Версия от 15:50, 26 марта 2024; EducationBot (обсуждение | вклад) (Новая страница: «{{Английская Википедия/Панель перехода}} {{highway detail hatnote|Interstate 74}} {{Use mdy dates|date=April 2022}} {{Use American English|date=April 2022}} {{Infobox road |state=OH |type=I |route=74 |map={{maplink|frame=yes|plain=yes|frame-align=center|frame-width=290|frame-height=240|frame-lat=39.213|frame-long=-84.680|zoom=10|type=line|raw={{Wikipedia:Map data/Wikipedia KML/Interstate 74 in Ohio}}}} |map_custom=yes |map_no...»)
(разн.) ← Предыдущая версия | Текущая версия (разн.) | Следующая версия → (разн.)
Перейти к навигацииПерейти к поиску

Шаблон:Highway detail hatnote Шаблон:Use mdy dates Шаблон:Use American English Шаблон:Infobox road Interstate 74 (I-74) in the US state of Ohio runs for Шаблон:Convert southeast from the Indiana border to the western segment's current eastern terminus at I-75 just north of Downtown Cincinnati. It is also signed with U.S. Route 52 (US 52) for its entire length.

Route description

The Ohio portion of I-74 begins on the Indiana border near Harrison and travels east. Shortly after crossing into Ohio, the Interstate curves southeast before it intersects with I-275 near milepost 5. It then overlaps with that beltway route, heading generally east for approximately Шаблон:Convert before splitting from I-275 to continue southeast into Cincinnati. Approximately Шаблон:Convert later, I-74 reaches its eastern terminus at I-75, about Шаблон:Convert north-northwest of Downtown Cincinnati.

History

Шаблон:Empty section

Future

Proposals call for I-74 to be continued through Ohio and into West Virginia, concurrent with I-73; with both of these roads continuing through Virginia and North Carolina to end in Myrtle Beach, South Carolina. Due to funding concerns, there are no concrete plans for this to occur.

However, several plans are in the running for the extension through the Cincinnati metropolitan area. They include:

  1. Running along I-75 and I-275, then onto State Route 32 (SR 32);
  2. Along I-75 between the I-74/I-75 interchange and I-75/SR 562 interchange, then onto SR 562, I-71 between SR 562 and Red Bank corridor, down the Red Bank corridor, and along a new highway connector to SR 32; and
  3. From the I-74/I-75 interchange to I-75/SR 562 interchange, then onto SR 562, then along I-71 and I-275 before connecting to SR 32.

The second route was eliminated due to opposition regarding a key part of its completion: a $366.2-million highway that would need to be constructed near Mariemont and Newtown (terminuses: Red Bank Road/Wooster Pike intersection and Bells Lane). Total costs would have been $809.1 million ($62 million per mile (Шаблон:Convert/km)). Improvements to existing roads have been proposed instead.

The Norwood Lateral (SR 562) would need to be reconstructed in order to become part of I-74. It needs the following: a third travel lane in each direction (two each currently), overpasses that would need more vertical clearance (Шаблон:Convert minimum), upgraded ramp extensions at interchanges (Шаблон:Convert), and shoulders that might need more width. There are highways with shoulder widths of Шаблон:Convert, however; so this might not be a serious issue. This problem could be resolved through Congress if they wanted to designate the Norwood Lateral as a future segment of the Interstate Highway System.