B&O built about Шаблон:Convert of rock fill out from shore and along the Kill Van Kull to deal with opposition from property owners in the neighborhood of Sailors' Snug Harbor, costing an additional $25,000.[4]Шаблон:Rp[7]Шаблон:Rp The company underwent a contest in litigation to acquire property for the line to pass over the cove at Palmer's run.[7]Шаблон:Rp Some properties in Port Richmond were acquired, displacing several home and business owners. A farm on the northwestern corner of Staten Island at Old Place—which was renamed Arlington by the B&O—was also purchased.[45]

Grading work on the section between Clifton (previously Vanderbilt's Landing) and Tompkinsville began at this time, and during early 1884, construction continued with such energy that this section, which had been expected to open on September 1,[30] opened on July 31 that year.[4]Шаблон:Rp[7]Шаблон:Rp The first train on the section contained the managers and officers, a few invited guests, and several passengers who had boarded prior to the train's arrival at Tompkinsville. The ride took three and a half minutes.[7]Шаблон:Rp The extension opened for passenger service on August 1, 1884.[30][46] The opening of the line made the SIRTR's 99-year lease of the SIRW effective; under this agreement, the railroad to Tottenville and its properties became part of the rapid transit system.[7]Шаблон:Rp[1]Шаблон:Rp

Wiman wanted to extend the line to St. George so all of the branches under the company's control could meet in one place and connect with the ferries to Manhattan. Most of the course of the line, however, had followed the shore along the bluffs, where ground had to be made upon to build the road. State laws could not grant the right to run a railroad through the property of the United States, hindering construction by the grounds of the lighthouse department near Tompkinsville. The company secured an Act of Congress permitting them to tunnel through a hill a near the shore. The grant for the tunnel was surrounded with restrictions that slowed progress. Construction of the tunnel began in 1885;[4]Шаблон:Rp it was Шаблон:Convert long, and was protected by massive masonry walls on the sides and a brick-built arch Шаблон:Convert in thickness overhead. The tunnel was wide enough to fit two trains side by side at a time. The cost of the project was $190,000.[7]Шаблон:Rp On November 16, 1884, Wiman, James M. Davis, Sir Roderick Cameron, Herman Clark, and Louis de Jonge incorporated the Saint George Improvement Company to handle the land and waterfront, which had been recently purchased from the estate of George Law. The new company was to handle the building of a new ferry terminal at Saint George.[5]Шаблон:Rp[47]

Opening of the North Shore and South Beach Branches

Файл:November 3, 1887 Staten Island Rapid Transit Railroad Timetable.png
November 3, 1887 Staten Island Rapid Transit Railroad Timetable

On January 16, 1886, constructing engineers for the SIRTR said that if weather continued to be good, trains on the East Shore Branch from Clifton and North Shore Branch trains from Elm Park would be able to run to St. George Terminal by February 1.[48]

The North Shore Branch was completed in 1885 and opened for service on February 23, 1886, with trains terminating at Elm Park. Travel times between Manhattan and Elm Park were reduced from 90 minutes with the old ferry system to 39 minutes.[7]Шаблон:Rp On March 7, 1886, the key piece of Wiman's plan, the St. George Terminal, opened; North Shore trains operated between Elm Park and St. George, and East Shore trains operated between St. George and Tottenville.[18]Шаблон:Rp In early 1886, in anticipation of the opening of the terminal and the consolidation of operations, the former Staten Island Railway stations from Clifton to Tottenville were upgraded from low-level platforms to high-level platforms to match the platforms on the new lines.[16] In mid-1886, the North Shore Branch opened its new terminal at Erastina.[6]Шаблон:Rp In 1889–1890, a station was built at the South Avenue grade crossing at Arlington as the tracks were extended to the Arthur Kill Bridge.[49] At Arlington, trains were reversed for their trip back to St. George.[16] Even a few years after its opening, most trains terminated at Erastina.[50]

A Шаблон:Convert-long branch, then known as the Arrochar Branch, was opened to Arrochar on January 1, 1888, as a double-tracked line.[51][52]Шаблон:Rp The branch split off at Clifton Junction; it had two stops—Fort Wadsworth and Arrochar. In its first year, the branch carried heavy traffic, especially during the summer months.[52]Шаблон:Rp As evidenced by a map from 1884, the South Beach Branch was originally intended to run to Prominard Street in Oakwood Beach.[22][53][54] The extension, however, was not built because the SIRTR could not gain the Vanderbilt family's approval to cross their New Dorp Beach farm.[16] Instead, the line was only built as far as South Beach. During fiscal year 1893, the SIRTR purchased land to extend the line Шаблон:Convert to South Beach and the Шаблон:Convert South Beach Branch was completed in 1894.[1]Шаблон:Rp

Improvements on the line to Tottenville

In 1886, Grasmere station opened on the Tottenville Line for a cost of $555.35.[55]

To improve service, under B&O control, a large portion of the line was double-tracked. A second track was built between New Dorp and a point near Clifton in 1887 and 1888.[52]Шаблон:Rp[56] Two new stations, Garretson and New Dorp, were opened the following year.[1]Шаблон:Rp In 1893, to pay for more improvements—including double-tracking and a new station at Tottenville—the SIRW issued a mortgage.[56] In 1895, land in St. George and Stapleton was acquired for yard space and station use.[57][58]Шаблон:Rp Between June 1895 and December 1895, the line was double tracked to Annadale. Between 1896 and 1899, the portion of the Шаблон:Convert line that was double tracked was increased from Шаблон:Convert to Шаблон:Convert.[42]Шаблон:Rp[58]Шаблон:Rp

In 1896, the terminal at Tottenville was moved Шаблон:Convert to provide closer connections to the Perth Amboy Ferry and to provide new ferry slips.[59] The terminal had been located on the east side of Main Street but as part of the work it was moved to Bentley Street. The change had a negative effect on local businesses, changing the character of Main Street and marking a decline of its commercial viability.[60] To build the new terminal, property had to be acquired.[1]Шаблон:Rp[61]Шаблон:Rp In 1910, the SIRW stopped using the land for the old ferry docks at Main Street.[43]Шаблон:Rp

Extension to New Jersey

Файл:Baltimore & Ohio Viaduct Under Construction Over the Arthur Kill Connecting Staten Island and New Jersey.png
Baltimore & Ohio Viaduct Under Construction Over the Arthur Kill Connecting Staten Island and New Jersey

The B&O made various proposals for a railroad between Staten Island and New Jersey. The accepted plan consisted of a Шаблон:Convert-long section from the Arthur Kill to meet the Jersey Central at Cranford, through Roselle Park and Linden in Union County. In October 1888, the B&O created the subsidiary Baltimore and New York Railway (B&NY) to build the line, which was to be operated by the SIRTR. Construction started in 1889 and the line was finished later that year.[4]Шаблон:Rp[45] After three years of effort by Wiman, Congress passed a law on June 16, 1886, authorizing the construction of a Шаблон:Convert swing bridge over the Arthur Kill.[18][62] The start of construction was delayed for nine months because it awaited approval of the Secretary of War,[4]Шаблон:Rp and another six months due to an injunction from the State of New Jersey. Construction had to continue through the brutal winter of 1888 because Congress had set a completion deadline of June 16, 1888; two years after signing the bill.[18]Шаблон:Rp[62] The bridge was completed three days early on June 13, 1888.[62][63]

Файл:A Map of the Staten Island Rapid Transit Company from 1885.png
A Map of the Staten Island Rapid Transit Company from 1885

When it opened, the Arthur Kill Bridge was the largest drawbridge ever constructed; it cost $450,000 and was constructed without fatalities. The bridge consisted of five pieces of masonry, the center one being midstream with the draw resting on it. The bridge's drawspan was Шаблон:Convert, the fixed spans were Шаблон:Convert, and there were clear waterways of Шаблон:Convert on either side of the draw, making the bridge Шаблон:Convert wide. The bridge was Шаблон:Convert above the low water mark. Construction of the draw needed 656 tons of iron, and 85 tons were needed for each of the approaches. Trains were planned to start running on the bridge by September 1,[62] but because the approaches were not finished, this was delayed until January 1, 1890,[4]Шаблон:Rp when the first train from St. George to Cranford Junction crossed the bridge.[64] Because the land for the approaches was low and swampy, Шаблон:Convert of elevated structure was built; Шаблон:Convert on Staten Island and Шаблон:Convert in New Jersey.[64] The North Shore Branch was opened to freight traffic on March 1, 1890.[1]Шаблон:Rp On July 1, 1890, all of the B&O's freight traffic started using the line.[65] Freight service began running through from Baltimore to St. George, running via the Reading Railroad and the Central Railroad of New Jersey between Park Junction in Philadelphia and Cranford Junction in New Jersey.[66]

The B&O paid the SIRTR 10 cents-per-ton trackage to use the line from Arthur Kill to St. George.[42]Шаблон:Rp Once the Arthur Kill Bridge was completed, pressure was brought upon the United States War Department by the Lehigh Valley Railroad and the PRR to have the newly built bridge torn down and replaced with a bridge with a different design, claiming it was an obstruction for the navigation of coal barges past Holland Hook on the Arthur Kill. Their efforts were not successful.[18]Шаблон:Rp[45]

In September 1890, Wiman secured the rights for a tunnel between Brooklyn and Staten Island; these tunnel rights were acquired by the New Jersey and Staten Island Junction Railroad Company. In May 1900, the PRR and other railroads secured an informal agreement to use the North Shore Branch from the Arthur Kill Bridge and the tunnel rights for a tunnel to 39th Street in Brooklyn. This was intended to allow freight trains to travel directly between Boston and Washington.[67]

Reorganization

The B&O was bankrupt by February 1896; in its attempt to reach the New York market, its western lines fell into disrepair. J.P. Morgan replaced the railroad's top management and refinanced it.[45] The new terminal at St. George was completed in 1896 after work was contracted for the project in fiscal year 1893.[68]Шаблон:Rp The building was designed by the architects Carrere and Hastings, and was built with ironwork framing. At the time, it was the largest terminal in the United States to have ferry, rail, vehicular, pedestrian and trolley services. Trolley companies on Staten Island insisted on access to the new terminal, but were rebuffed by the B&O. The issue went to court, and the B&O ended up splitting the cost for the trolley terminal and the long viaduct with the trolley operators.[69] Prior to October 1897 passengers placed their tickets into ticket choppers at stations to pay their fare. Afterwards, conductors collected tickets.[70]

In 1895, trolley service was inaugurated on Staten Island; it attracted passengers from the SIRTR, ending the railroad's monopoly. As a result, the railroad went into bankruptcy.[6] On April 20, 1899, the railroad company and all of the real and personal property held in the company was sold at auction for $2,000,000 to representatives of the B&O.[13]Шаблон:Rp[71] The railroad already owned the line from Elizabethport, New Jersey to South Beach, including the Arthur Kill Bridge. At the time, it was rumored the B&O trains would be rerouted from Communipaw station to Saint George. There was no change in the SIRTRC's management after the purchase.[71] On July 1, 1899, the SIRTR defaulted on its payment of interest on its second mortgage bonds, and its lease of the Staten Island Railway ended on July 14 when it was put into receivership.[72]Шаблон:Rp On July 31, 1899, the Staten Island Rapid Transit Railway Company—also shortened to Staten Island Rapid Transit, or SIRT–was incorporated for the purpose of operating the SIRTR, with the transaction taking place on August 1, 1899.[73]Шаблон:Rp The section of the SIRT's line between St. George and Clifton Junction was jointly operated with the SIRW.[1]Шаблон:Rp

Modernization: 1900–1949

Pennsylvania Railroad control: 1900–1913

Pennsylvania acquisition

Improvements were made to the SIRT after the Pennsylvania Railroad (PRR) under the leadership of president Alexander Cassatt took control of the B&O. Cassatt was named president of the PRR in 1899, and he allied with the New York Central Railroad for a "community of interest" plan. Cassatt wanted to end the rebate practice being undertaken by Standard Oil and Carnegie Steel—both larger shippers—that kept the freight rates extremely low. To achieve this, the two railroads bought stock in smaller, weaker trunk line railroads. The New York Central bought stock in the Reading Company, while the PRR bought stock in the Chesapeake and Ohio Railway, the Norfolk Southern Railway, and in the B&O—including the SIRT and the ferries on Staten Island. The plan worked; the average freight rate for the two companies rose. Cassatt first purchased B&O stock in 1899, most of it being under PRR control by 1901. After the PRR took more direct control of the B&O, including the SIRT; in May 1901, improvements were made to the rail line. PRR control of the line decreased as a new PRR president had different priorities, and in 1906, the PRR sold half of its B&O stock to the Union Pacific Railroad. The remainder of the PRR's stock in the B&O was sold to the Union Pacific in 1913.[74]Шаблон:Rp

Improvements

Under PRR control, the B&O was profitable again and became a stronger railroad.[45] The PRR allowed the B&O's newly developed properties to remain intact. On October 13, 1902, the SIRT started a trial passenger service from Plainfield station in New Jersey to St. George, running via the Jersey Central past Cranford Junction. The SIRT operated four trains every day, except for Sunday, with direct connections with the B&O's Royal Blue service between New York City and Washington, D.C. at Plainfield. These trains consisted of a locomotive and two passenger coaches. While this service was in operation the B&O sold tickets for its main line trains at the railroad's ferry terminals in Brooklyn, at South Ferry, and at St. George. Four passengers alighted at Plainfield on the first trip.[75][76][77] On November 3, 1902, it was announced that a complete schedule would be arranged to Plainfield, to take effect on November 22, 1902.[78] The service was discontinued in 1903 because it was unprofitable.[79][80] The PRR bought four large double-decker steamers to halve the travel time on the Staten Island Ferry. Even though the PRR improved ferry service, the B&O was ejected from the Whitehall Street terminal on October 25, 1905, when the city took ownership of the ferry and terminals. The city built a new St. George Terminal for $2,318,720.[81]Шаблон:Rp

In September 1906, the Jersey Central purchased Шаблон:Convert of property on the north side of its track between Plainfield and Cranford to enable to construct a fifth track to accommodate B&O freight trains to Staten Island, of which several traveled westbound from Cranford Junction between 6 p.m. and 8 p.m.. The track was intended to allow freight traffic, which often had to wait at Cranford Junction for multiple hours to make way for local passenger trains that were using the freight track to stay out of the way of express trains, to keep moving.[82]

The PRR increased the number of daily trips to 28, and in 1902, it began contemplating the electrification of the rail line. The PRR's investment in the southern portion of the Perth Amboy sub-division was credited for the increased development of the South Shore of Staten Island. As such, in about 1902, a new station was constructed at Whitlock to serve a new community being built by the Whitlock Realty Company on the South Shore. The development company incentivized prospective buyers to bid on newly built houses by promising a year's free commuting between Manhattan and Whitlock for the first 25 houses.[83] In December 1912, the SIRT petitioned the Public Service Commission (PSC) to allow the railway to abandon the station and replace it with a station named Bay Terrace Шаблон:Convert to the south. The change was made, anticipating a shift in the center of population in the community. A hearing to hear the application was held by the PSC on December 18.[20][84][85]

On February 21, 1907, the Staten Island Railway petitioned the Public Service Commission (PSC) to get permission to move the Dongan Hills stop from its location south of Seaview Avenue to a location Шаблон:Convert to the north in between Seaview Avenue and Garretson Avenue. On March 12, 1907, the PSC granted its permission.[86]

In September 1909, the New York State Public Service Commission (PSC) allowed the B&O to acquire 227 shares of the Staten Island Railway's capital stock, giving the B&O all of the railway's stock except for the few shares that had to be held by officers.[87] Practically all of the Staten Island Railway's stock had been purchased by the B&O by 1906.[66]

After 1900, several new houses were built in the community of Annadale and several parts of the Little Farms development. In 1910, as part of the development, the building company built a new railroad station.[88] As a result, on March 22, 1910, the SIRT petitioned the PSC to allow it to discontinue its service at Annadale station and replace it with a new station of the same name Шаблон:Convert to the west.[89][18]Шаблон:Rp On November 18, 1910, trains started stopping at a new station at Annadale that was built by the Wood Harmon Company the previous summer, which was located on the eastbound side of the track. This station replaced the station on the westbound track. As part of the construction of the new station, the operation of the switches where the line narrowed from two tracks to one began to be done from the station instead of being done manually.[90] In addition, in 1910, a new freight house went into operation at Clifton, and new Шаблон:Convert rails were installed as far south as Richmond Valley on the Perth Amboy Division. These new rails, which were Шаблон:Convert heavier than the rails already in place on the southern section of the Perth Amboy Division, were expected to reduce the jarring of cars.[91]

The PSC held a public hearing on December 16, 1910, to consider a proposal to eliminate grade crossings at Crook's crossing on Amboy Avenue in Great Kills, Clove Avenue in Grasmere, and Amboy Avenue in Huguenot. Commissioner of Public Work L.L. Tribus and Borough President Cromwell had started the push to eliminate grade crossings in Staten Island, which was approved by officials of the Staten Island Railway. The Board of Estimate had approved an appropriation to create a tentative plan. In the previous session of the State Legislature, a bill was passed allocating $250,000 for the state's portion of a fund to eliminate grade crossings in New York City, of which $200,000 was for Queens and $50,000 was for Staten Island. As such, $100 million would be available for the elimination of grade crossings in the two boroughs. At the time, there were 89 grade crossings on Staten Island, of which 14 were protected by sign boards, 44 by bells, 14 by flagmen, and 17 by gates. 100 people were injured and 56 people were killed in accidents at grade crossings from 1907 to 1910.[92]

On March 6, 1911, work began on the elimination of a grade crossing at Amboy Avenue in Huguenot, which the PSC had ordered to be eliminated, as it was considered the most dangerous crossing on the island. Work was to be done quickly with the intent of completing the project by the end of summer. As part of the project, Amboy Avenue would be depressed by Шаблон:Convert, and the tracks would be raised to provide Шаблон:Convert of clearance. The crossing was to be Шаблон:Convert wide with sidewalks, and the structure over the road was to consist of steel on concrete abutments. The project was estimated to cost $78,240, with $19,560 in funding coming from the state. The PSC had also ordered the elimination of a grade crossing at Great Kills with Crooke's crossing; work on the project was expected to begin shortly.[93][94]

On March 24, 1911, an automatic block signal system manufactured by the Hall Signal Company was put into use between Pleasant Plains and Tottenville, eliminating the need for a telegraph block signal office at Atlantic station.[95] The new signaling system reduced the work required for telegraph operators on the line to report when trains moved in and out of signal blocks.[96] This system had already been in use on the North Shore Branch from St. George to Arlington, and the South Beach Branch from St. George to South Beach for some time.[97]

In July 1911, the Public Service Commission (PSC) ordered the SIRT to install gates at several grade crossings on the North Shore Division to increase safety and reduce the frequent occurrence of accidents. This followed a PSC order to have flagmen staff the grade crossing at Amboy Avenue in Huguenot and Crooke's crossing in Great Kills at all times. Bids on projects to eliminate these crossings had been advertised earlier, but no work had yet started on them. There were 42 public grate crossings on the SIRT, and 43 on the SIR, in addition to 34 on private property.[98] The PSC sent inspectors to investigate every crossing in the city with considerable traffic with the goal of eliminating all grade crossings in September 1911. The PSC's goal was to either have the SIRT eliminate all grade crossings or have them install gates at dangerous crossings. Plans for the elimination of the crossings in Huguenot and Great Kills were prepared, and work was expected to begin shortly.[99]

In November 1911, the Public Service Commission gave notice for a hearing on November 23 to consider whether the Staten Island Railway Company and the Staten Island Rapid Transit Railway Company should electrify their lines, and whether any additional terminal facilities, tracks and switches were needed. This issue came up as a result of a complaint made by Reverend Father Charles A. Cassidy about noise from the switching of cars and steam locomotives in the St. George freight yards.[100] In December 1911, the PSC ordered that the Staten Island Railway Company and the Staten Island Rapid Transit Railway Company consider electrifying their lines. A public hearing for this matter was set for January 15, 1912.[101]

On December 12, 1911, following a series of hearings held between October 30 and December 4, the PSC ruled that grade crossings on Staten Island had to be protected. The hearings had been held following a petition made by residents of Prince Bay and Pleasant Plains after two boys were seriously injured when a train struck a stagecoach they were riding at the Sharrot Avenue crossing in Pleasant Plains. The PSC ordered that, as of March 15, 1912, gates had to be placed at Centre Street in Clifton, Sea View Avenue and Garretson Avenue in Dongan Hills, at Rose Avenue in New Dorp, at Giffords Lane in Great Kills, at Huguenot Avenue in Huguenot, at Prince Bay Avenue in Prince Bay, and at Amboy Road in Pleasant Plains on the Perth Amboy Division. In addition, the SIRT and SIR were required to have signal bells placed at Fisher Avenue in Tottenville, at Old Mill Road in Richmond Valley, Annadale Road in Annadale, and Ocean Avenue in New Dorp on the Perth Amboy Division, and have a flagman placed at each of these crossings from 7 a.m. to 7 p.m.. A flagman also had to be in place at the crossing at Main Street in Tottenville at all times. The PSC also ordered that, as of January 15, 1912, gates had to be installed at Newark Avenue and Douglas Avenue in Elm Park, and at Central Avenue in Mariners' Harbor on the North Shore Division, and at Tompkins Avenue in Fort Wadsworth, St. Mary's Avenue, Clifton Avenue, and Pennsylvania Avenue in Rosebank, Maple Avenue in Clifton, and Wave Avenue and Prospect Street in Stapleton on the South Beach Division. In addition, signal bells had to be installed at Chestnut Avenue in Clifton on the South Beach Division, and Granite Avenue in Elm Park on the North Shore Division.[102]

In May 1912, work began on the installation of the new signaling system between Clifton Junction and Pleasant Plains. In order to allow for the installation of the new signaling, the experimental Lacroix automatic signaling system, which had been installed between Dongan Hills and Grasmere, would be removed.[103]

In August 1912, the New York City Board of Estimate provided notice that it would hold a hearing on September 19 on the Staten Island Railway Company's application to add an additional track between Amboy Road in Pleasant Plains and Huguenot Avenue in Huguenot.[104] In October 1912, work installing the new signaling system on the Perth Amboy Division was complete, with the exception of the single-track segment between Annadale and Pleasant Plains, which had a switch at Huguenot.[104] The remaining section was scheduled to receive the new signaling once the completion of the grade-crossing elimination project in Huguenot and the completion of a second track between Annadale and Pleasant Plains.[96] In October 1912, the Board of Estimate held a hearing on the Staten Island Railway Company's application to double-track its line from Pleasant Plains to Huguenot. A hearing had previously been held on the company's application for Amboy Avenue in Huguenot by itself. Work on that grade separation project was being completed rapidly, with the concrete abutments for the railroad bridge being almost completed and large steel girders being ready to be put into place. Work to grade the right-of-way for the second track was extended from the Amboy Avenue grade crossing in Huguenot past Prince Bay station. Work to lay the second track was expected to begin following the passing of the application by the Board of Estimate. With the completion of the double-tracking, trains would no longer have to wait at sidings at Annadale and Pleasant Plains for trains in the opposite direction to proceed.[105]

In November 1912, the Board of Estimate issued a notice for the final hearing on SIRT's application to double-track the Annadale to Pleasant Plains section, which would take place on December 5. No one had spoken in opposition to the plan at the October hearing. The contract between New York City and the Staten Island Railway Company would have the company pay the city $500 three months after the Mayor signed the contract, with a sum of $100 for each crossing the second track would pass over or an annual amount of $800 from the date of the contract's signing until October 28, 1934. The crossings that would be crossed were Woodvail Avenue, Sharrott Avenue and Amboy Avenue in Pleasant Plains, Bay View Avenue and Manee Avenue in Prince Bay, and Huguenot Avenue and Amboy Avenue in Huguenot. Work on the elimination of the grade crossing at Amboy Avenue was in progress, and new girders were being put into place. Work to grade the second track was completed as far south as Prince Bay station.[106] On December 17, 1912, the State Supreme Court in Brooklyn received an application for the appointment of a commission to assess and appraise the properties needed for the widening of Amboy Road, which would be part of the project to abolish the grade crossing there. It was expected that the road would open around January 1, 1913.[107]

On December 26, 1912, the City of New York granted the SIRT the right to construct a second track between Huguenot and Pleasant Plains, with completion expected in three years. The grant was for 25 years but this project was not completed until 1934.[1]Шаблон:Rp[108]

On March 25, 1913, work began on the double tracking of the Perth Amboy Division between Huguenot and Annadale. Work was expected to be done to complete the second track from Prince Bay to Pleasant Plains shortly afterwards. The automatic block signal system would be extended over the new second track. At the same time, work began on eliminating Crookes crossing in Great Kills.[109] Crookes crossing, which was located between Oakwood and Great Kills station, crossed the train tracks on a diagonal with a descending grade from both sides. This was considered the deadliest crossing on Staten Island, especially as car traffic became heavier on Amboy Road. The work to eliminate the crossing would consist of the raising of the grade of Amboy Road above the rail line. Work was expected to be completed before the middle of the summer in 1913.[110]

Work on the grade crossing project at Amboy Avenue was completed by May 1913 at the cost of $100,000.[94] Amboy Avenue now passed under the rail line at this point. This was the first grade crossing eliminated on the SIRT.[111] Some time earlier, at a PSC hearing, it was recommended that the SIRT consider eliminating eleven additional grade crossings, with those on the Amboy Division being at Washington Avenue in Annadale, at Liberty Avenue in Dongan Hills, and at Clove Avenue in Grasmere.[110]

On June 18, 1913, trains began running over the new double track between Annadale and Prince Bay, leaving the section between Prince Bay and Pleasant Plains as the only single-track section on the Perth Amboy Division. The new double track section, which was about Шаблон:Convert long, reduced train delays, and allowed for the transferring of three shifts of telegraph operators from Annadale to the new tower at Prince Bay, which controlled the switches at the boundary of double track territory. Another tower was planned to be installed at Pleasant Plains as part of a series of improvements at that station. The passenger station would be moved to the existing freight station, and a new freight station would be constructed on the opposite side of the track.[112] As part of the project, grades were adjusted, and the roadbed was well ballasted and had heavy rail tracks installed, improving its condition to the higher standard that was maintained on the rest of the line.[113] In July 1913, a group of Annadale residents appealed to the PSC for the restoration of the telegraph station at Annadale.[114]

On August 7, 1913, work began on the construction of a new two-story switch tower was being installed at the former site of the station at Amboy Avenue.[115] The tower would automatically control the interlocking being installed between Pleasant Plains and Princes Bay, and was to be similar to the one that had been installed at Princs Bay. In September 1913, work was nearly completed on improvements at the Pleasant Plains station, and the tower was on track to be completed in October. The Pleasant Plains station house was completely renovated, and received electric lights on the platform and in the station house.[116] The new station opened on October 8, 1913, and the tower was completed shortly afterwards.[93] On December 18, 1913, trains started using the new elevated structure over Crooks crossing, eliminating another grade crossing.[111]

During fiscal year 1915, a second track was completed between Annadale and Pleasant Plains, and grade crossings elimination projects were undertaken at Amboy Road, Huguenot Park, and Pleasant Plains.[43]Шаблон:Rp On January 19, 1917, the Board of Estimate gave notice that they would hold a public hearing on January 26 to heart the application of the Staten Island Railway Company to abandon its right to double track its line between Pleasant Plains and Prince Bay. When the grade crossings at Huguenot and Great Kills were eliminated, the PSC had notified the SIRC that it should also eliminate the five grade crossings between Pleasant Plains and Prince Bay, and gave the company three years to do so, which did not happen. They had granted the company an extension of one year to complete the work, but that expired on December 26, 1916.[117] The SIRC said that it had applied for permission to abandon its right to complete the second track as its operation did not require the double tracking of this section, and as it wanted to avoid the expense of eliminating the grade crossings and of double tracking until it was needed.[118]

In August 1917, the PSC adopted an order directing the SIRT and other railways to keep the gates at 33 grade crossings closed between midnight and 5 a.m. for vehicle safety.[119] The New York State Transit Commission, on August 15, 1919, ordered the SIRT to eliminate the grade crossing at Virginia Avenue by lowering that street under the existing rail line, with a clearance of Шаблон:Convert. However, due to World War I and issues with nearby grade crossing elimination projects, this work was delayed.[120]Шаблон:Rp

On April 13, 1922, the SIRT petitioned to the PSC to move Bay Terrace station Шаблон:Convert to the east of the station to Lincoln Road and to renamed the station Rice Manor. The PSC denied the application as the move would allow fewer people to use the station. There were 35 homes immediately surrounding the existing station while there were only 3 at the proposed location. The move was intended to spur development in the surrounding area.[121]

Increase in traffic

Шаблон:Rail freightIn 1890 and 1906, respectively, the car float terminal and freight yard at Saint George and Arlington Yard were opened.[22] The two main freight yards on Staten Island, Arlington and Saint George, were at capacity, and in 1912, to ease the congestion, the B&O began running freight via the Jersey Central into Jersey City. The B&O profited from the heavy coal trade that operated via the lines on Staten Island.[45] In 1920, 4,000,000 tons of freight had been handled on the railway. In addition, passenger traffic on the line increased. Between 1903 and 1920, daily trips on the North Shore Branch increased from 50 to 65; from 50 to 60 on the South Beach Branch; and from 22 to 34 on the Tottenville Branch.[122] In 1920, 65 trains ran daily on the North Shore Branch; 60 trains ran daily on the South Beach Branch; and 34 trains ran daily on the Tottenville Branch. Most of the railway's passengers used the North Shore and South Beach branches. In 1920, 8,000,000 passengers used the North Shore and South Beach branches while 5,000,000 passengers used the main line.[123] Up to 1921, 3,369,400 trains had been operated on the SIRT with no fatalities.[124]

Electrification: 1923–1925

Файл:Staten Island Rapid Transit, No. 21 (12240202523).jpg
A view of a steam locomotive that used to run on the SIRT prior to electrification.

On June 2, 1923, the Kaufman Act was signed by Governor Al Smith, mandating that all railroads in New York City–including the SIRT—be electrified by January 1, 1926.[125][126] As a result, the B&O drew up electrification plans, which were submitted to the PSC. The plans were approved by the PSC on May 1, 1924, and construction began on August 1, 1924. The SIRT was to be electrified using 600 volt D.C. third-rail power distribution so it would be compatible with the Brooklyn–Manhattan Transit (BMT) once a planned tunnel was completed under the Narrows to Brooklyn, connecting the line to the BMT Fourth Avenue Line of the New York City Subway system.[127] The B&O planned to use this tunnel to connect its freight from New Jersey to freight terminals in Brooklyn and Queens, including to a planned port at Jamaica Bay. The city started construction on the Narrows tunnel in 1924. Due to political pressure and the project's increasing cost, the freight tunnel portion of the plan was eliminated in 1925, and the entire project was halted in 1926. Only the shafts at either end were constructed.[18]Шаблон:Rp The SIRT ordered ninety electric motors and ten trailers (later converted to motors) from the Standard Steel Car Company to replace the old steam equipment.[18]Шаблон:Rp These cars, the ME-1s, were designed to be similar to the Standards in use by the BMT.[127]

The first electric train was operated on the South Beach Branch between South Beach and Fort Wadsworth on May 20, 1925, and regular electric operation began on the branch on June 5, 1925.[128]Шаблон:Rp As part of the electrification project, the South Beach Branch was extended one stop to Wentworth Avenue from the previous terminus at South Beach.[20][129] Wentworth Avenue had a short, wooden, half-car platform, and a shelter was built there. That location had previously been used as a servicing and turning point for the line's steam-powered locomotives.[16] Electric service began on the Perth Amboy sub-division on July 1, 1925, to much fanfare.[128]Шаблон:Rp[130] The North Shore Branch's electrification was completed on December 25, 1925, and resulted in a time savings of ten minutes from Arlington to St. George.[6][131] Following the electrification of all three branches, service was increased by nineteen trains on the Perth Amboy sub-division, by the fifteen trains on the South Beach Branch, and by five trains on the North Shore Branch.[132]

Because of the high cost of electrification, however, St. George and Arlington Yards, along with the Mount Loretto Spur, and the Travis Branch were not electrified.[4]Шаблон:Rp Thirteen steam engines were retired and four new, wholly automatic substations opened at South Beach, Old Town Road, Eltingville, and Tottenville. The SIRT's old semaphore signals were replaced by new color position light signals. This was the first permanent use of the type of signal on the B&O–it later became the railroad's standard.[18]Шаблон:Rp A modern signaling system was put into place in the Saint George Yards, allowing one dispatcher to do all the work. The Clifton Junction Shops were updated to maintain electric equipment rather than steam equipment, and a large portion of the yard was electrified. Grade crossing elimination began between Prince's Bay and Pleasant Plains.[126] While electrification was being installed, the system's roadbed was rebuilt with 100-pound rail.[133]

The promise of a faster, more reliable electrified service spurred developers and private individuals to purchase land alongside the SIRT lines, with the intention of providing housing to attract residents to Staten Island.[134] On July 2, 1925, for the first time since its opening, the railroad stopped reserving its trains' first car for smokers. A petition was sent to the railroad to reverse this decision.[135]

In the end of 1924, work began on a project to elevated the track to eliminate six grade crossings on the Perth Amboy Division between Pleasant Plains and Princess Bay and to add Шаблон:Convert of double-track to complete the double-tracking of the entire line. The cost of the project was shared by the SIR, New York State, and New York City. Work on this project was completed in 1926, and the State made the final payment on the project on August 15, 1927.[120]Шаблон:Rp Work on the $1,050,000 project was 85 percent complete at the start of 1926.[136] One June 23, 1926, the Transit Commission ordered the elimination of a grade crossing at Bay Street in Clifton through the elevation of the train tracks for $573,000, and the elimination of the Tompkins Avenue, Hope Avenue, and Belair Road crossings in Fort Wadsworth for $647,000. The order called for the closure of the Belair Road crossing and for the partial depression of the tracks and elevation of the streets to allow Tompkins Avenue and Hope Avenue to pass over the South Beach Branch. The SIRT sued to test the validity of these orders by the Transit Commission, but the orders were upheld by the New York State Court of Appeals. In 1927, the SIRT planned on appealing this decision to the Supreme Court of the United States. On November 24, 1926, the Transit Commission ordered the elimination of the Tompkins Avenue grade crossing in Clifton through the elevation of the street over the rail line. The estimated cost of this project was $281,000.[120]Шаблон:Rp

In 1927, work on the Virginia Avenue grade crossing elimination project was still not underway. The SIRT had requested that the Transit Commission's order be modified on October 22, 1926, but this request was denied. The Richmond Borough President, on June 1, 1927, requested a modification to the order to provide for a clearance of Шаблон:Convert instead of Шаблон:Convert.[120]Шаблон:Rp On July 12, 1937, the first hearings were held on the Port Richmond—Mariners Harbor Elimination project, which would eliminate 21 grade crossings on the North Shore Division for $4 million.[120]Шаблон:Rp

In 1926, the New York State Transit Commission ordered the installation of automatic signals at 18 grade crossings on the SIR for $47,000. These signals were in operation since the middle of September 1927.[120]Шаблон:Rp

Expansion

In the 1920s, a branch was built to haul materials to construct the Outerbridge Crossing. The branch ran along the West Shore from the Richmond Valley station, and originally ended at Allentown Lane in Charleston, past the end of Drumgoole Boulevard. The branch was cut back south of the bridge after the bridge was completed. The Gulf Oil Corporation opened a dock and tank farm along the Arthur Kill in 1928; to serve it, the Travis Branch was built south from Arlington Yard into the marshes of the island's western shore to Gulfport.[4]Шаблон:Rp[16] At this time, the B&O proposed to join the two branches along the West Shore. The West Shore Line, once completed, would have allowed trains to run between Arlington on the North Shore sub-division and Tottenville on the Perth Amboy sub-division. In addition, freight from the Perth Amboy sub-division would no longer be delayed by the congestion of Saint George Yard and the frequent passenger service of the SIRT. This proposal was canceled because of the Great Depression.[16]

Файл:Baltimore & Ohio Railroad Staten Island Map 1922 Showing Proposed West Shore Line.jpg
This map from 1922 shows the proposed connected West Shore Line.

In the 1930s, there was a proposal to build a loop joining the Perth Amboy sub-division at Grasmere with the North Shore Branch at Port Richmond. There also was a proposal to join the North Shore Branch to Tottenville without using the existing West Shore tracks.[16] Staten Island Borough President Joseph A. Palma, in 1936, proposed to extend Staten Island Rapid Transit to Manhattan (via New Jersey) across the Bayonne Bridge, which had been built to accommodate two train tracks.[137][138] The Port of New York Authority endorsed the second plan in 1937, with a terminal at 51st Street in Manhattan near Rockefeller Center to serve the trains of Erie, West Shore, Lackawanna, Jersey Central, and trains from Staten Island.[139] This original proposal would be brought back in 1950, by Edward Corsi, a Republican candidate for Mayor of New York City.[140]

In 1931, Cedar Avenue station opened with the construction of wooden platforms at the Cedar Avenue grade crossing on the South Beach Branch.[141]

On February 4, 1932, the headway on trains was decreased to 15 minutes from 20 minutes between 9:29 p.m. and 10:29 p.m.; and was decreased to 30 minutes from 40 minutes between 10:29 p.m. and 1:29 a.m. on the Perth Amboy Division.[142]

On June 14, 1948, a bill to permit the SIRT to widen its railroad tunnel at the Saint George Ferry Terminal was signed into law.[143] The tunnel, which was constructed under Federally owned land, was widened Шаблон:Convert for a distance of Шаблон:Convert.[144] The tunnel allowed for the laying of a third track, and permitted the operation of more trains from Saint George to Tottenville and South Beach. The extra track also facilitated better handling of trains at the ferry terminal at Saint George.[145]

Grade crossing elimination: 1926–1950

On June 25, 1926, the Transit Commission ordered the elimination of four grade crossings on Staten Island—at Bay Street in Clifton, and at Hope Avenue, Belair Road, and Tompkins Avenue in Fort Wadsworth. The project would cost $1,000,000, with half of the cost going to the railroad and a quarter each to the city and state. At the time, the grade crossing at Bay Street was thought of as the most dangerous grade crossing on Staten Island.[146] The SIRT sued the Transit Commission, arguing that it did not have the power to order the construction of such projects. The Court of Appeals ruled in favor of the Transit Commission on July 23, 1926. The case was carried to the Supreme Court, which decided to hear the case "for a lack of jurisdiction."[5]Шаблон:Rp

On November 27, 1929, the Transit Commission held hearings on proposals to eliminate eleven grade crossings in Dongan Hills and Grasmere at Old Town Road, Buell Avenue, Liberty Avenue, Sea View Avenue, Garretson Avenue, Cromwell Avenue, Tysen Avenue, Burgher Avenue, Clove Avenue, Parkinson Avenue and Grasmere Avenue.[147] On September 14, 1932, the Transit Commission approved plans for the elimination of these eleven grade crossings.[148]

The elimination of grade crossings continued in the 1930s in all three sub-divisions. On the Perth Amboy sub-division, a large grade-elimination project took place on the southern portion of the line. The project was completed in 1934; new brick stations were built and the single-track portion of the line that ran through Skunk's Misery was double-tracked; the latter requiring a lot of rock fill.[16]

The Grasmere–Dongan Hills grade crossing elimination project was completed in 1934. The project eliminated eleven crossings and cost $1,576,000. The crossings were removed by putting the line in an open cut through Grasmere and elevating it through Dongan Hills.[142]Шаблон:Rp As part of the project, a new street—North Railroad Avenue— was constructed, paralleling the line's north side from Clove Road to Parkinson Avenue.[149]Шаблон:Rp

The East Shore sub-division was elevated in 1936–1937 to remove several grade crossings.[129][150] A huge undertaking was required to remove grade crossings on the North Shore sub-division. The Port Richmond-Tower Hill viaduct was built to remove eight grade crossings; it was longer than a mile and became the largest grade crossing elimination project in the United States. The viaduct opened on February 25, 1937, marking the final part of a $6,000,000 grade crossing elimination project on Staten Island, which eliminated 34 grade crossings on the north and south shores. A two-car special train, which carried Federal, state, and borough officials, made a run over the viaduct and the seven-mile project. Stations closed for the viaduct project at Tower Hill and Port Richmond were reopened on this date.[151]

Файл:Eltingville si plaque jeh.JPG
This plaque at Eltingville commemorates the completion of the grade crossing elimination project between Great Kills and Huguenot.

Between 1938 and 1940, a grade crossing elimination project was undertaken over three miles between Great Kills and Huguenot, eliminating seven grade crossings and costing $2,136,000, which was partially paid for by the city, state, and Progress Work Administration funds.[152][153]Шаблон:Rp The line was depressed into an open cut between Great Kills and Huguenot, with the exception of a section through Eltingville where it was elevated.[154] Four stations—Great Kills, Eltingville, Annadale and Huguenot—were completely replaced with new stations along the rebuilt right-of-way. The project started on July 13, 1938, and was completed in October 1940.[155][156]Шаблон:Rp The stations themselves were completed in 1939, and therefore have the date 1939 inscribed either on road overpasses or on railroad bridges.[157]

In that same year, grade crossing eliminations were completed in Richmond Valley and Tottenville. The Richmond Valley project eliminated the crossing at Richmond Valley Road and cost $300,000 while the Tottenville project eliminated seven crossings—including one at Main Street—and cost $997,000.[158][159][160] The only remaining grade crossings to be removed were at Grant City, New Dorp, Oakwood Heights, and Bay Terrace. These projects were delayed due to material shortages during World War II.[161] In 1949, a project to eliminate 13 grade crossings on the Perth Amboy sub-division, at Grant City, New Dorp, Oakwood Heights and Bay Terrace, was set to begin, with a projected cost of $7,400,000.[162] On August 30, 1950, the PSC announced a $6,500,000 plan to eliminate grade crossings of the SIRT. The plan was only approved with the assurance from the city that if passenger service was discontinued, the city would guarantee residents of the area would have some form of public transportation. The plan also included the construction of a bridge over the never-built Willowbrook Expressway.[163]

World War II

Freight and World War II traffic helped pay off some of the debt the SIRT had accumulated, briefly making it profitable. B&O freight trains operated to Staten Island and Jersey City. Around this time, B&O crews began running through without changing at different junctions. Regular B&O crews and Staten Island crews were separated, meaning the crews had to change before they could enter Staten Island. All traffic to and from Cranford Junction in New Jersey was handled by the SIRT crews. During the war, all east coast military hospital trains were handled by the SIRT—the trains came onto Staten Island through Cranford Junction, with some trains stopping at Arlington to transfer wounded soldiers to Halloran Hospital. Freight tonnage doubled on the SIRT between 1942 and 1944 to a record 3.2 million tons. The Baltimore and New York Railway line become extremely busy, handling 742,000 troops, 100,000 prisoners-of-war, and war material operating over this stretch to reach their destinations.[18]Шаблон:Rp Two B&O subsidiaries, the B&NY and the SIRT, were merged on December 31, 1944.[164]Шаблон:Rp[165] Since the Baltimore and New York Railway opened in 1890, the SIRT operated this line with locomotives belonging to itself and to its parent company, the B&O. Around the time of World War II, the B&O operated special trains for important officials. One special was operated for former Prime Minister of the United Kingdom, Sir Winston Churchill. The train took him to Stapleton, from where he boarded a ship to Europe. The SIRT made special arrangements for the trip, including a shined-up locomotive sporting polished rods, white tires, and an engine crew clad in white uniforms.[45]

Fires

Файл:Ferry Terminal, St. George, Staten Island, N.Y. (buildings with trains and r.r. tracks) (NYPL b15279351-104684).tiff
A view of St. George Terminal before its destruction by a fire in 1946.

Tottenville station was destroyed by a fire on September 3, 1929. The fire was attributed to a short-circuited third rail. The two Шаблон:Convert-long platforms were destroyed, as were five train cars being stored near the station. The damage was estimated to cost $200,000. Passengers using the Perth Amboy Ferry were forced to use the nearby Atlantic station instead.[166]

On June 25, 1946, a fire wrecked the terminal at Saint George, killing three people and causing damage worth $22,000,000.[18]Шаблон:Rp The fire destroyed the ferry terminal and the four slips used for Manhattan service, the terminal for Staten Island Rapid Transit trains, and a small building and slip owned by the city and used by the Army and Navy to transport personnel from Staten Island to the United States Naval Depot at Bayonne, New Jersey.[167] Twenty rail cars were also destroyed in the fire.[168] Since the power circuits were melted, the electric MUs were trapped in the station. Diesel cars were sent to rescue them, but would not couple with the MUs due to their different coupling systems. Some cars were saved through the use of rigging tow chains, but precious minutes were lost. 5 cars were totally destroyed in the fire, while 16 suffered heavy damage. A few cars were sent to Clifton shops, with the others kept at St. George with their windows boarded up.[169]

Two days after the fire, the city voted $3,000,000 to start work on a new $12,000,000 terminal that would be opened in 1948.[170] Until a temporary terminal could be built at Saint George, Tompkinsville was used as the main terminal. Even though the station was very narrow and its facilities were inadequate, service continued without an issue and without any injuries. The station handled the equivalent of 128 passenger loads per day.[133]

On June 8, 1951, a modern replacement terminal for Saint George opened, although portions of the terminal were phased into service at earlier dates.[171]

Service scaledowns and the end of B&O operation: 1947–1971

Transfer of ferry service: 1947–1948

On October 28, 1947, the SIRT filed with the Interstate Commerce Commission (ICC) to get permission to discontinue ferry service between Tottenville and Perth Amboy Ferry Slip in Perth Amboy, New Jersey. The SIRT said the abandonment should be permitted because of "the substantial deficits being incurred in operation of the service, which covers a distance of 3,600 feet".[172] On September 22, 1948, the ICC allowed the SIRT to abandon the ferry, which it had been operating for 88 years. On October 16, the ferry operation was transferred to Sunrise Ferries of Elizabeth, New Jersey, which had agreed to lease the railway's ferry facilities at Tottenville and to lease Perth Amboy wharf and dock properties there.[173][174] The schedules and the five-cent fare for the ferry were maintained.[175] In 1963, Perth Amboy ferry service was discontinued.[176]

Service cuts and the discontinuation of service: 1948–1953

Файл:SIRT map.jpg
This map of the Staten Island Rapid Transit from 1952 shows the system at its greatest extent, and was published a year before service on the North Shore and South Beach branches was discontinued.

On October 28, 1947, Mayor John Delaney of Perth Amboy created a plan to fight the SIRT's proposal to abandon service between St. George and Tottenville. The Mayor criticized the railroad for failing to notify the city of its intentions.[177] This effort to discontinue service failed, but on July 1, 1948, the New York City Board of Transportation took over all of the bus lines on Staten Island.[4]Шаблон:Rp As a result, the bus fare on Staten Island dropped from five cents per zone (twenty cents Tottenville to the ferry) to seven cents for the whole island, to match the fare of the other city-owned bus lines. The cheaper bus fare resulted in an exodus of passengers from the SIRT. In 1947, the SIRT had carried 12.3 million passengers but after the decrease in bus fares the number decreased to 8.7 million in 1948 and to 4.4 million in 1949.[178] Three months after the change, passenger traffic dropped 32 percent on the Tottenville Division and 40 percent on the other two divisions. The buses saw a 25 percent increase in ridership.[179]

Due to the loss of ridership, on August 28, 1948, the SIRT announced it would reduce service on all three branches on September 5. Service would be reduced from 15-minute intervals in non-rush hours to 30 minutes during that time, and from 5 to 10 minutes in rush hours to 10 to 15 minutes during rush hours.[180] The day afterwards, Richmond Borough President Cornelius A. Hall and Staten Island civic organizations announced they would oppose the proposed cuts.[181] The PSC elected not to prevent the cut in service on September 2, 1948, and the cut went into effect three days later. 237 of the previous 492 weekday trains were cut and the schedule of expresses was reduced during rush hours. In addition, all night trains after 1:29 a.m. were eliminated. The reduction of trips resulted in the firing of 30 percent of the company's personnel.[182][183]

On September 7, 1948, Borough President Hall continued to oppose the SIRT's cuts at a PSC hearing in Manhattan. Commuters testified that trains were missing connections to ferry boats and that some trains were being held at the St. George Terminal during rush hour to wait for two boatloads of passengers. Previously, they said, the trains pulled out with only one boatload of passengers.[184] On September 13, 1948, the SIRT agreed to add four trains and to extend the schedule of four others.[185][186] On January 5, 1949, the PSC recommended the SIRT restore the service cut; if it refused, the PSC would order the SIRT to restore the service. Hall suggested lowering the fare to 10 cents or a 20-cent round trip to make the service more competitive with the buses on the island.[187] On January 29, 1949, the PSC ordered the SIRT to restore five trains and to reschedule seven other trains for public convenience, and gave the SIRT until February 13 to carry out the order.[188]

Файл:Citizens Mass Meeting in Protest Against Discontinuance of Passenger Service on North Shore and South Beach Rapid Transit Lines March 17, 1953.jpg
This poster called for people, and public officials, to rally against the scheduled discontinuation of service on the North Shore and South Beach Branches later in March 1953.

On May 20, 1949, the SIRT announced it intended to discontinue all of its passenger services and that it would seek permission from the PSC to do so, citing the loss of $1,061,716 in 1948. The PSC response was to rule that the railroad must continue its operations or substitute them with buses, otherwise the city should take over the railroad service as part of the municipal transit system.[189] The SIRT made another request to discontinue its passenger service on June 3, 1952, with a date set of July 7.[190] On June 16, the PSC ordered the SIRT to continue all of its passenger services pending a decision on the line's request to abandon its service.[191] On July 9, hearings concerning the proposed abandonment of the railroad began.[192] On July 16, the PSC counsel stated the operating deficits that had been charged to the SIRT's passenger service would disappear if they were included with the freight profits of the B&O in the New York area.[193] After the hearings, the SIRT changed its planned abandonment date to September 12, 1952. The commissioner council said a provision for an additional two months of service, extending it to November 12, 1952, needed to be made.[194]

On December 19, 1952, the PSC gave the SIRT permission to discontinue service on the North Shore Branch and South Beach Branch after March 31, 1953, because of city-operated bus competition. The discontinuation brought the SIRT an estimated annual saving of $308,000.[195] The South Beach Branch was abandoned shortly thereafter while the North Shore Branch continued to carry freight.[196][197] Bus service on parallel lines was increased to make up for the loss of service on these branches.[198] By 1955, the third rails on both of the lines were removed.[4]Шаблон:Rp

City steps in to subsidize Tottenville service: 1954–1971

While the SIRT had successfully discontinued service on the North Shore Branch and South Beach Branch, it was not successful in its endeavors to discontinue service to Tottenville.[199] On September 7, 1954, the SIRT made an application to discontinue all passenger service on the Tottenville sub-division on October 7, 1954.[200] The PSC warned that if it discontinued its passenger service, action would be taken to remove the SIRT's parent company, the B&O Railroad, from Staten Island, meaning the end of its prospering freight operation. A large city subsidy allowed passenger service on the Tottenville sub-division to continue. Since this sub-division did not need the trains cars left over from the closure of the North Shore and South Beach lines, the SIRT sold 35 of them, of which 5 were trailers, to the New York City Transit Authority (NYCTA) in 1953–1954 for $10,000 each.[6]Шаблон:Rp[18]Шаблон:Rp[201]

A bill allowing New York City to lease service on the Tottenville line was approved by Governor Harriman on March 20, 1956, paving the way for an agreement between the city and the B&O.[202] On December 13, 1956, the PSC approved an agreement between the B&O and New York City that ensured the Tottenville line would continue to operate; as part of the deal, New York City leased the line's passenger facilities for 20 years and received a small percentage of the line's net income. The SIRT continued to collect revenue and operate service. In addition, the city repaid all taxes owed by the railroad to the city.[203] The agreement went into effect on January 1, 1957.[204] The SIRT's financial troubles continued and in February 1960, it asked the city for $3,870,000 in subsidies, threatening to ask the PSC for permission to discontinue the service if the funds were not provided. In 1959, the SIRT lost $1,100,000, with an average daily ridership of 4,000.[205] On August 25, 1960, the Board of Estimate approved an amendment of the city's contract with the SIRT to increase the annual subsidy. Over the next ten years, the aid was increased from $4,000,000 to $8,400,000.[206]

On April 5, 1962, a fire at Clifton Yard destroyed seven ME-1 train cars and a warehouse, adding to 13 lost in two previous fires and two that were scrapped, leaving the SIRT with only 48 cars to operate regular service.[207][208] This car shortage meant 44 of its 48 train cars were in service during rush hours, leaving a small margin for errors. To maintain the previous level of service, the SIRT had carefully scheduled maintenance for their train cars; a number of trains were rushed back to Saint George as passenger-free expresses after dropping their loads in the evening rush, helping make up for the lack of train cars. The NYCTA set aside nine BMT Standards for possible transfer to the SIRT. The SIRT also looked at a proposal to transfer some D-type cars. Neither of the proposals were acted upon.[6]

On July 13, 1967, Mayor John Lindsay announced the city was considering purchasing the 48 air conditioned train cars used at Montreal's Expo 67 to transport passengers between the city and the exposition grounds. The cars would have cost $3,840,000, or about $80,000 each, and were expected to be available in October once the fair closed. These cars were 11.7 percent larger than the cars then in service on the SIRT.[209]

Freight operations: 1957–1971

On October 21, 1957, four years after North Shore sub-division passenger trains ended, a train from Washington, D.C.—the last SIRT special—carried Queen Elizabeth II and Prince Philip across the Arthur Kill Bridge en route to the Staten Island Ferry after a meeting with President Eisenhower. The special train movement was conducted in secrecy and the tracks along the route were cleared for this occasion. The train traveled over B&O, Reading Company, and Lehigh Valley lines to get to Staten Island Junction and the SIRT. The royal train, along with a press train, ended its run at a freight yard at Stapleton.[4]Шаблон:Rp[45]

Файл:Arthur Kill Lift Bridge view of tracks.jpg
A view of the Arthur Kill Lift Bridge built in 1958.

In November 1947, the Arthur Kill swing bridge was knocked off its center pier foundation by a passing oil tanker, rendering the bridge useless.[18]Шаблон:Rp Freight had to be rerouted through float bridges, with most of it passing through the Central Railroad of New Jersey's yards. The bridge was then condemned by the Army Corps of Engineers.[210] Work on a replacement span started in 1955.[18]Шаблон:Rp On August 25, 1959, the damaged bridge was replaced with a state-of-the-art, single track, Шаблон:Convert vertical lift bridge.[45] The 2,000 ton lift span was prefabricated then floated into place.[4]Шаблон:Rp The new bridge was raised Шаблон:Convert; because the new bridge aided navigation on the Arthur Kill, the United States Government assumed 90 percent of the $11,000,000 cost of the project.[74]Шаблон:Rp The old bridge had been condemned and ordered replaced by the United States Secretary of the Army in 1949, with an expected cost of $8,000,000 to be split between the SIRT and the U.S. Government.[211] When the bridge reopened, long-unit coal trains from West Virginia began using an extension of the Travis Branch, on Staten Island's West Shore to serve a new Consolidated Edison power plant in Travis.[4]Шаблон:Rp[45]

The closure of Bethlehem Steel in 1960 and of U.S. Gypsum in 1972 led to a dramatic decline in rail traffic via the Arthur Kill Bridge, although there still was enough traffic in the 1970s to keep car floats reasonably busy.[45]

Final grade-crossing elimination: 1960–1964

On November 7, 1960, an accident took place at the grade crossing at North Railroad Avenue and Bancroft Avenue, four blocks away from the New Dorp station. An eight-year-old girl was killed and 31 children were injured as a train struck a crowded school bus as it was about to exit the crossing. A grand jury had ordered the closure of this crossing and 12 others along this stretch of the line, after a train killed a high-school girl at a crossing eight blocks away in December 1959. The railroad had been given an extension of time so it could install gates.[212] On November 10, 1960, Staten Island Borough President Albert Maniscalco ordered the closure of this grade crossing and announced that he expected work on eliminating the grade crossing to begin the following year.[213]

On August 29, 1964, the PSC approved a $10,923,000 project to eliminate the last remaining grade-crossings on the line between the Jefferson Avenue and Grant City stations. As part of the project, new platforms and station buildings were built at New Dorp and Grant City, and new platforms were built at Jefferson Avenue. To eliminate the grade crossing, the line was raised on an embankment for part of the way and was depressed into an open cut for the rest.[214] To avoid interfering with train service, a temporary track was constructed to the east of the original line and a new, crossing-free line was constructed upon the original right of way.[6]Шаблон:Rp

Following the 1964 opening of the Verrazzano-Narrows Bridge, which directly connected Staten Island with the rest of the city by road, ridership on the SIRT, which had been steadily increasing at a rate of 300,000 a year in the early 1960s, increasing 34 percent between 1960 and 1964, precipitously declined. Annual ridership decreased from 6.4 million in 1964 to 5.7 million in 1965. The previous ridership growth had been despite increasing car ownership.[215]

City operation of passenger service: 1971–present

Transfer to MTA operation: 1968–1971

Файл:STATEN ISLAND RAPID TRANSIT, PART OF THE NEW YORK SUBWAY SYSTEM, CONNECTS THE SMALL TOWNS OF THE BOROUGH OF RICHMOND - NARA - 547842.jpg
A view of the new R44 train cars put into service once the rail line was under the auspices of the Metropolitan Transportation Authority.

In May 1968, the President of the Metropolitan Transportation Authority (MTA), William Ronan, proposed that New York City take control of the SIRT and spend $25 million on modernizing the line. This proposal was part of a 20-year, $2.9-billion plan announced by the agency on February 28. Some of the money allocated to the SIRT would be used to purchase new trains.[204] On December 18, 1969, the Board of Estimate approved the purchase of the SIRT for $1 and the use of $3.5 million to purchase the line's 48 cars, Шаблон:Convert of real estate, the air rights over the tracks, and the line's Clifton Shops. The additional land was purchased to allow for a wider right-of-way, parking lots, and station improvements. As part of the agreement, the B&O would continue to operate freight service over the line once a day.[216]

On January 1, 1970, New York City's lease of the Tottenville line was terminated; after that date the city reimbursed the railroad for its passenger deficits. On May 29, 1970, New York City and the SIRT entered an agreement for NYC to purchase the Tottenville line, as part of which the SIRT was reserved the right to operate freight service over the line. The city was required to ensure the track was in good condition for SIRT's freight operations.[217]Шаблон:Rp The freight operation was reorganized as the Staten Island Railroad Corporation.[18]Шаблон:Rp On June 29, 1970, the Staten Island Rapid Transit Operating Authority was incorporated as a subsidiary of the state's MTA to acquire and operate the SIRT.[218]Шаблон:Rp

On April 21, 1971, the ICC approved the city's purchase of the line. On July 1, 1971, operation of the Tottenville line was turned over to the Staten Island Rapid Transit Operating Authority, a division of the state's MTA. The line itself was purchased by the City of New York for $1 and the MTA paid the B&O $3.5 million for the line's equipment.[219] Grade crossings along the Tottenville line had to be removed by the B&O to finalize the deal. Grade crossings were supposed to have been eliminated in the 1930s but a lack of finances—partially resulting from the Great Depression and World War II—prevented it.[45]

Despite MTA improvements, problems persist: 1970s and 1980s

On June 15, 1972, five 1955-built, air-conditioned coaches on loan from the Long Island Rail Road (LIRR) went into service on the SIRT. One three-car train made one round trip during the morning and operated again during the afternoon peak.[2]Шаблон:Rp[220]Шаблон:Rp As a result of previous tests, the edges of the platforms at St. George were trimmed for the extra clearance required by the LIRR cars, which were Шаблон:Convert long. The cars were only Шаблон:Convert longer than the 45 cars in operation but had a seating capacity of 123 passengers—almost double the capacity of the other coaches.[221]

On February 1, 1972, the fare on the SIRT was increased for the first time since 1958, to 35 cents from an average fare of 22 cents; the system used to have zoned fares. The fare increase applied to the whole system and was accompanied by the elimination of commutation tickets and student tickets. Previously, fares ranged from 20 to 35 cents. Sixteen percent of riders of the 17,000 daily riders had no change in fare. There was a 10 percent increase for 51 percent of passengers and a 15 percent increase for the remaining 33 percent. The fare increase was expected to bring in an extra $400,000 a year.[222]

At the time, the line was operating at a deficit of $2.9 million a year, with $2.5 million of it offset by a subsidy from the city. The MTA had plans for a $25 million improvement program for the line including new train cars. Improvements were also planned for the tower and signal systems, for the roadbed and for the stations. Increased power, Шаблон:Convert of new rails, and mercury-vapor lighting at 14 of the 22 stations were also part of the plan.[223] Three quarters of the $25 million were to be provided by 1967 state transportation bond issue and the remaining $6.25 million was to be paid by the city.[222]

On February 28, 1973, the first six new R44 cars were put into service on the SIRT. These were part of a 52-car order from the Saint Louis Car Company—the same type of cars as the newest cars then in use on subway lines in the other boroughs. The R44s replaced the ME-1 rolling stock inherited from the B&O that had remained in continuous service since 1925 when the system was electrified.[2]Шаблон:Rp[220]Шаблон:Rp[223]

During the 1970s, the MTA's ability to improve service on the line was hampered by several strikes by the SIRT's workers. From December 11, 1975, to April 1976, service on the SIRT was shut down because the line's 61 motormen and conductors went on strike. The strike ended once the MTA agreed to give them 14% wage increases.[224]

In December 1976, SIRTOA recently completed projects to provide remote control of SIRT's electrical substations from the central one at St. George, and to install a two-way radio system. The former project improved the reliability of the system's power system, while the latter provided direct communication between the St. George control center and all trains, allowing information about the status of SIRT operations to be sent immediately to train staff and passengers on trains.[225]

In December 1977, SIRTOA was preparing to begin construction on a pair of projects that would allow longer four-car trains to be run during rush hours regularly. New York City covered 25 percent of the cost of the projects, while New York State covered the remaining 75 percent. The first project was the construction of a new electrical substation capable of handling 4,000 kilowatts in Grant City, and the second was the expansion and modernization of the repair shop at Clifton Yard.[226]

Work on the new Grant City substation building, which would cost $506,592, was expected to start in January 1978 and be completed by March 1979, while the installation of electrical equipment, which would cost $1.8 million, would begin in September 1978 and be completed in 1980. The project was the first in a series of improvement part of a long-term program to upgrade the SIRT's electrical supply and make it more reliable. In later phases, the new equipment installed in the new Grant City substation would also be installed in older substations on the line. In response to complaints from nearby residents, the design of the substation was modified to blend in with the character of the surrounding residential area, and would be constructed within the SIRT's open cut right-of-way. In addition, greenery and shrubs would be installed to beautify the structure's roof, which was located at street level. Work on the project was finally underway in April 1979, and was expected to be completed by the end of 1980.[226]

The Clifton Yard project was planned to improve the maintenance of the SIRT's new fleet of R44 cars. This $3.9 million project, as of December 1977, was expected to begin in 1978 and be completed by the end of 1979. The project would extend and modernize the car maintenance shop, and construct new storage facilities, and a new two-story motor and wheel repair shop. The extension of the existing maintenance shop would allow the inspection pits to be rebuilt. These pits were designed to fit the ME-1 cars, which were Шаблон:Convert shorter than the R44 cars. The improvements at the shop would increase the number of cars that could be overhauled and inspected daily by 50 percent. As of April 1979, work was expected to be completed by the middle of 1980.[226]

On August 6, 1980, an MTA committee evaluated whether it should continue operating the rail line.[227] On September 28, 1981, Assemblyman Robert Straniere announced that half of the $25 million allocated for capital improvements to the SIRT from bond use funds would be used for improved power distribution and the modernization of stations. Eleven stations would have their platforms extended, completing the extension of platforms along the line and two stations would have their wooden platforms replaced. In addition, equipment at four substations would be improved, new switches would be installed at Tottenville interlocking, and the wye track at St. George would be realigned to fit four-car trains, among other improvements.[228] As part of the MTA's inaugural Capital Program from 1981, Pleasant Plains and Prince's Bay stations were rebuilt and the platforms at several other stations were lengthened.[229]

On September 23, 1985, SIRTOA began work to repair structural problems at ten stations, including crumbling stairways. Temporary access paths, platforms and stairways were constructed to allow service to be maintained while work was underway.[230]

On October 22, 1986, midday service was reduced in frequency from one train every 20 minutes to one every 30 minutes, due to a reduction in ferry service. Weekend service was reduced by 15 trains to 78 and weekday service was reduced by 15 to 109. In the following two years, ridership reduced from 6.47 million to 6.23 million.[231]

Improvements in fare collection: 1985–1994

Beginning on December 18, 1985, passengers traveling between 5:50 a.m. and 10 a.m. were required to pay their fares after they exit the train. People exiting at St. George were required to pay their fares by dropping a pre-purchased ticket in a box near twelve turnstiles, which were rearranged to reduce backups. Previously these turnstiles were only used for evening rush hours. At other stations, riders were to pay their fares as they exited station platforms. The change was made to reduce fare evasion. Despite the fact that ridership on the railroad increased 38 percent since 1977, revenue did not grow as conductors collecting tickets often could not get to all passengers in time due to crowding on trains. At the time, tickets could be purchased at Tottenville and St. George at all times, or from Grant City, New Dorp, Dongan Hills, Oakwood Heights, Eltingville and Great Kills between 6 a.m. and 2 p.m.[232]

Tokens began to be accepted at St. George on April 20, 1988. A month later, tokens were used by 80 percent of riders.[231] Tokens could be bought at vending machines between 6 a.m. and 10 a.m. at Huguenot, Annadale, Eltingville, Great Kills, Oakwood Heights, New Dorp, Grant City, and Dongan Hills, and at St. George at all times.[233] On October 18, 1992, the NYCTA began distributing free transfers between the SIRT and bus routes on Staten Island.[234]

On March 31, 1994, MetroCards began being accepted for fare payment at the St. George station, making it the 50th subway or Staten Island Railway station to accept it.[235] On July 4, 1997, the MTA eliminated fares for trips between Tompkinsville and Tottenville.[236] This fare cut was part of the "One City, One Fare" fare cuts in 1997. The change was made, in part, because no turnstiles were installed at any of the other stations along the line. Riders using St. George began having to pay while entering and exiting.[237][238][239] Previously, fares were collected on board by the conductor. Passengers on weekday trains arriving at St. George between 5:50 a.m. and 10:50 a.m. had to pay their fares with a token, special fare ticket, or a transfer when they exited. MetroCards were accepted at St. George while cash, transfers, tokens, and special fare tickets were accepted by conductors at the other stations.[231][233] Also on July 4, 1997, the Staten Island Ferry was made free.[240] The union representing the SIR's workers, United Transportation Union local 1440, was worried about the change, in part because of an expected rise in ridership.[241] The removal of fares was blamed for an immediate spike of crime along the line.[242]

Rebranding and service improvements: 1990s

The MTA rebranded the Staten Island Rapid Transit as the MTA Staten Island Railway (SIR) on April 2, 1994; Staten Island Railway was the line's original name.[4]Шаблон:Rp[3] This move followed the transfer of the Staten Island Rapid Transit from the New York City Transit Authority's Surface Transit Division to the Department of Rapid Transit on July 26, 1993.[243]

On December 2, 1991, service on the SIRT changed from four-car trains to two-car trains between 9 p.m. and 5 a.m. to reduce track and car maintenance costs. In February 1992, it was estimated that the change led to reduced energy costs and a 13 percent reduction in car maintenance costs.[244] This change was originally intended to go into effect by June 1988.[245]Шаблон:Rp In 1988, it was decided to transfer 12 R44 cars from the New York City Subway to the SIR in anticipation of expanding trains to five cars to accommodate an expected growth in ridership and to reduce overcrowding, which did not materialize.[245]Шаблон:Rp[246] During the mid-2000s, some trains did run with five cars. The SIR timetable stated, "Select rush hour trains operate with additional cars. For a more comfortable ride, please use all available cars."[247] Platforms at 18 stations were lengthened to accommodate five-car trains in 1988.[245]Шаблон:Rp

In 1993, the Dongan Hills station became accessible under the Americans with Disabilities Act of 1990.[248] In 1998, renovations were completed at St. George, Tompkinsville, Stapleton, New Dorp, Richmond Valley and Tottenville.[249]

On April 7, 1999, three additional afternoon express runs, which skipped stops between St. George and Great Kills, were added to the schedule, almost doubling the previously scheduled express service.[250]

On June 24, 2001, a small section of the easternmost portion of the North Shore Branch (a few hundred feet) was reopened to provide passenger service to the new Richmond County Bank Ballpark, home of the Staten Island Yankees minor-league baseball team.[251][252] The station cost $3.5 million to build.[253] One train was scheduled to travel to/from Tottenville and two or three shuttle trains from St. George served the station. Trains last served the station in September 2009 and the service was discontinued as part of budget cuts on June 18, 2010, the day of the first scheduled home game for the Yankees. The elimination of this service saved $30,000 annually.[254][255]

Consistent growth: 2000s and 2010s

In 2004, the SIR put out its preliminary budget for 2005; it proposed several service cuts to offset an increased debt. For 2005, the agency proposed implementing One Person Train Operation, adding fare collection at Tompkinsville, reducing the fleet to 52 cars, eliminating express service, and reducing trains to two cars during off-peak hours. For 2006, it proposed eliminating weekend service from 2 a.m. Saturday to 5 a.m. Monday.[246] Starting on May 1, 2005, SIR trains started running with two cars between 9 p.m. to 5 a.m. every night, stopping near station entrances to deter crime.[256]

In June 2005, a new cab signaling system and a new control center went into effect at St. George; the system is still in use Шаблон:As of and has received minor upgrades.[257] These improvements cost $100 million and helped enhance safety and increase operational flexibility. The new signal system provided improved signal visibility, continuous speed enforcement, and central monitoring at St. George, and the ability to remotely change switch positions; all switches on the main line were interlocked as part of the project.[258] The cab signalling system sounds an alarm inside the cab to control train speeds and automatically applies the brake if needed. Prior to the new system's implementation, there were no safeguards in place to prevent trains traveling at full speed after ignoring a signal and continuing past a bumping block. The new signal system required the installation of Шаблон:Convert of underground fiber optic cable. The signals system limits the maximum speed at certain points and at sharp curves, and limits trains to Шаблон:Convert when approaching a terminal.[259]

On July 17, 2006, rush-hour express service was sped up, with all morning express trains running non-stop from New Dorp to St. George. Evening express service started earlier under the new timetable.[260] In response to record ridership growth on the SIR, rush-hour express service was expanded in late 2007. Evening service was expanded on November 14 when five additional express trains were added, expanding the span of express service by 80 minutes. Morning service express service was expanded on December 5. The span of express service was extended by 45 minutes during the morning with the addition of three express trains. Express service was also added in the off-peak direction to Tottenville during the morning, with five express trips leaving St. George. Five local trains were also added to the schedule.[258][261]

Файл:Bard Av SIRT jeh.JPG
The right-of-way for the North Shore Branch still exists, but some portions of, such as the areas along the Kill van Kull, which can be seen in this picture, need extensive work to be done for it to be reactivated for heavy rail, light rail, or bus use.

A new stationhouse at Tompkinsville opened on January 20, 2010, with turnstiles installed for the first time. The stationhouse cost $6.9 million, and was equipped with low turnstiles and fare vending machines. The turnstiles were installed because passengers often avoided paying the fare by exiting at Tompkinsville and taking a short, Шаблон:Convert walk to the St. George ferry terminal.[262][263] It was estimated the SIR lost $3.4 million every year as a result. Trains heading to St. George during the morning rush hour, and trains leaving St. George in the evening rush hour had skipped Tompkinsville and Stapleton in an effort to reduce fare evasion. Service stopped at these stations every hour while all other rush hour trains bypassed them. After the installation of the turnstiles, the revenue generated at Tompkinsville made up 15% of the SIR's revenue. Schedules were changed, with locals and most non-rush hour trains stopping.[231] In 2010, it was announced the MTA planned to restore fare collection on the entire line to raise more revenue and reduce crime. This was planned to be implemented once the MetroCard was replaced with a smartcard. In the interim, the MTA proposed installing turnstiles at Grasmere because it is a heavily used transfer point to the S53 bus to Brooklyn.[264]

Файл:A view of the overpass at Arthur Kill from the northbound platform.jpg
The Arthur Kill station opened in January 2017, replacing the Nassau and Atlantic stations. It was the first new station to open on the railway since the 1930s.

In a 2006 report, the Staten Island Advance explored the restoration of passenger services on Шаблон:Convert of the North Shore Branch between St. George Ferry Terminal and Arlington station. Completion of the study is necessary to qualify the project for the estimated $360 million. A preliminary study found ridership could reach 15,000 daily.[265] U.S. Senator Chuck Schumer from New York requested $4 million of federal funding for a detailed feasibility study.[266] In 2012, the MTA released an analysis of transportation solutions for the North Shore, which included proposals for the reintroduction of heavy rail, light rail, or bus rapid transit using the North Shore line's right-of-way. Other options included transportation systems management, which would improve existing bus service, and the possibility of future ferry and water taxi services. Bus rapid transit was preferred for its cost and relative ease of implementation, which would require $352 million in capital investment. Шаблон:As of, the project has yet to receive funding.[267]Шаблон:Rp

On May 21, 2012, Grasmere station started to be rehabilitated. The construction included demolition and rebuilding of the station platform and station house. A temporary platform and entrance were built north of the main station. Construction was finished in April 2014.[268][269][270]

A new, ADA-compliant station named Arthur Kill, near the southern terminus of the present line, opened on January 21, 2017, after numerous delays. The station is sited between Atlantic and Nassau stations, which it replaced. Atlantic and Nassau were in the poorest condition of all the stations on the line.[271][272] Unlike the Atlantic and Nassau stations, Arthur Kill is able to platform a four-car train.[273] The MTA has provided parking for 150 automobiles near the station. Ground was broken for the $15.3 million station on October 18, 2013.[274] The contract for the project was awarded on July 31, 2013.[275] The building of a station at Rosebank, which would bridge the gap between Grasmere and Clifton stations—the longest gap between stations on the line—has also been discussed. A Rosebank station once existed on the now-defunct South Beach Branch of the railway.[276]

The 2015–2019 MTA Capital Plan called for the SIR's Richmond Valley station and 32 subway stations to undergo a complete overhaul as part of the Enhanced Station Initiative. Updates would include the addition of cellular service, Wi-Fi, USB charging stations, interactive service advisories and maps, improved signage, and improved station lighting.[277][278] The capital plan also called for the reconstruction of the Clifton Yard, which had been damaged during Hurricane Sandy in 2012, as well as the addition of storm walls at St. George. The St. George flood walls were finished in mid-2017, while the Clifton Yard reconstruction was to be completed in 2021.[279] In 2022, the MTA awarded a contract to install seven Шаблон:Convert monopole antennas to replace the SIR's existing radio system.[280]

Decline and rebirth of freight: 1971–present

Decline: 1971–2000

Through a merger with the Chesapeake and Ohio Railway, the B&O became part of the larger C&O system. The freight operation on the island was renamed the Staten Island Railroad Corporation in 1971, after it was separated from the island's passenger service. On April 1, 1976, the Federal Government created Conrail to take over the potentially profitable lines of multiple bankrupt carriers in the northeast United States; as a result the B&O and C&O became isolated from their properties in New Jersey and Staten Island.[281] Most of their freight service, with the exception of one daily train to Cranford Junction, was truncated to Philadelphia. By 1973, the car float yard at Jersey City operated by Jersey Central had closed. Afterwards, the car float operation at Saint George Yard was brought back; the New York Dock Railway took over the operation in September 1979, but closed it the next year.[18]Шаблон:Rp Only a few isolated industries on Staten Island were using rail service for freight, essentially abandoning St. George Yard.[4]Шаблон:Rp[45]

A lack of business led the C&O system to sell the Staten Island Railroad to the New York, Susquehanna & Western Railroad, which was owned by the Delaware Otsego Corporation on April 24, 1985.[282][283] In October 1989, the Susquehanna embargoed the Шаблон:Convert of track east of Elm Park on the North Shore Branch, ending rail freight traffic to Saint George.[18]Шаблон:Rp In 1990, the line's largest customer, Procter & Gamble, closed, leading to a large drop in freight traffic. The last freight train ran over the Arthur Kill Vertical Lift Bridge in 1990 and the bridge was taken out of service on July 25, 1991. Afterwards, the North Shore Branch and the Arthur Kill Bridge were taken over by CSX. The line and bridge were purchased again in 1994, this time by the New York City Economic Development Corporation (NYCEDC), whose purchase was followed by a decade of false starts.[4]Шаблон:Rp In 1998, Conrail broke up, allowing parts of lines once operated by the competitors of the B&O to become a part of CSX. The railroad line was still intact from Cranford Junction to Arlington.[45]

Reactivation: 2000–present

Шаблон:See alsoDuring the early 2000s, the Port Authority of New York and New Jersey announced plans to reopen the Staten Island Railroad line in New Jersey. Since the Jersey Central became a New Jersey Transit line, a new junction would be built to the ex-Lehigh Valley Railroad line. Two rail tunnels from Brooklyn were planned—one to Staten Island and one to Greenville, New Jersey—and would allow freight to pass through New York on its way from New England to the South.[45] In December 2004, a $72 million project to reactivate freight service on Staten Island and to repair the Arthur Kill Vertical Lift Bridge was announced by the NYCEDC and the Port Authority. Specific projects on the Arthur Kill Vertical Lift Bridge included repainting the steel superstructure and rehabilitating the lift mechanism.[284] In June 2006, the freight line connection from New Jersey to the Staten Island Railroad was completed, and became operated in part by the Morristown and Erie Railway under contract with other companies and New Jersey.[285]

The Arthur Kill Vertical Lift Bridge was renovated in 2006 and began regular service on April 2, 2007; 16 years after it was closed.[286] As part of the project, a portion of the North Shore Branch was rehabilitated, the Arlington Yard was expanded, and Шаблон:Convert of new track was laid along the Travis Branch to Fresh Kills.[287] Soon after service restarted on the line, Mayor Michael Bloomberg officially commemorated the reactivation on April 17, 2007.[288] Service was provided by CSX Transportation, Norfolk Southern Railway, and Conrail over the Travis Branch to haul waste from the Staten Island Transfer Station at Fresh Kills and ship container freight from the Howland Hook Marine Terminal and other industrial businesses. Along the remainder of the North Shore Branch, there are still tracks and rail overpasses in some places.[289][290]Шаблон:Rp

Notes

Шаблон:Notelist

References

Шаблон:Reflist

Шаблон:Staten Island Rapid Transit Operating Authority

  1. 1,00 1,01 1,02 1,03 1,04 1,05 1,06 1,07 1,08 1,09 1,10 1,11 1,12 1,13 1,14 1,15 1,16 1,17 Шаблон:Cite book
  2. 2,0 2,1 2,2 2,3 Шаблон:Cite book
  3. 3,0 3,1 Шаблон:Cite news
  4. 4,00 4,01 4,02 4,03 4,04 4,05 4,06 4,07 4,08 4,09 4,10 4,11 4,12 4,13 4,14 4,15 4,16 4,17 4,18 4,19 4,20 4,21 4,22 4,23 4,24 4,25 Шаблон:Cite book
  5. 5,00 5,01 5,02 5,03 5,04 5,05 5,06 5,07 5,08 5,09 5,10 5,11 5,12 5,13 5,14 5,15 5,16 5,17 5,18 5,19 5,20 Шаблон:Cite book
  6. 6,00 6,01 6,02 6,03 6,04 6,05 6,06 6,07 6,08 6,09 6,10 6,11 6,12 Шаблон:Cite web
  7. 7,0 7,1 7,2 7,3 7,4 7,5 7,6 7,7 Шаблон:Cite book
  8. 8,0 8,1 Шаблон:Cite journal
  9. 9,0 9,1 Шаблон:Cite book
  10. Шаблон:Cite news
  11. Шаблон:Cite news
  12. Шаблон:Cite book
  13. 13,0 13,1 13,2 13,3 13,4 13,5 13,6 Шаблон:Cite book
  14. Шаблон:Cite web
  15. 15,0 15,1 Шаблон:Cite news
  16. 16,00 16,01 16,02 16,03 16,04 16,05 16,06 16,07 16,08 16,09 16,10 16,11 16,12 16,13 16,14 Шаблон:Cite web
  17. Шаблон:Cite news
  18. 18,00 18,01 18,02 18,03 18,04 18,05 18,06 18,07 18,08 18,09 18,10 18,11 18,12 18,13 18,14 18,15 18,16 18,17 18,18 18,19 18,20 Шаблон:Cite book
  19. 19,0 19,1 Шаблон:Cite news
  20. 20,0 20,1 20,2 Шаблон:Cite book
  21. Шаблон:Cite news
  22. 22,0 22,1 22,2 22,3 Шаблон:Cite web
  23. Шаблон:Cite book
  24. Шаблон:Cite book
  25. 25,0 25,1 25,2 Шаблон:Cite book
  26. Шаблон:Cite book
  27. Шаблон:Cite news
  28. Шаблон:Cite book
  29. Шаблон:Cite book
  30. 30,0 30,1 30,2 30,3 Шаблон:Cite news
  31. Шаблон:Cite news
  32. 32,0 32,1 Шаблон:Cite news
  33. Шаблон:Cite news
  34. Шаблон:Cite book
  35. Шаблон:Cite book
  36. Шаблон:Cite web
  37. Шаблон:Cite book
  38. Шаблон:Cite news
  39. Шаблон:Cite book
  40. Шаблон:Cite book
  41. Шаблон:Cite web
  42. 42,0 42,1 42,2 Шаблон:Cite book
  43. 43,0 43,1 43,2 Шаблон:Cite book
  44. Шаблон:Cite news
  45. 45,00 45,01 45,02 45,03 45,04 45,05 45,06 45,07 45,08 45,09 45,10 45,11 45,12 45,13 45,14 45,15 Шаблон:Cite web
  46. Шаблон:Cite news
  47. Шаблон:Cite news
  48. Шаблон:Cite news
  49. Шаблон:Cite news
  50. Шаблон:Cite book
  51. Шаблон:Cite web
  52. 52,0 52,1 52,2 Шаблон:Cite book
  53. Шаблон:Cite web
  54. Шаблон:Cite web
  55. Шаблон:Cite book
  56. 56,0 56,1 Шаблон:Cite book
  57. Шаблон:Cite news
  58. 58,0 58,1 Шаблон:Cite book
  59. Шаблон:Cite book
  60. Шаблон:Cite web
  61. Шаблон:Cite book
  62. 62,0 62,1 62,2 62,3 Шаблон:Cite news
  63. Шаблон:Cite web
  64. 64,0 64,1 Шаблон:Cite news
  65. Шаблон:Cite book
  66. 66,0 66,1 Шаблон:Cite book
  67. Шаблон:Cite news
  68. Шаблон:Cite book
  69. Шаблон:Cite web
  70. Шаблон:Cite news
  71. 71,0 71,1 Шаблон:Cite news
  72. Шаблон:Cite book
  73. Шаблон:Cite book
  74. 74,0 74,1 Шаблон:Cite book
  75. Шаблон:Cite news
  76. Шаблон:Cite news
  77. Шаблон:Cite news
  78. Шаблон:Cite news
  79. Шаблон:Cite web
  80. Шаблон:Cite web
  81. Шаблон:Cite book
  82. Шаблон:Cite news
  83. Шаблон:Cite news
  84. Шаблон:Cite news
  85. Шаблон:Cite news
  86. Шаблон:Cite book
  87. Шаблон:Cite journal
  88. Шаблон:Cite web
  89. Шаблон:Cite news
  90. Шаблон:Cite news
  91. Шаблон:Cite news
  92. Шаблон:Cite news
  93. 93,0 93,1 Шаблон:Cite news
  94. 94,0 94,1 Шаблон:Cite news
  95. Шаблон:Cite news
  96. 96,0 96,1 Шаблон:Cite news
  97. Шаблон:Cite news
  98. Шаблон:Cite news
  99. Шаблон:Cite news
  100. Шаблон:Cite news
  101. Шаблон:Cite news
  102. Шаблон:Cite news
  103. Шаблон:Cite news
  104. 104,0 104,1 Шаблон:Cite news
  105. Шаблон:Cite news
  106. Шаблон:Cite news
  107. Шаблон:Cite news
  108. Шаблон:Cite news
  109. Шаблон:Cite news
  110. 110,0 110,1 Шаблон:Cite news
  111. 111,0 111,1 Шаблон:Cite news
  112. Шаблон:Cite news
  113. Шаблон:Cite news
  114. Шаблон:Cite news
  115. Шаблон:Cite news
  116. Шаблон:Cite news
  117. Шаблон:Cite news
  118. Шаблон:Cite news
  119. Шаблон:Cite news
  120. 120,0 120,1 120,2 120,3 120,4 120,5 Шаблон:Cite book
  121. Шаблон:Cite book
  122. Шаблон:Cite journal
  123. Шаблон:Cite book
  124. Шаблон:Cite journal
  125. Шаблон:Cite news
  126. 126,0 126,1 Шаблон:Cite news
  127. 127,0 127,1 Шаблон:Cite news
  128. 128,0 128,1 Шаблон:Cite book
  129. 129,0 129,1 Шаблон:Cite web
  130. Шаблон:Cite news
  131. Шаблон:Cite web
  132. Шаблон:Cite book
  133. 133,0 133,1 Шаблон:Cite journal
  134. Шаблон:Cite web
  135. Шаблон:Cite news
  136. Шаблон:Cite book
  137. Шаблон:Cite news
  138. Шаблон:Cite book
  139. Шаблон:Cite news
  140. Шаблон:Cite news
  141. Шаблон:Cite book
  142. 142,0 142,1 Шаблон:Cite book
  143. Шаблон:Cite news
  144. Шаблон:Cite news
  145. Шаблон:Cite news
  146. Шаблон:Cite news
  147. Шаблон:Cite news
  148. Шаблон:Cite news
  149. Шаблон:Cite book
  150. Шаблон:Cite web
  151. Шаблон:Cite news
  152. Шаблон:Cite journal
  153. Шаблон:Cite book
  154. Шаблон:Cite book
  155. Шаблон:Cite news
  156. Шаблон:Cite book
  157. Шаблон:Cite web
  158. Шаблон:Cite book
  159. Шаблон:Cite journal
  160. Шаблон:Cite journal
  161. Шаблон:Cite book
  162. Шаблон:Cite news
  163. Шаблон:Cite news
  164. Шаблон:Cite book
  165. Шаблон:Cite news
  166. Шаблон:Cite news
  167. Шаблон:Cite news
  168. Шаблон:Cite news
  169. Шаблон:Cite journal
  170. Шаблон:Cite news
  171. Шаблон:Cite book
  172. Шаблон:Cite news
  173. Шаблон:Cite news
  174. Шаблон:Cite news
  175. Шаблон:Cite news
  176. Шаблон:Cite book
  177. Шаблон:Cite news
  178. Шаблон:Cite journal
  179. Шаблон:Cite news
  180. Шаблон:Cite news
  181. Шаблон:Cite news
  182. Шаблон:Cite news
  183. Шаблон:Cite news
  184. Шаблон:Cite news
  185. Шаблон:Cite news
  186. Шаблон:Cite web
  187. Шаблон:Cite news
  188. Шаблон:Cite news
  189. Шаблон:Cite news
  190. Шаблон:Cite news
  191. Шаблон:Cite news
  192. Шаблон:Cite news
  193. Шаблон:Cite news
  194. Шаблон:Cite news
  195. Шаблон:Cite news
  196. Шаблон:Cite book
  197. Шаблон:Cite news
  198. Шаблон:Cite news
  199. Шаблон:Cite news
  200. Шаблон:Cite news
  201. Шаблон:Cite news
  202. Шаблон:Cite news
  203. Шаблон:Cite news
  204. 204,0 204,1 Шаблон:Cite news
  205. Шаблон:Cite news
  206. Шаблон:Cite news
  207. Шаблон:Cite news
  208. Шаблон:Cite news
  209. Шаблон:Cite news
  210. Шаблон:Cite news
  211. Шаблон:Cite news
  212. Шаблон:Cite news
  213. Шаблон:Cite news
  214. Шаблон:Cite news
  215. Шаблон:Cite book
  216. Шаблон:Cite news
  217. Шаблон:Cite book
  218. Шаблон:Cite book
  219. Шаблон:Cite news
  220. 220,0 220,1 Шаблон:Cite book
  221. Шаблон:Cite news
  222. 222,0 222,1 Шаблон:Cite news
  223. 223,0 223,1 Шаблон:Cite news
  224. Шаблон:Cite news
  225. Шаблон:Cite journal
  226. 226,0 226,1 226,2 * Шаблон:Cite journal
  227. Шаблон:Cite news
  228. Шаблон:Cite news
  229. Шаблон:Cite news
  230. Шаблон:Cite news
  231. 231,0 231,1 231,2 231,3 Шаблон:Cite journal
  232. Шаблон:Cite news
  233. 233,0 233,1 Шаблон:Cite web
  234. Шаблон:Cite news
  235. Шаблон:Cite news
  236. Шаблон:Cite web
  237. Шаблон:Cite news
  238. Шаблон:Cite news
  239. Шаблон:Cite news
  240. Шаблон:Cite web
  241. Шаблон:Cite news
  242. Шаблон:Cite news
  243. Шаблон:Cite news
  244. Шаблон:Cite news
  245. 245,0 245,1 245,2 Шаблон:Cite web
  246. 246,0 246,1 Шаблон:Cite web
  247. Шаблон:Cite web
  248. Шаблон:Cite news
  249. Шаблон:Cite news
  250. Шаблон:Cite news
  251. Шаблон:Cite journal
  252. Шаблон:Cite news
  253. Шаблон:Cite news
  254. Шаблон:Cite web
  255. Шаблон:Cite web
  256. Шаблон:Cite web
  257. Шаблон:Cite web
  258. 258,0 258,1 Шаблон:Cite web
  259. Шаблон:Cite news
  260. Шаблон:Cite web
  261. Шаблон:Cite web
  262. Шаблон:Cite news
  263. Шаблон:Cite web
  264. Шаблон:Cite news
  265. Шаблон:Cite news
  266. Шаблон:Cite web
  267. Шаблон:Cite web
  268. Шаблон:Cite news
  269. MTA Grasmere Station Getting Major Repairs Шаблон:Webarchive May 21, 2012
  270. Шаблон:Cite news
  271. Шаблон:Cite web
  272. Шаблон:Cite web
  273. Шаблон:Cite web
  274. Шаблон:Cite web
  275. Шаблон:Cite web
  276. Шаблон:Cite news
  277. Шаблон:Cite web
  278. Шаблон:Cite web
  279. Шаблон:Cite web
  280. Шаблон:Cite web
  281. "Conrail off to a good start" Railway Gazette International March 1977 page 93
  282. Шаблон:Cite book
  283. Шаблон:Cite book
  284. Шаблон:Cite book
  285. Шаблон:Cite web
  286. Шаблон:Cite web
  287. Шаблон:Cite web
  288. Шаблон:Cite press release on December 23, 2007.
  289. Шаблон:Cite web
  290. Шаблон:Cite web