Английская Википедия:Fitchburg Cutoff
Шаблон:Good article Шаблон:Short description Шаблон:Use mdy dates Шаблон:Infobox rail line
The Fitchburg Cutoff (also called the Freight Cutoff) was a rail line running Шаблон:Convert from Brighton Street (Hills Crossing station) in Belmont, Massachusetts, to Somerville Junction in Somerville, Massachusetts. It was constructed in two segments in 1870 and 1881 to connect the Lexington Branch and Central Massachusetts Railroad to the Boston and Lowell Railroad. Passenger service lasted until 1927. Freight service ended in 1979–80 to allow construction of the Red Line Northwest Extension; the line was abandoned in three sections in 1979, 1983, and 2007.
All of the right-of-way, except a short section near Alewife station, has been reused for three connecting rail trails: the Fitchburg Cutoff Path from Brighton Street to Alewife station, the Alewife Linear Park from Alewife to Massachusetts Avenue, and the Somerville Community Path east of Massachusetts Avenue. The paths are part of the Mass Central Rail Trail.
Route
The line was Шаблон:Convert long, running approximately east–west.[1][2]Шаблон:Rp The west end connected to the Central Massachusetts Branch at Hill Crossing station at Brighton Street in Belmont, parallel to the Fitchburg Division main line (now the MBTA Fitchburg Line). It crossed the Lexington Branch (after 1927) at grade in West Cambridge and crossed under Alewife Brook Parkway, with the pre-1927 connection to the Lexington Branch near Jackson Street. The line crossed Massachusetts Avenue and other streets at grade, then continued into Somerville, where it ran at grade through Davis Square with crossings of Holland Street and College Avenue. It crossed additional streets at grade, then passed under Lowell Street and joined the Southern Division (now the Lowell Line) at Somerville Junction.[3][4][2]Шаблон:Rp After 1887, passenger stations on the line were North Cambridge (also called North Cambridge Junction and North Avenue) at Massachusetts Avenue, West Somerville (Elm Street) at Davis Square, and Somerville Highlands at Highland Road.[1][2]Шаблон:Rp[3][4] Шаблон:Clear left
History
Passenger service
The B&L acquired control of the Lexington and Arlington Railroad (Lexington Branch) in 1869, and purchased it in 1870, to prevent it from building to Lowell and thus becoming a competitor to the B&L. In 1870, the B&L built a cutoff from Шаблон:Bts to Somerville Junction to connect the newly acquired branch to its mainline.[2]Шаблон:Rp (Early plans called for the cutoff to connect to the B&L further north at Willow Bridge station.[5]) Service began on December 1, 1870.[6][7] In January 1876, William Robinson installed one of the first test applications of his track circuit signaling system on the line between Elm Street and North Avenue. On June 14, 1876, Pedro II of Brazil, who was touring the United States, travelled to Elm Street station to view the system.[8][9]
The western section was built in 1881 by the Central Massachusetts Railroad (which paralleled the Fitchburg Railroad west of Brighton Street) to connect to the B&L for access to Boston. It connected to the existing Lexington Branch cutoff near Jackson Street, west of North Cambridge station, and had no stations between Hills Crossing and North Cambridge.[2]Шаблон:Rp Service began on October 1, 1881.[10] The B&L, which controlled the Central Massachusetts, was acquired by the Boston and Maine Railroad (B&M) in 1887. The B&L became the Southern Division mainline, while the Central Massachusetts became a branchline.[2] The original Willow Avenue and Somerville Highlands stations were replaced by a new Somerville Highlands station at Highland Road around 1887.[11][12][13] In 1900, the B&M acquired the Fitchburg Railroad as its Fitchburg Division.[2]
The city of Somerville proposed to eliminate the five grade crossings on the cutoff within its borders, including the pair of College Avenue and Holland Street at Davis Square, in the early 1900s.[14] Most grade crossings on the Fitchburg Division mainline were eliminated over the next decade, but those on the cutoff were not.[15] On January 31, 1915, the West Somerville station building was moved west of Holland Street at the request of the mayor to improve conditions in Davis Square.[16][17]
In 1926–27, the B&M built two new sections of track in North Cambridge; these allowed the Lexington Branch and the Central Massachusetts Branch to use the Fitchburg mainline east of Alewife Brook Parkway.[18] On April 24, 1927, passenger service from the two branches was rerouted over these new sections and the Fitchburg mainline; North Cambridge, West Somerville, and Somerville Highlands stations were closed.[19] Although residents were opposed to the closures, the B&M wished to avoid the grade crossings on the line, which had seen 70 crashes in the previous six years.[20] The old line from Brighton Street to Somerville Junction became the freight-only Freight Cutoff (Fitchburg Cutoff); it was rebuilt with heavier rails to handle heavy freights headed to and from the new Somerville freight yard.[21] In late 1927, an additional main track was built on the Southern Division from Somerville Junction to the yard to reduce the incidence of stopped freight trains blocking crossings on the cutoff.[22]
Rapid transit conversion
Шаблон:Annotated image In the 1920s, the cutoff was considered the most likely route for rapid transit service to Somerville and North Cambridge. (Extension of the Cambridge–Dorchester Line – now the Red Line – north from Harvard station was not considered likely.[23]) The Report on Improved Transportation Facilities, published by the Boston Division of Metropolitan Planning in 1926, proposed extension from Шаблон:Bts to North Cambridge via the Southern Division and the 1870-built cutoff. Among the potential further extensions in the report was extension of the North Cambridge line to Шаблон:Bts via the Lexington Branch.[24][25]
In 1935, the city requested that the line be grade-separated as part of a Works Progress Administration-funded grade crossing elimination program.[26] A proposal that year by a citizen's group called for a rapid transit extension to North Cambridge. A new highway was to run from the Northern Artery over the tracks at street level, then adjacent to the tracks on the lowered cutoff to connect to the existing Mohawk Trail expressway at Alewife Brook Parkway.[27] Neither project was built, and the grade crossings were not eliminated; crashes and stalled freight trains continued to be a problem.[28][29][30] Even decades after regular passenger service ended on the line, it was occasionally used as a detour route when the Fitchburg Route mainline was blocked in Somerville.[31][32]
Various proposals in the 1930s called for rapid transit use of the cutoff; some called for it to be connected to the East Boston Tunnel (now the Blue Line) rather than the Tremont Street subway (now the Green Line).[33][34][35] The 1945 and 1947 reports by the state Coolidge Commission called for extensions from Lechmere to Woburn over the Southern Division, and Harvard to Arlington over the Lexington Branch; the cutoff was not proposed as a route.[36][37][38] The 1962 North Terminal Area Study called for the Main Line (now the Orange Line) to be relocated along the B&M Western Route. It was to have a branch via the Southern Division to Woburn or Arlington (the latter also using the cutoff).[39] The 1966 Program for Mass Transportation, and subsequent reports by the Massachusetts Bay Transportation Authority (MBTA), largely followed the routes laid out by the Coolidge Commission. Green Line service would be extended from Lechmere over the Southern Division, and Red Line service from Harvard (with various routings proposed to reach the Lexington Branch); the cutoff was not proposed for conversion.[40]
The B&M replaced the Somerville yard with smaller yards elsewhere in the system in the 1970s, ending regular use of the cutoff by "as many as two-dozen mile-long freight trains daily". The route chosen for the Red Line Northwest Extension in the mid-1970s included a station at Davis Square, with the rapid transit tunnel running under a segment of the cutoff from Davis Square to east of Alewife station.[41] In April 1980, the west half of the cutoff was abandoned to allow for construction of the extension.[21][42] The eastern portion was used to haul dirt removed from the tunnel for reuse around the region; it was abandoned in 1983 except for a short section serving an industrial customer at Somervile Junction.[42][21] That segment was abandoned in 2007.[42]
Path conversion
As part of the Red Line extension, the Шаблон:Convert Alewife Linear Park rail trail was constructed from Alewife to Davis, opening in 1985.[43][44] Except for a short section near Alewife station, it follows the former railroad route. The Somerville Community Path opened Шаблон:Convert from Davis Square to Cedar Street in 1992, with the Шаблон:Convert Massachusetts Avenue–Davis Square segment of the Alewife Linear Park becoming part of the Community Path. The Minuteman Bikeway opened in 1993, connecting to the existing trail at Alewife station. The crossing of Massachusetts Avenue, which originally zig-zagged using existing crosswalks, was signalized as a direct crossing in 2011.[45] A Шаблон:Convert extension of the Community Path to Lowell Street opened in 2015; it will be further extended along the Lowell Line in 2022 as part of the Green Line Extension project.[46]
The Шаблон:Convert segment west of Alewife station through the Alewife Brook Reservation was used as an unpaved trail; a stone dust surface was added in the 1990s.[47] Construction of the paved Fitchburg Cutoff Path took place from September 2010 to August 2013, with a new bridge built over a stormwater management wetland at Alewife.[48][49] The planned Belmont Community Path will extend west through Belmont parallel to the Fitchburg Line, connecting with existing sections of the Mass Central Rail Trail.[50][51]
In 1985–86, an access road was constructed from the Alewife station garage to the Route 2/Alewife Brook Parkway intersection, following the cutoff alignment for about Шаблон:Convert. The Alewife Linear Park runs as a sidewalk along the access road for most of that length.[52][53]
-
Fitchburg Cutoff Path
-
The Route 2 access road, with a sidewalk serving as part of the Alewife Linear Park
-
A typical section of the Alewife Linear Park
-
The 1992-built portion of the Somerville Community Path
-
The 2015-built portion of the Somerville Community Path
References
External links
Шаблон:Attached KML Шаблон:Commons category inline
- ↑ 1,0 1,1 Шаблон:Cite book
- ↑ 2,0 2,1 2,2 2,3 2,4 2,5 2,6 Шаблон:Cite book
- ↑ 3,0 3,1 Шаблон:Cite book
- ↑ 4,0 4,1 Шаблон:Cite book
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite magazine
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite journal
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite map
- ↑ Шаблон:Cite news Шаблон:Open access
- ↑ Шаблон:Cite news Шаблон:Open access
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news Шаблон:Open access
- ↑ Шаблон:Cite news Шаблон:Open access
- ↑ Шаблон:Cite news
- ↑ 21,0 21,1 21,2 Шаблон:Cite book
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news Шаблон:Open access
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite book
- ↑ Шаблон:Citation
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite book
- ↑ 42,0 42,1 42,2 Шаблон:Cite book
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite press release
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite magazine
- ↑ Шаблон:Cite news Шаблон:Open access
- ↑ Шаблон:Cite news Шаблон:Open access
- Страницы с неработающими файловыми ссылками
- Английская Википедия
- Transportation in Cambridge, Massachusetts
- Railroad cutoffs
- Boston and Maine Railroad
- Transportation in Somerville, Massachusetts
- Parks in Middlesex County, Massachusetts
- Linear parks
- Rail trails in Massachusetts
- Страницы, где используется шаблон "Навигационная таблица/Телепорт"
- Страницы с телепортом
- Википедия
- Статья из Википедии
- Статья из Английской Википедии