Английская Википедия:Huairou –Daxing Airport intercity railway
Шаблон:Infobox rail line Huairou–Daxing intercity railway (Шаблон:Zh), formerly known as Capital Airport–Daxing Airport intercity railway connecting line (Шаблон:Zh), is a higher-speed railway line currently under construction. The speed will be 200 km/h.[1] It will connect the Beijing Capital International Airport and Beijing Daxing International Airport when the full line is completed.[2]
Phase 1 of the railway, which is currently under construction, will connect Шаблон:Stl station in Langfang, Hebei Province) and Beijing Daxing International Airport. Phase 1 is 39.438 km, including 15.3 km in Beijing and 24.138 km in Hebei Province.[2] Phase 1 of the railway will be finished in 2024.[3][4]
The second phase from Langfang East railway station to Huairou South railway station via Capital Airport is under planning.[5]
Stations
Phase 1 (under construction)
Phase 1 of the railway (Daxing Airport to Langfang East) is shared with the Langzhuo (Langfang–Zhuozhou) intercity railway (Chinese: 廊涿城际铁路).
Station Name[6][4] | Total distance (km) | Travel Time | Transfer | Location | |
---|---|---|---|---|---|
English | Chinese | ||||
Daxing Airport East[6] | Шаблон:Lang | Шаблон:Rint Шаблон:Rail-interchange |
Guangyang District, Langfang, HebeiШаблон:Efn | ||
Lixian[4] | Шаблон:Lang | Daxing District, Beijing | |||
Langfang West[6] | Шаблон:Lang | Guangyang District, Langfang, Hebei | |||
Langfang Kaifaqu[6] | Шаблон:Lang | ||||
Phase 2 (under planning)
The Phase 2 of the railway will be replaced by New Town Link Line (S6) of Beijing Subway and the stations on the line have not announced.
Notes
References
Шаблон:Beijing transit Шаблон:Hebei transit Шаблон:Regional and commuter rail transit in China
- ↑ Шаблон:Cite web
- ↑ 2,0 2,1 Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ 4,0 4,1 4,2 Шаблон:Cite web
- ↑ Ошибка цитирования Неверный тег
<ref>
; для сносокbj
не указан текст - ↑ 6,0 6,1 6,2 6,3 Шаблон:Cite web