Английская Википедия:INS Vishal

Материал из Онлайн справочника
Версия от 12:27, 24 марта 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{Short description|Planned aircraft carrier of the Indian Navy}} {{Use dmy dates|date=October 2019}} <!-- EDIT BELOW THIS LINE --> {|{{Infobox ship begin}} {{Infobox ship image | Ship image = | Ship caption = INS ''Vishal'' }} {{Infobox ship career | Hide header = | Ship country = India | Ship flag = {{shipboxflag|India|naval|center}} | Ship name = INS ''Vishal'' | Ship namesake =...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates

Шаблон:Infobox ship imageШаблон:Infobox ship careerШаблон:Infobox ship characteristics

INS Vishal, also known as Indigenous Aircraft Carrier 3 (IAC-3), is a planned aircraft carrier to be built by Cochin Shipyard Limited for the Indian Navy. It is intended to be the third aircraft carrier to be built in India after Шаблон:INS (IAC-1) and another Vikrant-class aircraft carrier, provisionally called (IAC-2).[1][2] The proposed design of this class will be a new design, featuring significant changes from Vikrant, including an increase in size and displacement. An Electromagnetic Aircraft Launch System (EMALS) CATOBAR system is also under consideration.[3] Its name Vishal means 'grand' in Sanskrit.[4]

Design and development

In April 2011, Admiral Nirmal Kumar Verma claimed that construction of the second carrier was some years away as there were a number of higher spending priorities for the navy.[5] The design stage of IAC-2 began in 2012, and was undertaken by the navy's Naval Design Bureau. The navy decided not to seek outside help in preparing the design concept and implementation plans, but might seek help from the Russian Design Bureau later to integrate Russian aircraft into Vishal. Vishal is proposed to be a flat-top carrier with a displacement of 65,000 tonnes and might have a CATOBAR system, unlike the STOBAR system on IAC-1.[6][7][8][9] In 2013, the Indian Navy reportedly sought to equip the aircraft carrier with EMALS, which could enable the launching of larger aircraft as well as unmanned combat aerial vehicles.[10] General Atomics, the developer of EMALS, also gave a briefing of the technology to Indian Navy officers with the permission of the US Government.[4]

In May 2015, Chief of the Naval Staff Admiral Robin K. Dhowan initially floated the possibility of nuclear propulsion, saying that "all options are open for the second indigenous aircraft carrier. Nothing has been ruled out."[3] On 13 May 2015, Defence Acquisition Council (DAC) allotted Rs.30 crore for initial construction planning process of INS Vishal.[11][12]

The initial plan for the aircraft carrier included nuclear propulsion system,[13] but this was later changed to an integrated electric propulsion system due to the complexities involved in developing a nuclear reactor with a capacity of 500 to 550 megawatts that would possibly take 15 to 20 years.[14][15]

In April 2015, US Under Secretary of Defense for Acquisition and Sustainment Frank Kendall stated that the Obama administration was supportive of selling EMALS to India, amongst other technologies.[16] The Indian Navy also reached out to four international defence companies for suggestions with the design of Vishal, with letters of request sent to the British BAE Systems, French DCNS, American Lockheed Martin and Russian Rosoboronexport on 15 July 2015, according to a report in Jane's Navy International.[17] The letter asked the companies to "provide technical and costing proposals" for the program.[17]

A Joint Working Group on Aircraft Carrier Cooperation was also formed between India and the United States to collaborate on the design and development of aircraft carriers, with the first meeting between Indian Navy and United States Navy naval officers held in August 2015.[18] In October 2017, just ahead of US Secretary of State Rex Tillerson's visit to India, the Trump administration approved the release of technology for the EMALS for Vishal.[19]

On 3 December 2018, Chief of the Naval Staff Sunil Lanba told media that the work on Vishal had moved ahead and the construction of the ship is expected to begin in 3 years.[20][21] Initially, the carrier was expected to enter service by the 2020s,[4][22] but the expected date of completion was later postponed to the 2030s.[23]

British newspaper Daily Mirror reported on 5 May 2019 that India was in talks with the United Kingdom to purchase the detailed plans for Шаблон:HMS to use as the basis of INS VishalШаблон:'s design.[24][25]

In April 2021, the Indian Navy, wanting to give preference to nuclear powered and conventional submarines in future sea-warfare, has decided that it will now begin planning the third aircraft carrier, INS Vishal, as a replacement for the serving Шаблон:INS.[26]

In November 2021, the Indian Navy began discussions on tweaking the designs to accommodate both unmanned and manned aircraft. A slight reduction in size (from the current 65000 tons) was being discussed to reduce weight, cost and time to build the carrier.[27]

In April 2022, state-owned BHEL signed a Memorandum of Understanding with GE Power Conversion, a British-French enterprise now owned by General Electric (as part of the Power and Propulsion Sub-Alliance, which is made up of General Electric Power Conversion, Thales UK, L3 Communications and Rolls-Royce). The purpose of the MoU is to boost indigenous capabilities in developing an Integrated Full Electric Propulsion System (IFEP) for the Indian Navy, including one for the planned aircraft carrier.[28]

As of November 2023, Indian Navy is close to order another Vikrant class 45,000 tonnes STOBAR aircraft carrier.[1][2]

Carrier air wing organization

The carrier air wing of INS Vishal could consist of carrier-based HAL TEDBF. Vishal will have an airwing consisting of UCAVs, as well as a fixed-wing ASW and AEW&C aircraft, in addition to naval fighter aircraft. According to a naval planner, it "could greatly expand our mission envelope with UCAVs, using the pilot-less aircraft for high-risk reconnaissance and suppression of enemy air defences (SEAD). Mid-air refuelling would let us keep UCAVs on a mission for 24–36 hours continuously since pilot fatigue would not be a factor."[4]

See also

References

Шаблон:Reflist

Шаблон:Indian Navy aircraft carriers