Английская Википедия:Glossop line

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:More citations needed Шаблон:Use dmy dates Шаблон:Infobox rail line Шаблон:Glossop Line RDT The Glossop line is a railway line connecting the city of Manchester with the towns of Hadfield and Glossop in Derbyshire, England. It formed part of the historic Great Central Main Line between Manchester Piccadilly and Sheffield Victoria. Passenger services on the line are operated by Northern Trains.

History

The line is the surviving section, west of the Pennines, of the Woodhead Line, which was electrified in the early 1950s; passenger services east of Hadfield were withdrawn in 1970, followed by complete closure of the line in 1981.

Hattersley was opened in 1978, around Шаблон:Convert east of the then Godley station site, to serve the 1960s Hattersley estate. In 1985, the Flowery Field and new Godley stations were built; this new Godley site is around 500m west of the original Godley station, then renamed Godley East. These two stations, along with Ryder Brow on the Hope Valley line, were built to a minimum standard, using hollow wooden structures compared the more grandiose stonework of original stations, like Newton for Hyde or Glossop. Godley East was then closed in 1986, effectively being replaced by the newer Godley and Hattersley stations.

In December 1984, the Manchester–Glossop/Hadfield line electrification was converted from 1500 V DC to 25 kV AC. Шаблон:BRC EMUs took over from the veteran Шаблон:BRC units. The 303s later returned to the Glasgow area and were, in turn, replaced by Шаблон:BRC and Шаблон:BRC units before the then new Шаблон:BRC units were introduced to the line in November 1997. These units were due to transfer to the West Midlands in 2017 to be replaced by four car units,[1] and as these trains were longer, platform extensions at Godley and Flowery Field were carried out in the late 2010s. Network Rail plans to further lengthen platforms to support six carriage Шаблон:BRC/0 units by 2043.[2]

After Manchester Piccadilly, the busiest station on the line is Glossop, followed by Hadfield and Guide Bridge.[2]

Route

Файл:Dinting viaduct in the snow.jpg
Dinting Viaduct in 1994

The following table summarises the line's thirteen stations, their distance measured from Шаблон:Stn and estimated number of passenger entries/exits in 2019/20:

Station Location Local authority Mileage Patronage
Шаблон:Stn Manchester city centre City of Manchester 0 32.199 m
Шаблон:Rws Openshaw City of Manchester 1.61 0.129 m
Шаблон:Rws Gorton City of Manchester 2.81 0.126 m
Шаблон:Rws Fairfield Tameside 3.72 43,316
Шаблон:Rws Audenshaw Tameside 5.02 0.386 m
Шаблон:Rws Flowery Field Tameside 6.8 0.253 m
Шаблон:Rws Newton Tameside 7.4 0.210 m
Шаблон:Rws Godley Tameside 8.1 0.107 m
Шаблон:Rws Hattersley Tameside 8.8 0.110 m
Шаблон:Rws Broadbottom Tameside 9.8 0.202 m
Шаблон:Rws Dinting High Peak 11.9 0.163 m
Шаблон:Rws Hadfield High Peak 12.6 0.397 m
Шаблон:Rws Glossop High Peak 12.9 1.129 m

The same train serves Glossop and Hadfield via one of three routings:

Routing In use
Dinting–Hadfield–Glossop–Dinting Morning Peak services
Dinting–Glossop–Hadfield–Dinting Evening Peak services
Dinting–Glossop–Hadfield–Glossop–Dinting All other times

During the autumn "leaf fall" timetable, this pattern is modified so that the morning rush hour pattern is extended to about midday and the evening rush hour pattern starts as soon as the morning rush hour pattern finishes.

The line also includes a closed station at Шаблон:Rws. This station was originally Godley Junction and was renamed Godley when the line to Stockport Tiviot Dale, via Woodley, was closed. The station became Godley East when the current Godley station was built slightly west in the 1980s.

There are also remnants of a platform and shelter near Gamesley, between Broadbottom and Dinting. Known as Mottram Staff Halt, it served the former Mottram Goods Yard.

Future proposals

Файл:323godley.jpg
Class 323 at Godley

Network Rail's Route 20 NW Urban Route Plan 2008 suggested the following improvements for 2009–2014 (Control Period 4) and 2014+ (Control Period 5). Potentially introduce a new Piccadilly – Stalybridge service, helping the Hadfield/Glossop service to achieve better utilisation and consequently avoid excessive platform lengthening.

Other potential changes include raising the linespeed around Dinting triangle from the present 10 mph-40 mph to 10 mph-50 mph, and the linespeed from Guide Bridge to Dinting from 60 mph to "up to 90 mph". Raising the linespeed will help the same number of units to work a 4tph (train per hour) service when they currently can only work 3 TPH, and incidentally avoids platform lengthening that would otherwise be necessary. New turnback facility would be provided (with associated OHLE works) in the Broadbottom/Gamesley area.

A new facility to stable 20 vehicles at Guide Bridge, will be required for new vehicles to arrive as part of the DfT Rolling Stock Plan.[3]

Metrolink

In the early 1980s, proposals were put forward to convert the Glossop line to light rail operation for the proposed Manchester Metrolink system. While construction of Metrolink went ahead, the Glossop line was not included in the system. In November 2013 the Greater Manchester Combined Authority approved a recommended strategy for reconfiguring existing commuter services into tram-train operation; identifying the Glossop line as potentially suitable for conversion within Phase 2 of the tram-train strategy.[4]

See also

References

Шаблон:Commons category Шаблон:Attached KML Шаблон:Reflist

Шаблон:Railway lines in the East Midlands Шаблон:Railway lines in North West England