Шаблон:Short description Шаблон:Use dmy dates Шаблон:Use British English Шаблон:Infobox rail line The Chesham branch is a single-track railway branch line in Buckinghamshire, England, owned and operated by the London Underground. It runs from a junction at Chalfont & Latimer station on the Metropolitan line for 3.89 miles (6.26 km) northwest to Chesham. The line was built as part of Edward Watkin's scheme to turn his Metropolitan Railway (MR) into a direct rail route between London and Manchester, and it was envisaged initially that a station outside Chesham would be an intermediate stop on a through route running north to connect with the London and North Western Railway (LNWR). Deteriorating relations between the MR and LNWR led to the MR instead expanding to the northwest via Aylesbury, and the scheme to connect with the LNWR was abandoned. By this time much of the land needed for the section of line as far as Chesham had been bought. As Chesham was at the time the only significant town near the MR's new route, it was decided to build the route only as far as Chesham, and to complete the connection with the LNWR at a future date if it proved desirable. Local residents were unhappy at the proposed station site outside Chesham, and a public subscription raised the necessary additional funds to extend the railway into the centre of the town. The Chesham branch opened in 1889.

While construction of the Chesham line was underway, the Metropolitan Railway was also expanding to the northwest, and in 1892 the extension to Aylesbury and on to Verney Junction opened. Most trains on the branch line were operating as a shuttle service between Chesham and the main line at Little Chalfont rather than as through trains to London. The opening in 1899 of the Great Central Railway at Marylebone station, Edward Watkin's connection between London and Manchester, as well as the highly successful Metro-land campaign encouraging Londoners to move to the rural areas served by the railway, led to an increase in traffic in the area, although the Chesham branch was less affected by development than most other areas served by the railway. In 1933 the Metropolitan Railway was taken into public ownership and became the Metropolitan line of the London Underground. London Underground aimed to concentrate on their core business of passenger transport in London, and saw the rural and freight lines in Buckinghamshire as an expensive anomaly. The day-to-day operation of the Chesham branch was transferred to the London and North Eastern Railway, although London Transport retained control. In 1960 the line was electrified, and from 1962 on was operated by London Underground A Stock trains.

In the 1970s and 1980s decaying infrastructure and the withdrawal of subsidies brought the future of the line into doubt. As one of its last acts the Greater London Council paid for the replacement of two bridges on the line, allowing operations to continue. The centenary of the line in 1989 saw a renewal of interest and an upgrading of the trains between London Marylebone station and Chalfont & Latimer made commuting more practical, and usage of the line stabilised. The introduction of London Underground S Stock in 2010 led to the replacement of the shuttle service with half-hourly through trains to and from London.

Background

The English county of Buckinghamshire is bisected by the Chiltern Hills, which rise sharply and cross the county from northeast to southwest.Шаблон:Sfn Although the fertile soil and good drainage of the Chilterns provides ideal conditions for farming, the steep hills historically made travelling difficult. Few sizeable settlements developed in Buckinghamshire, and what roads existed were of poor quality.Шаблон:Sfn

The county town of Aylesbury, immediately north of the Chilterns and Шаблон:Convert from the City of London, was an important agricultural centre. As London grew, the significance of Buckinghamshire as a provider of food increased, particularly following the development of the Aylesbury duck in the 18th century. Large numbers of horses, cattle and Aylesbury ducks were herded along the roads to London's huge livestock market at Smithfield.Шаблон:Sfn The strain placed on the roads by bulk livestock movements led to the introduction of a network of high quality toll roads in the area in the 18th century.Шаблон:Sfn[note 1] The roads crossing the Chilterns followed the valley of the River Misbourne through Amersham or the River Bulbourne through Berkhamsted. These roads greatly improved travel in the area, reducing the journey time from Aylesbury to Oxford or London to a single day.Шаблон:Sfn

Between 1793 and 1800 the Grand Junction Canal was built, connecting London to the Midlands. The canal followed the course of the River Bulbourne through the Chilterns, and included a branch to Aylesbury.Шаблон:Sfn For the first time the coal and industrial products of northern England and London could be cheaply supplied to Buckinghamshire, and grain and timber from Buckinghamshire's farms could easily be shipped to market.Шаблон:Sfn The route taken by the Grand Junction Canal ran through the east of the county, leaving the Chiltern towns of southern Buckinghamshire isolated. When Robert Stephenson's London and Birmingham Railway opened in 1838 it paralleled the route of the canal through Buckinghamshire. Although the short 1839 Aylesbury Railway linked Aylesbury to the London and Birmingham Railway, the rest of central Buckinghamshire remained unconnected to the railway and canal networks.Шаблон:Sfn

Early Chesham railway schemes

Файл:Buckinghamshire railways, 1880.png
Railways in the Chilterns, 1880. The villages of Amersham and Chalfont St Giles and the important market town of Chesham had been left isolated, and the only routes between London and the county town of Aylesbury involved long detours to the south or east.[note 2]

The Chiltern market town of Chesham Шаблон:IPAc-en had historically been an important manufacturing centre. In 1853 the town held three flour mills, three sawmills, three breweries, two paper mills and a silk mill, while of the town's 6,000 inhabitants 30 were recognised as master manufacturers.Шаблон:Sfn However, the local economy suffered badly from a lack of connections to the new transport networks. In the 1840s coal cost almost three times more to buy in Chesham than to buy in Berkhamsted,Шаблон:Sfn[note 3] and it took over 2Шаблон:Frac hours for passengers to travel by road from Chesham to the most convenient railway station at Watford.Шаблон:Sfn

Between 1845, the height of the railway bubble, and the 1880s numerous schemes were put forward for railways to Chesham. The most significant was an 1845 scheme for an orbital railway bypassing London to connect the railways entering London from the north, west and south; this route was to pass through Chesham.Шаблон:SfnШаблон:Sfn The scheme was abandoned,Шаблон:Sfn as was an 1853 proposal by railway entrepreneur and former Member of Parliament for Buckingham Harry Verney for a railway line from Watford to Wendover via Rickmansworth and Amersham (around two miles (3 km) from Chesham).Шаблон:Sfn Robert Grosvenor, 1st Baron Ebury, whose Watford and Rickmansworth Railway had opened in 1862, proposed extensions from Rickmansworth to Chesham and Aylesbury, but failed to attract funding and abandoned the scheme.Шаблон:SfnШаблон:Sfn To the north of Chesham, the London and North Western Railway (LNWR) promoted a railway link between the Great Northern Railway station at Harpenden and the LNWR's station at Boxmoor, which would run on to terminate at Chesham.Шаблон:Sfn The LNWR baulked at the cost of the earthworks necessary to reach Chesham and the southern stage of the proposal was abandoned; the line between Harpenden and Boxmoor eventually opened in 1877.Шаблон:Sfn (The Harpenden–Boxmoor section was never completed; trains to Boxmoor terminated nearby at Heath Park Halt, and passengers to and from Boxmoor had to complete their journey by horse or horse-drawn bus.Шаблон:Sfn) In 1887 a Шаблон:Track gauge tramway was proposed, which was to run through the streets of Chesham and on to Boxmoor, but the proposal was abandoned owing to a lack of funds and opposition from the operators of toll roads around Boxmoor.Шаблон:SfnШаблон:Sfn[note 4]

Metropolitan Railway Chiltern schemes

Шаблон:Main article In 1837 Euston railway station opened, the first railway station connecting London with the industrial heartlands of the West Midlands and Lancashire.Шаблон:Sfn Railways were banned by a Parliamentary commission from operating in London itself, and thus the station was built on what was then the northern boundary of the city.Шаблон:Sfn Other main line termini north of London soon followed at Paddington (1838), Bishopsgate (1840), Fenchurch Street (1841), King's Cross (1852) and St Pancras (1868). All were built outside the built-up area of the city, making them inconvenient to reach.Шаблон:Sfn[note 5] Charles Pearson (1793–1862) had proposed the idea of an underground railway connecting the City of London with the relatively distant London main line rail termini in around 1840.Шаблон:Sfn In 1854 to promote the scheme he commissioned the first ever traffic survey, determining that each day 200,000 walked into the City of London, 44,000 travelled by omnibus, and 26,000 travelled in private carriages.Шаблон:Sfn A Parliamentary Commission backed Pearson's proposal over other schemes.Шаблон:Sfn

Despite concerns about vibrations causing subsidence of nearby buildings,Шаблон:Sfn the problems of compensating the many thousands of people whose homes were destroyed during the digging of the tunnel,Шаблон:Sfn and fears that the tunnelling might accidentally break through into Hell,Шаблон:Sfn[note 6] construction began in 1860.Шаблон:Sfn The new railway was built beneath the existing New Road, running from the Great Western Railway's terminus at Paddington to Farringdon and the meat market of Smithfield.Шаблон:Sfn On 9 January 1863 the line opened as the Metropolitan Railway (MR), the world's first underground passenger railway.Шаблон:Sfn The MR was successful and grew steadily, extending its own services and acquiring other local railways in the areas north and west of London.Шаблон:Sfn

In 1872 Edward Watkin (1819–1901) was appointed as the Metropolitan Railway's Chairman.Шаблон:Sfn A director of many railway companies, he had a vision of unifying a string of railway companies to create a single route running from Manchester via London to an intended Channel Tunnel and on to France.Шаблон:Sfn[note 7] In 1873 Watkin entered negotiations to take control of the Aylesbury and Buckingham Railway and a section of the former Buckinghamshire Railway running north from Verney Junction to Buckingham.Шаблон:Sfn He planned to extend the MR north from London to Aylesbury to join the existing lines and create a direct route from London to the north of England.Шаблон:Sfn He also proposed to extend a short rail branch which ran from the Aylesbury and Buckingham Railway to the small town of Brill, known as the Brill Tramway, southwest to Oxford, and thus create a through route from London to Oxford.Шаблон:Sfn Rail services between Oxford and London at this time were poor, and although still an extremely roundabout route, had the scheme been completed it would have formed the shortest route from London to Oxford, Aylesbury, Buckingham and Stratford upon Avon.Шаблон:Sfn The Duke of Buckingham, chairman of the Aylesbury and Buckingham Railway and owner of the Brill Tramway, was enthusiastic, and authorisation for the scheme was sought from Parliament. Parliament did not share the enthusiasm of Watkin and the Duke, and in 1875 the Buckinghamshire and Northamptonshire Union Railway Bill was rejected.Шаблон:Sfn

Watkin did, however, obtain consent to extend the MR to Harrow, roughly Шаблон:Convert northwest of London, an extension which opened in 1880.Шаблон:Sfn The Harrow line was further extended to Rickmansworth in 1887.Шаблон:Sfn Rickmansworth at this time was a small town with a population of only 1,800; to generate passenger traffic for the new station, a horse bus service between Chesham and Rickmansworth opened on 1 September 1887.Шаблон:Sfn

1885 LNWR junction scheme

Файл:MR Rickmansworth-Chesham-LNWR extension scheme.png
Watkin's 1885 proposal for a link between Rickmansworth and the LNWR, running slightly east of Chesham.[note 2]

Watkin continued to harbour ambitions of linking his railway companies in the north and south of England, and while the construction of the Rickmansworth extension was underway planned two possible routes north from Rickmansworth across the Chilterns.Шаблон:Sfn One proposal envisaged the MR taking over or reaching agreement with the Aylesbury and Buckingham Railway, building a link between Rickmansworth and Aylesbury, and running over the A&B's line to the north. The A&B had close relations with the Great Western Railway, with whom they shared a station at Aylesbury. Watkin felt it possible that the A&B would reach agreement with the GWR instead and not cooperate with the MR.Шаблон:Sfn

In anticipation of the A&B refusing to cooperate, a tentative agreement was reached with the London and North Western Railway, with whom Watkin was on good terms, for the MR to build a route via Chesham to connect to LNWR mainline.Шаблон:Sfn This scheme would provide the LNWR with an alternative route into London when necessary, while providing Watkin with his long-sought connection to the north.Шаблон:Sfn The land required for an intermediate station near Chalfont St Giles and a line between there and a site outside Chesham was purchased.Шаблон:Sfn Agreement was reached with the LNWR that the costs of building the line would be shared equally by the MR and LNWR in return for the LNWR having running rights to Rickmansworth, and an Act of Parliament authorising the extension was obtained in 1885.Шаблон:Sfn

After the Act of Parliament had been granted, membership of the board of the LNWR changed, and they abandoned their support for the extension.Шаблон:Sfn By this time, the MR had bought most of the land between Rickmansworth and Chesham required for that section of the route.Шаблон:Sfn

1888 Aylesbury extension scheme

Файл:1888 Rickmansworth-Aylesbury scheme.png
Watkin's 1888 proposal to absorb the Aylesbury and Buckingham Railway and link Rickmansworth to Aylesbury.[note 2]

With relations between the MR and the LNWR deteriorating, Watkin turned his attention to the proposal to link to Aylesbury. Negotiations between the A&B and the GWR had broken down, and Watkin seized an opportunity to agree running rights over the A&B's route north from Aylesbury, taking over the line completely in 1891.Шаблон:Sfn In 1888 work began on the extension to Aylesbury.Шаблон:Sfn

While the route to the LNWR via Chesham had been abandoned, much of the land needed for the section south of Chesham had already been bought. As Chesham, with a population in 1882 of 6,500,Шаблон:Sfn was the most significant town in the area through which the MR was building, the MR decided to build the section of line between Chalfont and Chesham as a branch line despite Chesham no longer being on the proposed through route to the north.Шаблон:SfnШаблон:Sfn The planned route to the LNWR would have passed to the east of Chesham, and the proposed site of the station was in Millfields, southwest of the town. (Although the extension to the LNWR was abandoned, the MR continued to buy land between Chesham and Tring for some years afterwards, in anticipation of the scheme being revived.Шаблон:Sfn)

Although work had begun on the Millfields station, including the completion of the station hotel (now the Unicorn pub),Шаблон:Sfn the population of Chesham were unhappy at the station being built such a distance from the town.Шаблон:Sfn With the extension to meet the LNWR abandoned the railway no longer needed to curve away from the town, and a public subscription raised £2,000 fund a 71-chain (1,562-yd; 1,428 m) extension to a site near the town centre.Шаблон:SfnШаблон:Sfn Construction of the branch to Chesham began in late 1887.Шаблон:Sfn

Construction and opening

Файл:Chesham, Amersham and Chalfont stations, 1892.png
Railway lines and station layouts at Chesham, Chalfont and Amersham. The single-track Chesham branch runs parallel to the twin-track London–Aylesbury line out of Chalfont Road (Chalfont & Latimer after 1915), before curving along the Chess Valley to the site of the unbuilt proposed Chesham station, southeast of the town. From here the line twists sharply to run to the station in Chesham town centre.

The extensions from Rickmansworth to Aylesbury and Chesham were designed by Charles Liddell and built by contractor James Firbank.Шаблон:Sfn Rather than follow the valley of the River Chess, which would have been the most convenient route to Chesham, the route out of Rickmansworth was intentionally built on higher ground to reduce the steep climb over the Chilterns towards Aylesbury,Шаблон:SfnШаблон:Sfn and thus rose steadily from Rickmansworth to a hilltop station at Amersham.Шаблон:Sfn At Chalfont Road station (renamed Chalfont & Latimer in 1915) the line to Chesham split from the line to Aylesbury. With a total length of 3 miles 56 chains (3 mi 1,232 yd; 5,955 m), the single-track Chesham branch ran alongside the Aylesbury line for a short distance, before curving down the slope of the Chess Valley at a gradient of around 1 in 66.Шаблон:Sfn Chalk from the railway's cutting along the Chess Valley was used to build an embankment to bring the railway into the town centre.Шаблон:Sfn Bridging the watercress beds of the Chess Valley proved problematic, and the cost of the line exceeded its estimate.Шаблон:Sfn Additional costs were incurred by the laying of temporary track in early 1889 to allow the directors of the MR a trial trip along the route.Шаблон:Sfn

On 15 May 1889 a demonstration train comprising two carriages and two locomotives ran along the newly completed line from Chesham to Rickmansworth, carrying the subscribers who had funded the extension and representatives of the local authorities and School Boards covering the areas through which the new line ran.Шаблон:Sfn (As no Metropolitan Railway train had yet run through to Chesham on the finished line, the train from Chesham to Rickmansworth was drawn by two locomotives belonging to the contractors who had built the line, rather than by MR engines. A third engine ran ahead of the demonstration train to act as a pilot.Шаблон:Sfn) A second train carried the directors of the Metropolitan Railway from London to Rickmansworth, collected those passengers who had ridden the demonstration train from Chesham to Rickmansworth, and continued to Chesham.Шаблон:Sfn

As the line had not yet formally been approved for opening by the Railway Inspectorate, the MR requested that the local authorities not celebrate the event.Шаблон:Sfn However, public interest was high and schools closed for the day. Large crowds gathered around the station and along the line,Шаблон:Sfn and a banner reading "Long looked for, come at last" was hung across Chesham station.Шаблон:Sfn As the train pulled into Chesham, it was greeted by celebratory gunfire as it drew into the town, and a band at the station played See the Conquering Hero Comes.Шаблон:Sfn The party alighted at the newly built Chesham goods depot, which had been decorated as a banqueting hall for the occasion,Шаблон:Sfn and an opening ceremony was conducted outside by Edward Watkin and local dignitary and railway financier Ferdinand de Rothschild before the group entered the goods depot for a celebratory meal.Шаблон:Sfn Watkin gave a speech recollecting George Stephenson's desire, fifty years earlier, to see the first mainline railway built along the route now being taken by the Metropolitan Railway, joked that he hoped the easy access to London would not lead to the rural nature of the area being displaced by "a sudden influx of cockneys", and spoke of his desire to see the connection northwards to the LNWR completed.Шаблон:Sfn

The line was formally inspected by the Railway Inspectorate on 1 July 1889, and the first official service on the line left Chesham for London's Baker Street at 6.55 am on 8 July 1889.Шаблон:Sfn Throughout the day large crowds flocked to Chesham station to watch the trains, and the arrival and departure of each train at Chesham was greeted with peals of the bells of St. Mary's Church.Шаблон:Sfn Over the course of the day 1,500 passengers travelled on the line, and 4,300 used the line in its first week of operations.Шаблон:Sfn[note 8]

Following the opening of the line, 17 trains per weekday ran in each direction at intervals of one hour from around 7 am to around 11 pm.Шаблон:Sfn The initial trains were drawn by Metropolitan Railway A and B Class locomotives.Шаблон:Sfn Most trains stopped at all stations, but a fast trains each morning ran between Chesham and Baker Street, taking 50 minutes from start to finish.Шаблон:Sfn On Sundays, trains again ran at hourly intervals, but only 12 trains per day ran and there was a three-hour gap in services in the morning to allow the railway's staff to attend church.Шаблон:Sfn

The opening of the railway dramatically ended Chesham's isolation. Commuting to London became possible for the first time, as did affordable excursions to the seaside resorts on the south and east coasts.Шаблон:Sfn[note 9] The products of the area's industries and farms could for the first time be shipped cheaply to the markets of London, and London newspapers arrived each morning at 7.28 am, in time for delivery.Шаблон:Sfn

Stations

Long low single storey brick building
Chalfont & Latimer station in 2009

Шаблон:Main article The station at Chalfont Road was built with almost all facilities on the up side (the London-bound platform). As Chalfont St Giles, the largest nearby settlement, was on the other side of the tracks, most passengers travelling to and from the station were obliged to take a lengthy detour from the single exit. A footpath across the tracks was added in 1925, but an approach road giving access to the station from the southern side of the railway line was not built until 1933.Шаблон:Sfn The station had three platforms; one platform in each direction on the London–Aylesbury line, and a bay platform alongside the up platform for trains to Chesham.Шаблон:Sfn A run-around loop was built to allow locomotives reversing in the bay platform always to be at the front of their trains. It was built outside the station, meaning locomotives reversing on the Chesham line were obliged to push their trains out of the station before performing the manoeuvre.Шаблон:Sfn

The station was renamed "Chalfont & Latimer" in 1915,Шаблон:Sfn although station signage was inconsistent and on absorption by London Transport in 1933 its roundel signs read simply "Chalfont".Шаблон:Sfn Increased passenger numbers strained the station's minimal facilities, and it was eventually redeveloped with extended shelters and improved waiting rooms in 1927.Шаблон:Sfn The platforms were extended during the electrification works of 1957–60.Шаблон:Sfn

single storey yellow brick building
The modest station building at Chesham, built to one side of the line to allow potential extension

The Metropolitan Railway Act 1885 had given Watkin permission to extend the line from Chesham to connect with the LNWR at Tring.Шаблон:SfnШаблон:Sfn Thus, although it was the terminus of the line, Chesham station was designed with a revival of the LNWR extension scheme in mind. The small station building was set to one side of the tracks to allow for a possible extension onwards.Шаблон:Sfn The station had a single platform, with a run-around loop and turntable alongside, together with a coaling station and water tank.Шаблон:Sfn[note 10] The station was lit by gas light until 1925; the local gas works, which consumed around 5,000 tons of coal each year,Шаблон:Sfn threatened to withdraw their coal traffic from the line if the station were fitted with electric lighting.Шаблон:Sfn While Chalfont Road station initially served a sparsely populated rural area (the village of Little Chalfont had not yet grown around the station), Chesham station was busy, and at the time of its opening had a full staff of a stationmaster, two ticket inspectors, two clerks, two porters and two collectors.Шаблон:Sfn

Chesham also had extensive goods facilities, particularly for coal; the goods yard was initially equipped with a mobile 5-ton crane, replaced by a fixed 8-ton crane between 1898 and 1900.Шаблон:Sfn The outward transport of watercress, a major local industry, also generated significant traffic.Шаблон:Sfn During the electrification of the line in 1957–60 the station was equipped with a bay platform for passenger trains, to allow it to accommodate both through services to and from Baker Street and the Chalfont & Latimer–Chesham shuttle simultaneously.Шаблон:Sfn This bay platform was closed on 29 November 1970 and is now a garden.Шаблон:Sfn

Railway station platform with a garden on one side and railway tracks on the other
The disused bay platform (left) and surviving original platform (right) at Chesham. The large brick structure is the former water tower from the days of steam operations.

The Metropolitan Railway's passenger coaches, dating from 1870 and designed for underground use within London, were not fitted with heating until 1895. Consequently, both stations were also equipped with equipment for heating footwarmers, which would be distributed to passengers during cold weather.Шаблон:Sfn

Opening of the Aylesbury line

As developments on the line from Chalfont Road to Chesham took place, progress continued on the Шаблон:Convert cross-Chiltern link between Chalfont and Aylesbury.Шаблон:Sfn On 1 September 1892 work was completed as far as a temporary station south of Aylesbury.Шаблон:Sfn (The connection with the Aylesbury and Buckingham Railway—absorbed by the Metropolitan Railway in 1891—was completed in late 1893. From 1 January 1894 MR trains used the A&BR's Aylesbury station, and the temporary station was abandoned.[1]) The line to Chesham became a branch line, generally operated by a shuttle service between Chalfont Road and Chesham, although some trains at peak periods continued to run between London and Chesham.Шаблон:Sfn The MR had bought a number of Metropolitan Railway C Class locomotives to replace the ageing A and B class engines, but these performed poorly on the London-Aylesbury line and were soon replaced by the Metropolitan Railway D Class. As a consequence, the C class engines were often used on the Chesham shuttle services.Шаблон:Sfn

While construction of the Chesham and Aylesbury lines was underway Watkin continued to press for the extension from Chesham to the LNWR, as did prominent manufacturers in Chesham.Шаблон:Sfn However, construction of the extensions had left the MR seriously exposed financially, forcing the board to cut dividends in July 1889.Шаблон:Sfn At a Special General Meeting on 12 February 1890 matters came to a head. Shareholders endorsed the decision to acquire the Aylesbury and Buckingham Railway and authorised the MR to acquire the moribund Brill Tramway, which connected with the A&BR at Quainton Road station, but blocked the expensive extension beyond Chesham, as well as Watkin's proposed extension to Moreton Pinkney to the north.Шаблон:Sfn (Watkin's Manchester, Sheffield and Lincolnshire Railway was refused consent at the time to build south to connect with the MR at Moreton Pinkney, which would have rendered the Moreton Pinkney branch an inevitably loss-making branch line serving a very lightly populated area. Watkin was determined to build this section as a vital segment in his vision of a London–Manchester railway, and proposed that if the MR would not build this section, the Manchester, Sheffield and Lincolnshire Railway would build the line themselves and lease it to the MR. The MR board refused to have anything to do with the scheme. Moreton Pinkney was eventually served by Watkin's railway network in 1899 as Culworth railway station on the Great Central Railway.Шаблон:Sfn)

In 1894 Edward Watkin suffered a stroke. Although he nominally remained a director of his railway companies, he resigned all his railway chairmanships and his influence was effectively ended.Шаблон:Sfn With the connection at Aylesbury complete, the Metropolitan Railway reached Шаблон:Convert northwest of London, and his planned route between London and northern England was almost complete. Watkin's Manchester, Sheffield and Lincolnshire Railway continued to build southwards from its southernmost point at Annesley, reaching Quainton Road station on the former A&BR in 1899 and completing the north–south link, the Great Central Railway (GCR),Шаблон:Sfn[2] in time for Watkin to see his vision completed before his death in 1901.Шаблон:Sfn

Relations with the Great Central Railway

Шаблон:Main article

Файл:Central Buckinghamshire railways, 1906.png
Railways in the Chilterns at their greatest extent, 1906–1935. The Metropolitan Railway (purple) had completed their scheme to connect to London and Aylesbury, leaving the route via Chesham to the LNWR uncompleted as a branch line terminating at Chesham. The Aylesbury and Buckingham railway to Verney Junction and the short Brill Tramway had also been absorbed by the MR. Edward Watkin's vision of a direct route from London to Manchester was completed in 1899, but the collapse of relations between the MR and the new Great Central Railway (orange) led to the GCR creating the Alternative Route, bypassing MR lines (including the interchange with the Chesham branch) altogether.[note 2]

After Watkin's retirement from management, relations between the MR and GCR deteriorated rapidly over shared use of Baker Street station and the congested route into London, and soon broke down completely. On 30 July 1898 John Bell, General Manager of the Metropolitan Railway, took control of the Quainton Road signal box himself and refused to allow a GCR train onto MR-owned tracks on the grounds that it was scheduled to take the Great Western rather than the Metropolitan route south of Aylesbury,Шаблон:Sfn while on one occasion in 1901 King Edward VII was travelling home after visiting a friend in Wendover; the MR signalman allowed a slow goods train to run in front of the royal train, causing the King to arrive late back in London.Шаблон:Sfn The MR management also refused the GCR permission to install points to connect their engine shed at Aylesbury to the railway line, on the grounds that the land for the shed had been bought clandestinely.Шаблон:Sfn Eventually a parallel set of tracks was built for the GCR between Harrow and London, running alongside the MR to a separate terminus at Marylebone, a short distance from Baker Street.Шаблон:Sfn The GCR continued to share the less-congested section between Quainton Road and Harrow—including Chalfont Road station—with the MR.Шаблон:Sfn

With the hostile Metropolitan Railway controlling the GCR's only approach to London through Quainton Road and Aylesbury, GCR General Manager William Pollitt decided to create a link with the Great Western Railway to create a second route into London which bypassed all MR property.Шаблон:Sfn In 1899 the Great Western and Great Central Joint Railway began construction of a new line, commonly known as the Alternative Route, to link the GWR's existing station at Princes Risborough to the new Great Central line. The line ran from Princes Risborough north to meet the Great Central at Grendon Underwood, about three miles (5 km) north of Quainton Road, thus bypassing Quainton Road altogether.Шаблон:Sfn[3] Although formally an independent company, in practice the new line was operated as a part of the Great Central Railway.Шаблон:Sfn The new route opened in 1906,Шаблон:Sfn and a substantial part of the GCR's traffic to and from London was diverted onto the Alternative Route, damaging the profitability of the MR's railway operations.[4][note 11]

The MR management were horrified at the potential loss of income and restarted negotiations with the GCR, and a 1906 agreement meant that GCR traffic was shared between the old and new routes.Шаблон:Sfn Management of the shared route north of Harrow alternated every five years between the MR and GCR. (A proposed link between Marylebone and the sub-surface section of the Metropolitan Railway, which would have allowed GCR trains to run across London via the MR-controlled Thames Tunnel and on to the south coast, was abandoned.Шаблон:Sfn) The sharing arrangement meant through trains running from Chesham to Marylebone, as well as the MR terminus at Baker Street, and that the branch was worked by GCR trains as well as the ageing MR rolling stock.Шаблон:Sfn

Chesham and Metro-land

In 1903 Robert Selbie was appointed Secretary of the Metropolitan Railway, working on the electrification of the London sections of the line; by 1905 the route was electrified as far as Harrow, although the sections north of Harrow, including the Chesham branch, continued to be worked by steam power.Шаблон:Sfn In 1908 he was appointed General Manager, a position he was to hold until 1930.Шаблон:Sfn Selbie realised that Watkin's schemes and the expensive electrification project had left the company with major financial liabilities, and that the MR's core business in central London would come under significant pressure as the use of automobiles increased and as the new Underground Electric Railways of London tube lines improved their services. Selbie set out to reshape the MR as a feeder route for goods and passengers into London.Шаблон:Sfn

New branches to Uxbridge, Watford and Stanmore were built, and from 1915 the extremely effective Metro-land advertising campaign began, promoting the lightly developed areas along the MR's routes as ideal for commuting to London.Шаблон:SfnШаблон:Sfn Watkin's expansionist schemes had led to the acquisition of huge tracts of near-worthless land in the Buckinghamshire countryside around the MR's routes, as the MR had tried to take control of as much land as possible along every possible route between London and Manchester. With the GCR complete it was no longer necessary for the MR to keep these lands clear for potential railway use, and Selbie began development on a massive scale.Шаблон:Sfn By 1939 over 4,600 houses had been built by the MR alone, and entire new towns had grown around the MR's stations between Harrow and Aylesbury. This development not only generated huge amounts of money from property development, but vastly increased use of the railway for passenger and goods traffic.Шаблон:Sfn The MR's Baker Street terminus was also redeveloped and a block of 180 luxury apartments known as Chiltern Court was built above the station.Шаблон:SfnШаблон:Sfn[note 12] With the profits generated, the line was further electrified to Rickmansworth. Again, the Chesham branch was not electrified and remained operated by steam locomotives; the electric locomotives would be uncoupled from their trains at Rickmansworth and a steam locomotive would haul the train to Chesham.Шаблон:Sfn By this time, the steam sections of the route were generally worked by the powerful Metropolitan Railway H Class engines, capable of speeds of up to Шаблон:Convert.Шаблон:Sfn

Purple steam locomotive
A Metropolitan Railway A Class locomotive of the type used on the line at the time of its opening

Selbie also made a conscious effort to attract the wealthy classes to the railway. Stations such as Sandy Lodge (now Moor Park) were built to serve golf courses and hunts along the route, and horse-vans were provided at stations serving hunts and point to points.Шаблон:Sfn Two Pullman cars were introduced in 1909 on selected services between the City of London and Chesham, Aylesbury and Verney Junction for the benefit of businessmen travelling to work and theatregoers returning from London.Шаблон:Sfn[note 13]

Despite the huge population growth in southern Buckinghamshire caused by the railway, Chesham remained relatively unaffected by development. Although there was extensive development in Chesham Bois, roughly halfway between Chesham and Amersham,Шаблон:SfnШаблон:Sfn between 1889 and 1925 the population of Chesham itself grew by less than 2,000, and between 1925 and 1935—the peak of the Metro-land boom—by only 225.Шаблон:Sfn Between 1921 and 1928 the season ticket revenue from Amersham and Chalfont & Latimer stations rose by 134%; that from Chesham by only 6.7%.Шаблон:Sfn[note 14] Although the MR owned large tracts of land around Chesham, bought in anticipation of a revival of the LNWR connection scheme, Selbie chose not to build a housing estate on the site, instead selling much of it to the local council.Шаблон:Sfn By this time, service on the Chesham branch was of a relatively poor quality. Improvements to the central London section and the prioritisation of the Aylesbury line had led to ageing surplus stock often being used on the Chesham branch, and the partial electrification caused delays at Rickmansworth as steam locomotives were coupled and uncoupled.Шаблон:Sfn As the branch was mainly operated as a shuttle service passengers to and from Chesham were obliged to wait at Chalfont & Latimer station. This had been built to serve a lightly populated area, but the Metro-land development had caused a much larger number of users than it had been designed for, and it had few waiting facilities, poor lighting, inadequate shelter, and dirty toilets.Шаблон:Sfn As Amersham grew, more and more of the trains which had previously run direct from London to Chesham instead ran to Amersham, causing further crowding as passengers waited for the shuttle service at Chalfont & Latimer.Шаблон:Sfn Improving road transport caused an increasing number of commuters to abandon the Chesham line, which in turn prompted the MR to further reduce passenger services.Шаблон:Sfn

1909 accidents

Although the short line to Chesham generally had a good safety record, despite its sharp curves and relatively steep gradient, it suffered two significant accidents in this period. On 19 August 1909 the A class engine hauling the 7.53 am train from Chesham broke an axle and derailed outside Chesham. There were no injuries but the track was blocked; a passenger service was maintained by operating shuttle services from each end of the branch to the crash site, where passengers were obliged to walk around the derailed engine to change trains.Шаблон:Sfn On 6 November 1909 a backdraught from a locomotive firebox enveloped Robert Prior, the train's driver, in flames.Шаблон:Sfn (The type of locomotive is not recorded, but it is likely to have been a Metropolitan Railway D Class, which are known to have had a problem with backdraughts.Шаблон:Sfn) The locomotive's fireman managed to drive the train to Chesham, where Prior died from his injuries two days later.Шаблон:Sfn An inquest found that Prior had failed to turn on the blower, and a verdict of accidental death was recorded.Шаблон:Sfn

London Transport

Robert Selbie had fought vigorously for the independence of the Metropolitan Railway, and had successfully preserved the MR's independence during the grouping of 1923, which had merged almost all of Britain's railways into four companies. However, on 17 May 1930 he died suddenly, and his successors acceded to pressure from the Ministry of Transport to merge with London's other underground railways.Шаблон:Sfn On 1 July 1933 the merger brought all of London's underground railways aside from the short Waterloo & City Railway, under public ownership as part of the newly formed London Passenger Transport Board (LPTB). The Metropolitan Railway became the Metropolitan line of the London Underground.Шаблон:Sfn

Frank Pick, Managing Director of the Underground Group from 1928 and the Chief Executive of the LPTB, aimed to move the network away from freight services, and to concentrate on the electrification and improvement of the core routes in London.Шаблон:Sfn In particular, he saw the lines beyond Aylesbury via Quainton Road to Brill and Verney Junction as having little future as financially viable passenger routes.Шаблон:Sfn On 30 November 1935 the last train ran on the Brill Tramway between Brill and Quainton Road,Шаблон:Sfn and at the stroke of midnight, the rails connecting the Tramway to the main line were ceremonially severed.Шаблон:Sfn The former Aylesbury and Buckingham Railway between Quainton Road and Verney Junction was closed to passengers on 6 July 1936,Шаблон:Sfn and London Transport services north of Aylesbury were withdrawn.Шаблон:Sfn[note 15]

London and North Eastern Railway operation

The route to Aylesbury and the Chesham branch survived Pick's cutbacks to the Metropolitan line, but the former Metropolitan Railway's routes in Buckinghamshire, and in particular the Chesham line, were increasingly regarded as an expensive anomaly by London Transport.Шаблон:Sfn After 1937 the operation of all steam services north of Rickmansworth was passed to the London & North Eastern Railway (LNER).Шаблон:Sfn The LNER retained Metropolitan Railway E Class locomotives to work the Chesham branch, but other steam services on the former MR were operated by LNER N5 Class locomotives.Шаблон:Sfn

Large purple steam locomotive
A Metropolitan Railway E Class locomotive, of the type used on the Chesham branch during LNER operation

The LNER did not want to take full responsibility for the line, and although they provided the services, ownership remained with the LPTB. In 1935 the LPTB, seeking to abandon steam power as much as possible, drew up a scheme to include electrification of the Amersham line as part of the New Works Programme.Шаблон:Sfn It was not planned to electrify the Chesham branch; instead, a diesel-powered GWR railcar was borrowed from the GWR for trials on the branch.Шаблон:SfnШаблон:Sfn Although the railcar performed well on the curves and slopes of the branch, the railcar had a capacity for only 70 passengers and was only able to haul light amounts of goods.Шаблон:Sfn The LPTB commissioned its own, larger, railcar design, but by the end of 1936, it decided instead to electrify the Chesham branch, and the railcar schemes were abandoned.Шаблон:SfnШаблон:Sfn The LPTB's plan envisaged electric trains splitting at Chalfont & Latimer, with half of each train continuing to Amersham and half to Chesham.Шаблон:Sfn

Long wooden railway carriage
One of the passenger cars built in 1898 and used on the Chesham branch between 1940 and 1960

Although some preparatory work was carried out, the outbreak of the Second World War in 1939 brought the electrification north of Rickmansworth to a halt.Шаблон:Sfn First class travel was abandoned by the LPTB,Шаблон:Sfn along with the Pullman cars,Шаблон:Sfn and the line was operated entirely as a shuttle service.Шаблон:Sfn In 1940 the Chesham branch was converted to autotrain working, in which the trains could be driven from each end, thus avoiding the time-consuming repositioning of the locomotive.Шаблон:SfnШаблон:Sfn LNER C13 Class locomotives were used for this push-pull working, along with two three-car sets of antiquated Ashbury passenger cars dating from 1898.Шаблон:Sfn

Nationalisation

On 1 January 1948, almost all railways in Britain—including the London Transport Passenger Board and the London and North Eastern Railway—were nationalised under the Transport Act 1947.Шаблон:Sfn The LPTB became the London Transport Executive (LT), and the LNER became a part of British Railways.Шаблон:Sfn In the Greater London Plan of 1944 Sir Patrick Abercrombie had strongly recommended a halt to further modern development in Chesham and along the Chess Valley to preserve the sensitive local environment, and there was thus little prospect for growth in passenger numbers on the branch.Шаблон:Sfn

For the first decade after nationalisation services to Chesham continued much as before, although the unification of the mainline companies meant a wider variety of locomotives operating services on the branch.Шаблон:Sfn For two weeks from 13 October 1952 LT experimented with a three-car lightweight diesel train on the route, but the train used had difficulty negotiating the line's sharp bends and the branch reverted to steam operations.Шаблон:SfnШаблон:Sfn

Large dark steam locomotive at a railway station platform, with a steep earth bank behind it
A GCR Class 9K locomotive at Chesham station in 1957, during the final years of steam operations

By the mid-1950s, British Railways had begun to operate in regional units, and responsibility for services on the former Great Central routes in the Chilterns was transferred to the London Midland Region. Services on the branch were generally hauled by LMS Ivatt Class locomotives, although passenger trains continued to use the 1898 Ashbury cars.Шаблон:Sfn British Railways continued to operate goods services on the branch, although these declined steadily owing to competition from road haulage to the point at which coal deliveries were the only significant business.Шаблон:Sfn

By now the pre-war electrification scheme had been revived.Шаблон:Sfn In 1957 electrification between Rickmansworth and Amersham and Chesham began.Шаблон:Sfn Chalfont & Latimer's platforms were extended and a second platform was opened at Chesham on 3 July 1960 to prevent through operations to and from Baker Street from interfering with the Chesham–Chalfont & Latimer shuttle.Шаблон:SfnШаблон:Sfn An electric service using London Underground T Stock began operations between Chesham and Chalfont & Latimer on 16 August 1960, with former MR electric locomotives hauling the through trains to and from London.Шаблон:Sfn A steam locomotive was kept on standby in the new second platform at Chesham, in case of a failure of the electric trains.Шаблон:Sfn From June 1962 both the T Stock and the locomotive-hauled trains were replaced by the newly introduced London Underground A Stock.Шаблон:Sfn

Two electric multiple unit trains with large windows
London Underground A Stock trains in their original livery, as they appeared at their introduction in 1960

The last scheduled London Transport steam passenger train on the branch left Chesham at 12.11 am on 12 September 1960.Шаблон:Sfn 1,917 passengers used the line that day, in comparison with a typical Sunday usage of around 100.Шаблон:Sfn Earlier on 11 September descendants of the Chesham residents who had attended Watkin's original meeting to promote the railway, along with 86-year-old Albert Wilcox who had been present at the opening of the line, rode the steam shuttle to Chalfont & Latimer and back, and attended a ceremony in Chesham's Council Chamber.Шаблон:Sfn (Although the 12.11 am service from Chesham on 12 September 1960 was the last scheduled London Transport steam service to use the line, a steam train left Marylebone for Chesham each morning at 3.55 am to deliver newspapers, returning as the first passenger train from Chesham at 5.58 am.Шаблон:Sfn This journey to Marylebone was open to the public but was unadvertised and did not appear in published timetables.Шаблон:Sfn This arrangement continued to be operated by steam locomotive until 18 June 1962.Шаблон:Sfn) The Ashbury passenger cars, which by now had each covered around Шаблон:Convert, were retired from service.Шаблон:Sfn[note 16] The last steam-powered passenger services on the remaining non-electrified section between Amersham and Aylesbury ran on 9 September 1961.Шаблон:Sfn The line between Amersham and Aylesbury was handed over to British Rail, leaving Chesham as the westernmost point of the London Underground network.Шаблон:Sfn The goods yard at Chesham was closed in 1966,[note 17] and a train hauled by a former GWR 5700 Class locomotive removed the track from the goods yard, the last steam service to use the line.Шаблон:Sfn On 17 October 1967 the newspaper train service and its return journey to Marylebone, by this time worked by a British Rail diesel multiple unit, was abandoned, leaving the branch exclusively operated by London Transport trains.Шаблон:Sfn[note 18]

Closure proposals

Although LT had hoped that the electrification would boost revenue, the Chesham branch generated little income.Шаблон:Sfn In a period of recession LT was reluctant to continue subsidising a little-used branch line some distance outside its core area.Шаблон:Sfn Fares were drastically increased in 1970, leaving a monthly season ticket from Chesham to Baker Street costing £43 (about £Шаблон:Inflation in 2024).Шаблон:SfnШаблон:Inflation-fn London Transport considered closing the branch, but it survived thanks to subsidies from the Ministry of Transport, Buckinghamshire County Council and the Greater London Council.Шаблон:Sfn Sunday services on the branch were abolished as a cost-cutting measure, although this decision was reversed following protests.Шаблон:Sfn

In 1982 the future of the Chesham line came into serious question, as it became clear that the two bridges carrying the line into Chesham were deteriorating badly and that, unless the bridges were replaced, the branch could not continue to operate after 1986.Шаблон:Sfn By this time rail services in Buckinghamshire had been drastically cut back under the Beeching Axe mass rail closure programme of the 1960s.Шаблон:Sfn The last passenger trains north of Aylesbury had run on 5 September 1966,Шаблон:SfnШаблон:Sfn The Greater London Council was scheduled for abolition, bringing their subsidy of the Chesham branch to an end.Шаблон:Sfn Buckinghamshire County Council was unwilling to pay for replacing the bridges, proposing instead that the station be relocated to the original proposed station site of the 1880s on the south side of the bridges.Шаблон:Sfn Safety concerns had led to a speed limit of Шаблон:Convert over the bridges, and the line appeared certain to be closed.Шаблон:Sfn

Revival

Although no part of the Chesham branch was in Greater London, the Greater London Council, as one of its last acts, granted £1,180,000 to replace the bridges. New bridges were built alongside the existing bridges to minimise disruption, and were rolled into place on 24 March 1986 and 14 April 1986.Шаблон:Sfn

In 1989 the centenary of the branch saw a revival of interest in the line. Over the weekends of 1–2 and 8–9 July special services were run between Watford and Chesham, using two preserved Metropolitan Railway steam locomotives and a former MR electric locomotive.Шаблон:SfnШаблон:Sfn The service was a great success, with over 9,000 people travelling on the trains and large numbers of people travelling to the area to watch the trains.Шаблон:Sfn The success prompted LT to repeat the Steam on the Met event annually until 2000, although often running to Amersham rather than Chesham.Шаблон:Sfn

In the early 1990s the number of passengers using the branch stabilised at about 800 people each weekday.Шаблон:Sfn In 2009 the Chesham branch saw 427,000 journeys each year.[6][note 19] The proposal to close the Aylesbury–Marylebone route was dropped, and instead the line was upgraded and equipped with fast British Rail Class 165 trains in the early 1990s. These reduced the travel time between Chalfont & Latimer and Marylebone to 33 minutes, increasing usage of the line as a commuter route.Шаблон:Sfn The Chesham branch was proposed as a terminus for the original Crossrail scheme, which would have seen Crossrail trains running from Paddington to serve the stations between Rickmansworth and Aylesbury and the Chesham branch, allowing London Transport to withdraw from Buckinghamshire and cut the Metropolitan line back to serve only the branches to Watford and Uxbridge.Шаблон:Sfn The bill proposing the scheme was defeated in Parliament and abandoned in 1995,Шаблон:Sfn and the revived scheme authorised by the Crossrail Act 2008 did not include the branches to Aylesbury and Chesham.[7] By this time the little-used Central line branch from Epping to Ongar had closed, with the last services running on 30 September 1994, leaving Chesham—already the westernmost point of the London Underground network since 1961's withdrawal from Aylesbury—as the northernmost point on the London Underground.Шаблон:Sfn

By the time London Underground operations were transferred to the newly created Transport for London (TfL) in 2000, the A Stock trains were already 40 years old. The C Stock trains used on the Circle line, Hammersmith & City line and sections of the District line and the D Stock used on the remainder of the District line were also ageing, and no plans were in place for their replacement.Шаблон:Sfn Following lengthy and expensive negotiations, an order was placed in 2003 with Bombardier Transportation for a fleet of new trains to take over all operations on the Metropolitan, Circle, Hammersmith & City and District lines.Шаблон:Sfn

Restoration of full through service

Шаблон:Multiple image

The eight-car configuration of the S Stock design includes open connections between the passenger cars, and thus cannot be split into shorter four-car trains capable of fitting into the bay platform at Chalfont & Latimer station. Consequently, in 2008 TfL announced that the shuttle service was to be abandoned.Шаблон:Sfn Instead, the long-standing Metropolitan line service of four trains per hour to and from Amersham was to be reduced to two, with the other two services running as through trains between Aldgate and Chesham.Шаблон:Sfn After 118 years of service on 11 December 2010 at 12.37 pm the last Chesham shuttle service left Chesham station. A Stock trains continued to run on the line, providing through services to London, until 29 September 2012 when they were retired and replaced by S8 Stock trains.[8]

Notes and references

Notes

Шаблон:Reflist

References

Шаблон:Reflist

Bibliography

Шаблон:Refbegin

Шаблон:Refend

Further reading

Шаблон:Refbegin

Шаблон:Refend

Шаблон:Metropolitan line navbox Шаблон:Railway stations in Buckinghamshire

Шаблон:Coord Шаблон:Good article


Ошибка цитирования Для существующих тегов <ref> группы «note» не найдено соответствующего тега <references group="note"/>

  1. Шаблон:Cite book
  2. Шаблон:Cite news
  3. Шаблон:Cite newspaper (subscription required)
  4. 4,0 4,1 Шаблон:Cite news
  5. Шаблон:Cite news
  6. 6,0 6,1 Ошибка цитирования Неверный тег <ref>; для сносок Usage не указан текст
  7. Шаблон:Cite web
  8. Шаблон:Cite web