Английская Википедия:Fukuen Line

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:More citations needed Шаблон:Use dmy dates Шаблон:Infobox rail line The Шаблон:Nihongo is a railway line in Hiroshima Prefecture, Japan, operated by the West Japan Railway Company (JR West). It connects Fukuyama Station in Fukuyama to Miyoshi Station in Miyoshi.

Stations

Line Name Distance (km) Transfers Location
Fukuen Line Шаблон:STN 福山 0.0 Файл:Shinkansen jrw.svg Sanyō Shinkansen
Файл:JRW oka-W.svg Файл:JRW oka-X.svg Sanyō Main Line
Fukuyama Hiroshima
Шаблон:STN 備後本庄 1.8  
Шаблон:STN 横尾 6.1  
Шаблон:STN 神辺 8.4 Ibara Railway Ibara Line
Шаблон:STN 湯田村 10.4  
Шаблон:STN 道上 11.3  
Шаблон:STN 万能倉 13.4  
Шаблон:STN 駅家 14.6  
Шаблон:STN 近田 16.0  
Шаблон:STN 戸手 17.0  
Шаблон:STN 上戸手 18.8  
Шаблон:STN 新市 20.0  
Шаблон:STN 高木 21.7   Fuchū
Шаблон:STN 鵜飼 22.7  
Шаблон:STN 府中 23.6
Шаблон:STN 下川辺 27.9  
Шаблон:STN 中畑 31.8  
Шаблон:STN 河佐 34.9  
Шаблон:STN 備後三川 42.4   Sera, Sera
Шаблон:STN 備後矢野 46.6   Fuchū
Шаблон:STN 上下 50.3  
Шаблон:STN 甲奴 54.7   Miyoshi
Шаблон:STN 梶田 57.1  
Шаблон:STN 備後安田 62.3  
Шаблон:STN 吉舎 67.3  
Шаблон:STN 三良坂 73.6  
Шаблон:STN 塩町 78.0 Файл:JRW hiro-P.svg Geibi Line
Geibi Line
Шаблон:STN 神杉 79.5  
Шаблон:STN 八次 82.8  
Шаблон:STN 三次 85.1 Файл:JRW hiro-P.svg Geibi Line

Former connecting lines

Rolling stock

History

The Ryobi Light Railway opened a Шаблон:Track gauge gauge line to Fuchu in 1914, and electrified it at 750 V DC in 1927. The company was nationalised in 1933, the same year the Japanese Government Railway opened the Shiomachi to Kisa section of the line (then as an extension of the Geibi Line).Шаблон:Citation needed The Fukuyama to Fuchu section was regauged to Шаблон:Track gauge in 1935, the year the Kisa to Joge section opened. The two sections were connected with the opening of the Fuchu to Joge section in 1938.Шаблон:Citation needed

The Fuchu to Shimo-Kawabe section was electrified in 1954, and whilst the voltage on the Fukuyama to Fuchu section was increased to 1500 V DC in 1961, the Fuchu to Shimo-Kawabe electrification was decommissioned the following year.Шаблон:Citation needed

Freight services ceased in 1986, and in 1989, the 6,123 m Hattabara Tunnel and associated deviation were commissioned, shortening the route by 1.4 km.Шаблон:Citation needed

Wanman driver only operation commenced on the non-electrified section between Шаблон:STN and Шаблон:STN on 1 April 1991, using KiHa 120-300 DMUs.[1] Driver-only operation commenced on the electrified section between Шаблон:STN and Шаблон:STN on 14 March 1992, using 105 series EMUs.[1]

References

Шаблон:Commons category Шаблон:Reflist

Шаблон:West Japan Railway Company Lines Шаблон:Hiroshima transit