Английская Википедия:Higher-speed rail
Шаблон:Short description Шаблон:About Шаблон:Use dmy dates Шаблон:Multiple image Higher-speed rail (HrSR),[1] also known as high-performance rail,[2] higher-performance rail,[3] semi-high-speed rail or almost-high-speed rail,[4] is the jargon used to describe inter-city passenger rail services that have top speeds of more than conventional rail but are not high enough to be called high-speed rail services.[5] The term is also used by planners to identify the incremental rail improvements to increase train speeds and reduce travel time as alternatives to larger efforts to create or expand the high-speed rail networks.[6]
Though the definition of higher-speed rail varies from country to country, most countries refer to rail services operating at speeds up to Шаблон:Cvt.[7]
The concept is usually viewed as stemming from efforts to upgrade a legacy railway line to high speed railway standards (speeds in excess of Шаблон:Cvt), but usually falling short on the intended speeds. The faster speeds are achieved through various means including new rolling stock such as tilting trains, upgrades to tracks including shallower curves, electrification, in-cab signalling, and less frequent halts/stops.[8]
Definitions by country
As with the definitions of high-speed rail, the definition varies by country. The term has been used by government agencies,[9] government officials,[10] transportation planners,[11] academia,[12] the rail industry,[13] and the media,[14] but sometimes with overlaps in the speed definitions. Some countries with an established definition of higher-speed rail include:
- In Canada, according to the Surface Transportation Policy, Department of Transport, the speed range for higher-speed rail is between Шаблон:Cvt.[5]
- In India, according to the Ministry of Railways, the speed range for India's higher-speed rail will be between Шаблон:Cvt.[7]
- In the United Kingdom, the term higher-speed rail is used for upgraded tracks with train speeds up to Шаблон:Cvt[15]
- In the United States, the term "higher-speed rail", as opposed to "high-speed rail", is used by regional planners in many U.S. states to describe inter-city passenger rail services with top speeds of between Шаблон:Cvt[16] and Шаблон:Cvt.[17][18][19] This is the equivalent of the definition of "Emerging High-Speed Rail" as defined by the Federal Railroad Administration.[20] However, the Congressional Research Service defines "Higher Speed Rail" as rail services with speeds up to Шаблон:Cvt and defines rail services on dedicated tracks with speeds over Шаблон:Cvt as "Very High Speed Rail".[21]Шаблон:ParagraphState-level departments of transportation and council of governments may use different definitions. Below is the list of known definitions of higher-speed rail which use some of the 5 speed levels, Шаблон:Cvt, Шаблон:Cvt, Шаблон:Cvt, Шаблон:Cvt and Шаблон:Cvt:
Agency / Council | Top speeds (mph) | Ref |
---|---|---|
California Department of Transportation | Up to 125 | [22] |
Minnesota Department of Transportation | Greater than 90 but less than 125 | [23] |
North Central Texas Council of Governments | 80–150 | [11] |
Oklahoma Department of Transportation | 110–125 | [24] |
Texas Department of Transportation | 110–125 | [24] |
Virginia Department of Rail and Public Transportation | Up to 110 | [19] |
Speed limits
In Canada, the assumption about grade crossing is that operating higher-speed rail services between Шаблон:Convert would require "improved levels of protection in acceptable areas".[25]
In the United States, railroad tracks are largely used for freight with at-grade crossings. Passenger trains in many corridors run on shared tracks with freight trains. Most trains are limited to top speeds of Шаблон:Convert unless they are equipped with an automatic cab signal, automatic train stop, automatic train control or positive train control system approved by the Federal Railroad Administration (FRA).[26] In developing higher-speed rail services, one of those safety systems must be used.
Additionally, the FRA establishes classification of track quality which regulates the speed limits of trains with Class 5, Class 6, Class 7 and Class 8 for top speeds of Шаблон:Cvt,[27] Шаблон:Cvt, Шаблон:Cvt and Шаблон:Cvt, respectively.[28] The FRA also regulates passenger train design and safety standards to ensure trains that operate at speeds of Шаблон:Cvt up to Шаблон:Cvt comply with its Tier I standard and trains that operate at speeds up to Шаблон:Cvt comply with its Tier II standard.[29]
Another limitation is the safety of grade crossings (also known as level crossings, flat level crossings, non-grade-separated crossings) which limits how fast trains can go. FRA regulations set speed limits for tracks with grade crossings as follows:[30] Level crossings are generally the most dangerous part of the railway network with a large number of fatal incidents occurring at a grade crossing.
- For Шаблон:Cvt or less: Grade crossings are permitted. States and railroads cooperate to determine the needed warning devices, including passive crossbucks, flashing lights, two quadrant gates (close only 'entering' lanes of road), long gate arms, median barriers, and various combinations. Lights and/or gates are activated by circuits wired to the track (track circuits).
- For Шаблон:Cvt: The FRA permits crossings only if an "impenetrable barrier" blocks highway traffic when a train approaches.
- Above Шаблон:Cvt: No crossings will be permitted.
In Europe, the limit is often Шаблон:Cvt over grade crossings.[31] In Sweden there is a special rule permitting Шаблон:Cvt if there are barriers and automatic detection of road vehicles standing on the track.[32] In Russia Шаблон:Cvt is permitted over grade crossings.[33] The United Kingdom has railway lines of 200 km/h (125 mph) which still use grade crossings.
With the above limitations, many regional transportation planners focus on rail improvements to have the top speeds up to Шаблон:Cvt when proposing a new higher-speed rail service.[21]
Similar categories
In countries where there had been rail improvement projects in the later part of the 20th century and into the 2000s, there are inter-city rail services with comparable speed ranges of higher-speed rail, but they are not specifically called "higher-speed rail". Below are some examples of such services that are still in operation.
- Canada: The Quebec City–Windsor Corridor that runs between Windsor City and Windsor allows Via Rail trains to run at speeds of Шаблон:Cvt.
- Europe: The InterCity services in many European countries have top speeds of mostly up to Шаблон:Cvt, but they can go up to Шаблон:Cvt. Intercity trains that cross international borders are usually designated as Eurocity and reach similar speeds where tracks allow it. High speed trains also may use upgraded and electrified lines that are not purpose-built during part of their journey at up to Шаблон:Cvt.
- Japan: The Mini-shinkansen lines in Japan are the conventional lines that have been converted from narrow gauge to standard gauge to allow Shinkansen trains to pass through with top speeds of Шаблон:Cvt.[34] However, the International Union of Railways recognizes the Mini-shinkansen lines as high-speed rail.[35] Two Mini-shinkansen lines have been constructed: the Yamagata Shinkansen and Akita Shinkansen.[36] Both of these lines branch off from the high-speed Tohoku Shinkansen line with top speeds of 320 km/h (200 mph).
- Spain: Many inter-city rail services operated by Renfe Operadora, the state-owned company, are not classified as high-speed rail. Those services are Alaris, Altaria, Arco and Talgo (from Talgo III to Talgo VII) with top speeds of Шаблон:Cvt[37]
- In Norway, there is sometimes talked about høy hastighet, which may be compared to higher-speed rail as used here – and høyhastighet, high-speed rail. Most of the rail network is old, with sharp curves, and speeds at only Шаблон:Cvt. The lines around Oslo are upgraded or renewed, or are planned to be so. Some of the sections, like Follobanen (Oslo–Ski, 22 km), are built or planned for Шаблон:Cvt – though others to høy hastighet, i.e. Шаблон:Cvt or Шаблон:Cvt.[38] By the same token, the Norwegian FLIRT trains and the El 18 locomotives have a top speed of 200 km/h. Gardermobanen is called a high-speed line,[39] and the GMB Class 71 and NSB Class 73 are often called high-speed trains[40] – with Шаблон:Cvt top speed. However, the limits are blurry. Sometimes, e.g. the FLIRTs are called high-speed trains.[41]
- Sweden: SJ (Swedish Railways) operates inter-city rail services using X 2000 and SJ 3000 (X55) trains in major routes across the country with top speeds of Шаблон:Cvt. The operator brands them as snabbtåg ("fast trains") although "high-speed trains" is sometimes used in English language ads;[42][43] however, the International Union of Railways only recognizes the Шаблон:Cvt line from Stockholm to Malmö and Göteborg as the only high-speed rail lines in Sweden which is still in the planning stage, and are called "höghastighetsbanor" (high-speed railways).[35]
- In Germany regional trains along the Munich-Nuremberg high speed line which was built for Шаблон:Cvt run at Шаблон:Cvt without being specially designated. Those trains use locomotives that are used for Intercity trains elsewhere and the higher speed (in comparison to other regional trains) was chosen mainly to increase capacity.
- The United Kingdom has service which run at Шаблон:Cvt, such as the East Coast Main Line, West Coast Main Line, Great Western Main Line and Midland Main Line. But there are signaling upgrades currently happening on the East Coast Main Line and rolling stock to increase speeds to Шаблон:Cvt.
- South Korea: MOLIT designates railway lines as three categories: high-speed railway lines (Шаблон:Lang), semi-high-speed railway lines (Шаблон:Lang), or conventional railway lines (Шаблон:Lang). High-speed railway lines are limited to dedicated lines with maximum speed over Шаблон:Cvt, while semi-high-speed rail can be mixed-use lines with maximum speed ranged in Шаблон:Cvt–Шаблон:Cvt. For conventional railway lines, due to the limitation of signal systems and designed maximum speed of trains, most lines are limited by maximum speed under Шаблон:Cvt. However, Gyeongchun line has been upgraded as a higher-speed railway line, with dedicated ITX-Cheongchun EMU trains designed as maximum speed of Шаблон:Cvt.
Commuter rail services
Some commuter rail services that cover shorter distances may achieve similar speeds but they are not typically called as higher-speed rail.[19] Some examples are:
- Numerous regional ICRs in China such as Dongguan–Huizhou intercity railway and Changsha–Zhuzhou–Xiangtan intercity railway operate up to Шаблон:Cvt.
- Coaster links Oceanside, California and San Diego on Pacific Surfliner trackage with top speeds of Шаблон:Convert[44]
- MARC Penn Line covers Шаблон:Convert on Northeast Corridor trackage and has been upgraded to Шаблон:Cvt[45]
- Metrolink Orange County Line and Inland Empire–Orange County Line, also on Pacific Surfliner trackage, operate at top speeds of Шаблон:Cvt on segments south of Santa Ana[46] and in Camp Pendleton.[47]
- Caltrain electrification project is underway between San Francisco to Tamien Station as part of upgrades for blended service with CHSR. The Caltrain trains will be capable of reaching speeds of up to Шаблон:Cvt.[48]
Rail improvement strategies
There are many types of trains that can support higher-speed rail operation. Usually, the rail infrastructure needs to be upgraded prior to such operation. However, the requirements to the infrastructure (signalling systems, curve radii, etc.) greatly increase with higher speeds, so an upgrade to a higher-speed standard is often simpler and less expensive than building new high-speed lines. But an upgrade to existing track currently in use, with busy traffic in some segments, introduces challenges associated with the construction work that could potentially disrupt the train services. The followings are some strategies used by regional transportation planners and rail track owners for their rail improvement projects in order to start the higher-speed rail services.
Signal upgrades
In Victoria, Australia, the increased top speeds from Шаблон:Cvt in the Regional Fast Rail project required a change to the signalling system to account for increased braking distance. Prior to the project, the system comprised a mixture of equipment from pre-WWI mechanical signalling to the remote control systems of the 1980s. In some cases, operators needed to telephone the local operators to manually control the signal boxes. With the new speeds, the signalling needed to be computerized. The project employed the Solid State Interlocking with the newly laid fiber-optic communication between the components to use three computer systems to control the signals. When the output of one computer differs from the other two, the system will fail that computer and continue the signal operations as long as the outputs from the other two computers are consistent. The project deployed the Train Protection & Warning System which allows the system to automatically applies the brakes at a sufficient distance to stop the train if the driver does not control the speeds adequately. The project also incorporated Train Control and Monitoring System to allow real-time monitoring of the position of trains.[49]
In the United States, the first step to increase top speeds from Шаблон:Convert is to install a new signal system that incorporates FRA-approved positive train control (PTC) system that is compatible with higher-speed rail operation.[50] They are both transponder-based and GPS-based PTC systems currently in use in the United States. By a mandate, a significant portion of the railroads in the United States will be covered by PTC by the end of 2015.[51]
Track improvements
To support trains that run regularly at higher speeds, the rails need to be reliable. Most freight tracks have wooden ties which cause rails to become slightly misaligned over time due to wood rot, splitting and spike-pull (where the spike is gradually loosened from the tie).[52] The concrete ties used to replace them are intended to make the track more stable, particularly with changes in temperature.[53] Rail joints are also an issue, since most conventional rail lines use bolts and fishplates to join two sections of the rail together. This causes the joint to become slightly misaligned over time due to loosening bolts. To make for a smoother ride at higher speeds, the lengths of rail may be welded together to form continuous welded rail (CWR). However, the continuous welded rails are vulnerable to stress due to changes in temperature.[54]
In Australia, the track condition before the Regional Fast Rail project could only support trains up to speeds of Шаблон:Cvt. The tracks are with mixture of wooden and concrete ties. The rail weight varies but with majority being Шаблон:Convert. The track upgrade in the project included changing to use concrete ties and to use new standard of rail weight at Шаблон:Convert in order to support the new top speeds of Шаблон:Cvt.[55]
There may be restriction in maximum operating speeds due to track geometry of existing line, especially on curves. Straightening the route, where possible, will reduce the travel time by increasing the allowable speeds and by reducing the length of track. When straight routes are not possible, reducing the number of curves and lowering the degree of curvature would result in higher achievable speeds on those curves. An example is the elimination of three consecutive reverse curves in favor of one larger curve. Raising superelevation may be considered for sharp curves which significantly limit speed. The higher speeds on those modified curves, together with the higher superelevation, will require track modification to have transition spirals to and from those curves to be longer.[56]
Old turnouts may need replacement to allow trains to run through the turnouts at higher speeds. In the United States, some old turnouts have speed limit of Шаблон:Cvt. Even with newer turnouts (rated #20), the diverging speed limit is still at Шаблон:Cvt which would significantly slow down the higher-speed train passing through those sections. High-speed turnouts (rated #32.7) are capable of handling maximum diverging speeds of Шаблон:Cvt.[57][58][59]
In order to minimize the downtime to upgrade tracks, a track renewal train (TRT) can automate much of the process, replacing rails, ties, and ballast at the rate of 2 miles per day. In the United States, a TRT is used by Union Pacific Railroad on the track shared with future higher-speed rail service in Illinois area.[60][61]
For electrified track, the old catenary may need to be replaced. The fixed-tension catenary which is acceptable for low speeds may not be suitable for regular higher-speed rail services, where a constant tension is automatically maintained when temperature changes cause the length of the wire to expand or contract.[62]
Crossing improvements
With trains running at higher speeds throughout the route, safety at all at-grade crossings needs to be considered.
In Australia, the levels of upgrade of the crossing in the rail improvements project were based on the risk analysis. The improvements included flashing light protection, automatic full barriers protection, and pedestrian gates crossings. The project also introduced the use of rubber panels at the crossings.[49]
In the United States, the FRA limits train speeds to Шаблон:Cvt without an "impenetrable barrier" at each crossing. Even with that top speed, the grade crossings must have adequate means to prevent collisions. Another option is grade separation, but it could be cost-prohibitive and the planners may opt for at-grade crossing improvements instead.[30]
The safety improvements at crossings can be done using combination of techniques. This includes passive devices such as upgraded signage and pavement markings. Another low-cost passive device is median separators which are installed along the center line of roadways, extending approximately 70 to 100 feet from the crossing, to discourage drivers from running around the crossing gates. More active devices include the four-quadrant gate, which blocks both sides of each traffic lane. Longer gate arms can cover 3/4 of the roadway. Video cameras can also be installed to catch the violators. A signal monitoring system can also be installed to alert the crews when the crossing equipment has malfunctioned.[63]
In Norway, grade crossing speed are not permitted to exceed Шаблон:Cvt.[64]
Rerouting and passing sidings
In areas where there is frequent interference between freight and passenger trains due to congestion which causes the passenger trains to slow down, more extensive improvements may be needed. Certain segments of the line in congested areas may need to be rerouted. New track may need to be laid to avoid many curves which slow down the trains. In stretches of heavy freight train traffic, adding passing sidings along the segment should be considered. Sometimes certain stations may need to be bypassed.[65]
Electrification
Another consideration is electrification. Electrifying a railway line entails a major upgrade to the rail infrastructure and equipment. On the infrastructure side, it requires catenary lines to be built above the tracks. New transmission lines are needed to carry power from the power plants. Substations are required for each of the Шаблон:Convert lengths to reduce severe voltage losses. There is also a need to consider the required amount of power supply and new power plants may be required. For locomotives, new electric locomotives are needed or existing diesel-electric locomotives can be retrofitted into all-electric locomotives, but it is a complicated task.[66] These factors cause electrification to have high initial investment costs. The advantages of all-electric locomotives are that they provide quieter, cleaner and more reliable operations than the diesel-electric counterpart. The fuel consumption, locomotive maintenance costs and track wear of all all-electric locomotives are also lower.[67] Furthermore, electric traction makes the operator more independent of oil price fluctuations and imports, as electricity can be generated from domestic resources or renewable energy. This was a major consideration in the electrification of the German Democratic Republic network, as lignite (and therefore electricity) was cheap and plentiful domestically whereas oil had to be imported at world market prices.Шаблон:Citation needed
An alternative to catenary lines is to use a third rail system which has a semi-continuous rigid conductor placed alongside or between the rails of a railway track. However the operating speeds of this type of systems cannot be greater than Шаблон:Cvt due to its limitation of the power supply gaps at turnouts and grade crossings. Therefore, the third rail system is not generally used for higher-speed rail.[68]
One example in the United States that does involve electrification is the Keystone Improvement Project to provide higher-speed rail service along the Harrisburg-Pittsburgh segment of the Keystone Corridor in Pennsylvania. The plan includes additional track, a new signal system and electrification. If completed as planned, this would allow Amtrak to utilize electric power continuously on service from Philadelphia to Pittsburgh. The first segment ("Main Line") has already been using electric locomotives with a top speed of Шаблон:Cvt.[69]
In operation
Australia
Шаблон:See also In 1999, the concept of Regional Fast Rail project was initiated by the State Government of Victoria with a goal to provide express higher-speed rail services between 4 main regional centres of Victoria (Geelong, Ballarat, Bendigo and the Latrobe Valley) and Melbourne. The initiative included a key component to upgrade rail infrastructure to have top speeds up to Шаблон:Cvt. The development phase of initiative was between 2000 and 2002. Finally, the services on four lines began between 2005 and 2006 with top speeds of 160 km/h using VLocity trains.[70] Additionally, Queensland Rail's Tilt Train, the Transwa Prospector and NSW TrainLink's XPT all have a top service speed of 160 km/h (99–100 mph).[71][72][73]
The New South Wales XPT (short for Express Passenger Train) is the main long-distance passenger train operated by NSW TrainLink on regional railway services in New South Wales, Australia from Sydney to Dubbo, Grafton, and Casino as well as interstate destinations, Brisbane and Melbourne. The XPT is based on the British Rail designed High Speed Train and entered service in April 1982. It came to fruition in January 1978 when the Public Transport Commission invited tenders for 25 high-speed railcars similar to the Prospector railcars delivered by Comeng to the Western Australian Government Railways in 1971. Comeng's proposal for a train based on the InterCity 125 was announced as the successful bidder in October 1976.
The Tilt Train is the name for two similar tilting train services, one electric and the other diesel, operated by Queensland Rail on the North Coast line from Brisbane to Rockhampton and Cairns. In May 1999 the Electric Tilt Train set an Australian train speed record of Шаблон:Cvt north of Bundaberg, a record that still stands.[74][75]
The Transwa WDA/WDB/WDC class are a class of railcars built by United Goninan, Broadmeadow for Transwa in 2004–05 to replace the WAGR WCA/WCE class railcars on the AvonLink and Prospector services in Australia. They are capable of high-speed operation.
China
In China, higher-speed railways are railways that are not officially categorized as high-speed rail but allow CRH EMUs run on it with speeds up to 200 km/h.[76] Typically these lines are classified as Grade I conventional railways and are used by both passenger and freight services.
Note that the majority of high-speed lines are also called "passenger-only"(Шаблон:Lang-zh) lines. Inside mainland China this word invokes a sense of higher-speed rail but the wording usage is inconsistent.
Train identifiers
Identifiers starting with G indicates at least part of the train's route operates at a maximum 300 km/h or above (this is a characteristic of the line rather than the precise maximum speed of this exact train) and not running at deliberately reduced speed on any section. Other sections of the route may have lower speeds as low as 160 km/h.
Identifiers starting with C indicates short-distance travel using CRH trains, the maximum speed is irrelevant (ranging from 160 km/h Ürümqi-Korla service to 350 km/h Beijing-Tianjin (via intercity) service).
Identifiers starting with D indicates CRH services with maximum speed 265 km/h or less, including overnight sleepers on 310 km/h Beijing-Guangzhou line (running them 310 km/h overnight not only causes noises but also disturbs sleeping patterns of passengers. This is an example of deliberately reduced speeds).
Identifiers starting with S indicates metropolitan services using CRH rolling stock and have a different fare system to the national one. Their maximum speed is 160 km/h.
Note: The start and end station in the following lists accounts only CRH services. * denotes some section of this line doesn't have 160 km/h CRH services.
Conventional lines running CRH services
Line name | Line name (Chinese) |
start station | end station | Train identifiers | Note |
---|---|---|---|---|---|
Southern Xinjiang* | 南疆线(吐库二线段) | Шаблон:Rws/Шаблон:Rws | Шаблон:Rws | C T K Y none | |
Lanzhou-Xinjiang (West)* (including Second track) |
兰新线西段(北疆线) | Шаблон:Rws | Шаблон:Rws | C T K Y | Bole station where Boltala Prefecture branch splits is no longer a passenger stop.[77] |
Jinghe-Khorgos | 精伊霍铁路 | Шаблон:Rws | Шаблон:Rws | C T K Y | |
Boltala Prefecture Branch | 博州支线 | Шаблон:Rws | Шаблон:Rws | C T K Y | |
Liuyuan-Golmud* | 柳格线柳敦段 | Шаблон:Rws | Шаблон:Rws | D K Y none | No CRH train from/to Dunhuang stops at Yumen. |
Changchun-Baicheng Baicheng-Arxan* |
长白·白阿线(长乌段) | Шаблон:Rws | Шаблон:Rws | C Z K | |
Hohhot-Ordos | 呼鄂线 | Шаблон:Rws | Шаблон:Rws | D Z K | |
Beijing Suburban: Huairou-Miyun |
北京市郊怀密线 | Шаблон:Rws | Шаблон:Rws | S | |
Beijing Suburban: Sub-Center |
北京市郊副中心线 | Шаблон:Rws | Шаблон:Rws | S | |
Tianjin-Jizhou | 津蓟铁路 | Шаблон:Rws | Шаблон:Rws | S | |
Beijing-Qinhuangdao | 京秦线(京哈线) | Шаблон:Rws | Шаблон:Rws | D Z T K Y | Both conventional and high-speed services has some detouring to Tianjin instead. |
Xiong'an Area | 雄安地区动车 | Шаблон:Rws | Шаблон:Rws | D Z T K Y | Section between Шаблон:Rws and Шаблон:Rws is high-speed Tianjin–Baoding intercity railway(mixed traffic). G class trains running solely on aforementioned section is not counted. Section between Shijiazhuang and Xushui East is Beijing–Guangzhou railway. Section between Bazhou West and Beijing South is Beijing–Kowloon railway. |
Northern Tongpu Quadruple Track* | 北同蒲三四线 | Шаблон:Rws | Шаблон:Rws | D Z K | Part of Datong-Xi'an high-speed line. |
Beijing-Shanghai Overnight Sleepers | 京沪动卧 | Шаблон:Rws | Шаблон:Rws | D | 2/1/3 pair(s) of trains between Beijing and Shanghai/Nanjing/Hangzhou daily. Trains to Hangzhou have section between Kunshan and Hangzhou runs via Shanghai–Kunming railway and does not stop at Shanghai. |
Longkou-Yantai | 龙烟线 | Шаблон:Rws | Шаблон:Rws | D | |
Nanjing-Qidong* | 宁启线南启段 | Шаблон:Rws | Шаблон:Rws | D | Section between Nanjing and Nantong is 200 km/h |
CR Shanghai Suburban (Shaoxing) | 上海局市域(绍兴) | Шаблон:Rws | Шаблон:Rws | S | Locally administered |
CR Shanghai Suburban (Ningbo) | 上海局市域(宁波) | Шаблон:Rws | Шаблон:Rws | S | Locally administered |
Dazhou-Chengdu* | 达成线成遂段 | Шаблон:Rws | Шаблон:Rws | D Z T K | Section between Suining and Chengdu is 200 km/h |
Xiangyang-Chongqing* | 襄渝线达渝段 | Шаблон:Rws | Шаблон:Rws | D T K | |
Nanchong-Gaoxing | 南高线 | Шаблон:Rws | Шаблон:Rws | D | Gaoxing station connects to Dazhou-Chongqing but is not a passenger stop |
Shimen County-Changsha | 石长线 | Шаблон:Rws | Шаблон:Rws | D T K | |
Kunming-Hekou* | 昆玉河铁路(标准轨) | Yuxi | Шаблон:Rws | C K | CRH service between Yuxi and Kunming South run on Kunming–Yuxi intercity railway (200 km/h) |
Shanghai-Kunming* | 沪昆线宣昆段 | Шаблон:Rws | Шаблон:Rws | C Z T K none | |
Litang-Zhanjiang* | 黎湛线贵玉段 | Шаблон:Rws | Шаблон:Rws | D T K none | |
Shejiang-Shantou* | 畲汕线潮汕至汕头 | Шаблон:Rws | Шаблон:Rws | G D K |
Newly built lines operating less than 200 km/h speed
Line name | Line name (Chinese) |
start station | end station | Train identifiers | Note |
---|---|---|---|---|---|
Shanghai Area: Jinshan | 金山线 | Шаблон:Rws | Шаблон:Rws | S[78] | |
Zhongchuan Airport intercity | 中川机场城际 | Шаблон:Rws | Шаблон:Rws | C D | Lanzhou Area only except a single round trip to/from Tianshui South. |
Beijing Subway Daxing Airport Express | 北京地铁大兴机场线 | Шаблон:Stl | Шаблон:Stl | Not exist | Not part of China Railway System. |
Baotou-Xi'an* | 包西线西延段 | Шаблон:Rws | Шаблон:Rws | D Z T K | Different from Baotou–Xi'an high-speed railway (under construction). |
Nanjing-Chengdu* | 宁蓉线宜凉段 (宜万铁路) |
Шаблон:Rws | Шаблон:Rws | G D Z K | Passenger service branches at Шаблон:Rws. |
Lanzhou-Chongqing | 兰渝铁路 | Шаблон:Rws | Шаблон:Rws | G D Z K | |
Changsha-Zhuzhou/Xiangtan | 长株潭城际铁路 | Шаблон:Rws | Шаблон:Rws/Шаблон:Rws | C | |
Guiyang-Kaiyang | 贵开城际铁路 | Шаблон:Rws | Шаблон:Rws | C | |
Guiyang Loop Line | 贵阳市域铁路环线 | Loop Line | C | ||
Guangzhou-Shenzhen (quadtuple track) | 广深线(城际线) | Шаблон:Rws | Шаблон:Rws | C D | Through operation to Шаблон:Rws (Guiyang-Guangzhou high-speed line), it operates at 180 km/h. |
Designated 200 km/h, operating 160 km/h lines with currently no C/D/G class services
Line name | Line name (Chinese) |
start station | end station | Train identifiers | Note |
---|---|---|---|---|---|
Jining-Baotou quadtuple track* | 集包第二双线 | Шаблон:Rws | Шаблон:Rws | Z T K none | The section between Hohhot East and Baotou is high-speed rail. The section between Jining South and Hohhot differs from Zhangjiakou–Hohhot high-speed railway (all of this line's D class service is transfterred to it). |
Taiyuan-Zhongwei/Yinchuan Corridor | 太中银通道 | Шаблон:Rws | Шаблон:Rws/Шаблон:Rws | Z T K none |
Slow speeds on lines normally running high-speed
This section lists the deliberately reduced scenarios mentioned in "train identifiers" section above. Шаблон:Complete list
Line name | Line name (Chinese) |
start station | end station | Train identifiers | Note |
---|---|---|---|---|---|
Southeast coastal sleepers | 沪广动卧 | Шаблон:Rws/Шаблон:Rws | Шаблон:Rws/Шаблон:Rws | D | Section between Shanghai and Hangzhou uses Shanghai-Kunming high-speed line. Section between Shenzhen North and Zhuhai uses Guangzhou-Shenzhen-Hong Kong high-speed line and Guangzhou-Zhuhai intercity line. |
Beijing-Guangzhou sleepers | 京广动卧 | Шаблон:Rws | Шаблон:Rws and others (see note) | D | Overnight service to Шаблон:Rws, Шаблон:Rws, Шаблон:Rws and Шаблон:Rws using Beijing-Guangzhou-Shenzhen, Guangzhou-Zhuhai, Xinhui-Maoming-Zhanjiang and Shanghai-Kunming high-speed lines. |
Greece
Since 1997, ongoing construction to upgrade and built higher-speed lines capable of speeds of up to Шаблон:Convert is conducted. The P.A.Th.E. Plan (Patras-Athens-Thessaloniki-Evzonoi), as it is called aims at reduced journey times between Greece's main cities (Athens, Thessaloniki and Patra) as well as an improved rail connection between Greece and North Macedonia. Currently, only the modernized lines of Domokos–Thessaloniki, Athens Airport–Kiato, and Thessaloniki–Strymonas are in operation at maximum speeds of Шаблон:Convert.[79]
India
The Gatimaan Express was India's first semi-high speed train.[80] In October 2014, the railways applied for safety certificate from Commission of Railway Safety to start the service. In June 2015, the train was officially announced. The train was launched on 5 April 2016 and completed its maiden journey between Nizamuddin and Agra Cantt within 100 minutes. But due to low occupancy, Indian Railways first extended this train from Agra to Gwalior on 19 February 2018 and then to Jhansi on 1 April 2018.Шаблон:Citation needed
The Tejas Express was Introduced by Indian Railways in 2017. It features modern onboard facilities with doors which are operated automatically. Tejas means "sharp", "lustre" and "brilliance" in many Indian languages. The inaugural run of Tejas Express was on 24 May 2017 from Mumbai Chhatrapati Shivaji Maharaj Terminus to Karmali, Goa. It covered 552 km in 8 hours and 30 minutes.[81] On 1 March 2019, second Tejas Express of the country was flagged off between Chennai Egmore and Madurai Junction by Prime Minister Narendra Modi. It covered 497 km in 6 hours and 30 minutes.[82] Lucknow – New Delhi Tejas Express, which was inaugurated on 4 October 2019, is India's first train operated by private operators, IRCTC, a subsidiary of Indian Railways.[83] The Ahmedabad – Mumbai Tejas express, also operated by IRCTC was inaugurated on the 17 January 2020.[84] From 1 September 2021, the train LHB Rajdhani Rakes are replaced with LHB Tejas Sleeper Rakes. This increased the speed of the train to 130 km/h. The train can travel at a top speed of 160 km/h making it a Semi-High Speed Train.
In 2021, Indian Railways started to upgrade Rajdhani Coaches to Tejas coaches. This replaced its traditional LHB Rajdhani coaches On 15 February 2021, the Agartala Rajdhani Express was upgraded with Tejas livery Sleeper Coaches. On 19 July 2021, the Mumbai Rajdhani Express was upgraded to Tejas class smart coaches. LHB Rajdhani coaches.[85][86] On 1 September 2021 the Rajendra Nagar Patna Rajdhani Express was upgraded to Tejas rakes. This increased the speed of the train to 130 km/h. The train can travel at a top speed of 160 km/h.[87]
In 2019, Vande Bharat Express, also known as Train 18,[88] was inaugurated. This is an Indian higher-speed rail intercity electric multiple unit.[89] It was designed and built by Integral Coach Factory (ICF) at Perambur, Chennai under the Indian government's Make in India initiative over a span of 18 months. The unit cost of the first rake was given as Шаблон:INRConvert, though the unit cost is expected to go down with subsequent production.[90] At the original price, it is estimated to be 40% cheaper than a similar train imported from Europe.[91] The train was launched on 15 February 2019, from Delhi to Varanasi.[92] The service was named 'Vande Bharat Express' on 27 January 2019.[93] On 5 October 2019, a second Vande Bharat Express was opened from Delhi to Katra[94] On 30 September 2022, Prime Minister Narendra Modi inaugurated a 3rd Vande Bharat Express rake connecting Mumbai and Ahmedabad passing through Surat. This rake was an upgraded second generation version.[95] an other second generation rake was inaugurated from Delhi to Una passing through Chandigarh.[96]
Inaugural run and entry into service
The train flagged off for an inaugural run by Prime Minister of India Narendra Modi, on 15 February 2019,[97] with its commercial run started from 17 February 2019 onwards. It will be running on the Delhi-Varanasi route,[98] via Kanpur and Prayagraj, connecting the holy city of Varanasi to the Capital city, reducing travel time along the route by 15 percent.[89] The train's regenerative brakes are also expected to allow a 30% savings in electricity costs as compared to its predecessor.[99] At an operating speed of Шаблон:Convert, it will outpace the Shatabdi Express by Шаблон:Convert.[98] Although the trainset has been tested for speeds up to 180 km/h, it is capable of running at speed of 200 km/h. Every other car on the train is motorised.[100] The 8-hour journey from New Delhi to Varanasi station has the Chair Car CC Class fare of ₹1,755.00 and covers the total distance of about 762 kilometers.[101]
Laos
Шаблон:Main article Passenger trains on the 2021 opened Boten–Vientiane railway travel at speeds of up to 160 km/h,[102][103] however the railway has been described as 'high-speed' as well.[104] Some sections of the railway were planned to allow speeds of up to 200 km/h, however this was downgraded to 160 km/h in the final design.[105][106]
United States
This is the list of the current higher-speed rail services from the East Coast to the West Coast:
Corridor / Segment | Service name | Length (miles) | Equipment | Power | Current Top speed (mph) | Avg speed (mph)[107] | Note |
---|---|---|---|---|---|---|---|
Washington, DC–Boston, MA | Northeast Regional | 457 | locomotive-hauled coaches | Electric | Шаблон:Cvt | Шаблон:Cvt | [108] Trains run on Northeast Corridor trackage shared by high-speed Acela Express trains. This service also qualifies as high-speed rail in certain portions of its route when traveling at its maximum speed, Шаблон:Cvt. |
Miami – Orlando, FL | Brightline | 235 | locomotive-hauled coaches | Diesel-electric | Шаблон:Cvt | Шаблон:Cvt | service started September 22, 2023. |
Philadelphia–Harrisburg, PA, PA | Keystone Service | 104 | locomotive-hauled coaches | Electric | Шаблон:Cvt | Шаблон:Cvt | |
New York City–Albany, NY | Empire Service, Lake Shore Limited, Maple Leaf, Adirondack, Ethan Allen Express | 141 | locomotive-hauled coaches | Diesel-electric | Шаблон:Cvt | Шаблон:Cvt | [21] |
New Haven, CT–Springfield, MA | Hartford Line, Vermonter, Northeast Regional | 62 | locomotive-hauled coaches | Diesel-electric | Шаблон:Cvt | Шаблон:Cvt | Amtrak services running on the New Haven–Springfield Line started operating at Шаблон:Cvt on 16 June 2018.[109] |
Chicago, IL–Detroit/Pontiac, MI | Wolverine | 304 | locomotive-hauled coaches | Diesel-electric | Шаблон:Cvt | Шаблон:Cvt | As of 2014, a Шаблон:Convert portion allows speeds up to Шаблон:Cvt. Another portion of Шаблон:Convert is under construction to increase to those speeds.[21][110] |
Chicago, IL–Port Huron, MI | Blue Water | 319 | locomotive-hauled coaches | Diesel-electric | Шаблон:Cvt | Шаблон:Cvt | As of 2014, a Шаблон:Convert portion allows speeds up to Шаблон:Cvt.[110][111] |
Chicago, IL–St. Louis, MO | Lincoln Service | 284 | locomotive-hauled coaches | Diesel-electric | Шаблон:Cvt | Шаблон:Cvt | [112] |
Chicago, IL–Los Angeles, CA | Texas Eagle | 2,728 | locomotive-hauled coaches | Diesel-electric | Шаблон:Cvt | Шаблон:Cvt | [113] |
Chicago, IL–Los Angeles, CA | Southwest Chief | 2,256 | locomotive-hauled coaches | Diesel-electric | Шаблон:Cvt | Шаблон:Cvt | [114] |
Los Angeles, CA–San Diego, CA | Pacific Surfliner | 130 | locomotive-hauled coaches | Diesel-electric | Шаблон:Cvt | Шаблон:Cvt | [21] There is a study in place to increase maximum speed to Шаблон:Cvt when funding is available.[115] |
Earlier attempts
Canada
There have been several different attempts at higher speed rail in the Quebec City–Windsor Corridor, and several high speed rail attempts as well.[5]
Ireland
In 2010, there was a report commissioned by the Chartered Institute of Logistics and Transport as a mid-term review of Transport 21, an Irish infrastructure plan announced in 2005. The report recommended, among other things, a development of national rail to provide higher-speed rail services.[116] However, there have been no progress toward the recommendation.
United States
There have been long-range visions to establish high/higher-speed rail networks in different regions of the United States but without adequate funding. During the American Recovery and Reinvestment Act of 2009, there was a surge of interest to apply for grants from the federal government to start those projects. However, many proposals have been put on hold or cancelled after failing to secure funding or support from the public or key local politicians.[117][118]
Amtrak Cascades
Шаблон:Main Amtrak Cascades, a Шаблон:Convert intercity rail service, stretches from Eugene, Oregon, through the State of Washington to Vancouver, British Columbia, in Canada. As of 2010, the long-term goal of this corridor was to have the top speeds of the segment of Eugene, Oregon, to Blaine, Washington, with top speeds in the Шаблон:Cvt range, and eventually Шаблон:Cvt on a dedicated track.[119] However, as of 2012, the Washington State Department of Transportation plans for its Шаблон:Convert stretch to have top speeds of only Шаблон:Convert,[120] and the plan in Oregon is to limit the speeds to Шаблон:Cvt as well, with safety and other freight service concerns voiced by the track owner, Union Pacific Railroad.[121] This essentially halts the plan to provide a higher-speed rail service on this corridor in the near future.
Minnesota
The Northern Lights Express project, in the planning stages and proposed to begin construction in 2017, would upgrade the BNSF trackage between Minneapolis and Duluth to support service up to Шаблон:Cvt.[122]
Other higher-speed rail proposals are periodically considered, but would need to pass through neighboring states, which have thus far not agreed to cooperate. Minnesota transportation planners proposed a higher-speed rail service called the River Route, with top speeds of Шаблон:Cvt, between Minneapolis–Saint Paul, Minnesota, and Chicago, Illinois, via Milwaukee, Wisconsin, which follows the Empire Builder route.[123] There is no current progress with the River Route project due to the cancellation of the funding in Wisconsin.
Another alternative that has been discussed is to have a new route that heads south to Iowa to join the rail link from Iowa to Chicago.[124] There was a report in 2011 that Iowa would halt its involvement in high/higher-speed rail projects.[125] However, the Iowa Department of Transportation and Illinois Department of Transportation continue to pursue the study of rail link between Chicago and Omaha, Nebraska, through Iowa with top speeds of Шаблон:Cvt.[126][127] Therefore, the status of the proposal to link Minneapolis–Saint Paul with Chicago via Iowa is unknown.
New York
In 1998, New York State initiated a $185 million program in partnership with Amtrak to increase the speeds of the Empire Service to Шаблон:Cvt by reconstructing all seven gas-turbine Turboliner trainsets, originally built in 1976–1977, to the new RTL-III specification. The reconstructed trains, coupled with track improvements, would cut the travel time between New York City and Albany by 20 minutes. However, the project ran into many problems including issues with the trains and the unsuccessful implementation of required track improvements.[128] New York ended the rehabilitation program in 2005 after spending $70.3 million.[129] Fallout over the program led to litigation between New York and Amtrak; Amtrak would eventually pay New York $20 million and commit to funding $10 million in track improvements.[130] New York auctioned off its surplus Turboliners in 2012 for $420,000.[131]
Ohio
Шаблон:Main The Ohio Hub, a rail improvement project proposed by the Ohio Department of Transportation, is aimed at revitalizing passenger rail service in the Ohio region. The proposal was to increase the top speeds to Шаблон:Cvt in the network connecting Cleveland, Columbus, and Cincinnati, commonly referred as the 3-C corridor.[132] The project is currently in an unknown state after the U.S. government rescinded the federal funding from Ohio and redirected it to other states.[117]
Wisconsin
In October 2009, the Wisconsin Department of Transportation adopted the Connections 2030 plan which is the long-range plan for state transportation needs. The plan includes Wisconsin Rail Plan 2030, the twenty-year plan to improve the state railroad system by 2030. In the rail plan, there is a multi-phase project to upgrade the rail service from Chicago, Illinois, to Milwaukee and Madison, Wisconsin, with top speeds of Шаблон:Cvt. The latter phases of the project will expand the same service to Minneapolis–Saint Paul in Minnesota and another route to Green Bay, Wisconsin.[133] There was a reaction against the project in 2010, and the $810 million grant the state originally received for the project from the federal government was rescinded.[117] As of 2012, the rail plan is postponed indefinitely.[134]
Current efforts
Baltic states
The three Baltic states have been working with the European Union as part of the Trans-European Transport Networks (TEN-T) initiative on a study to build a higher-speed rail line in the Rail Baltica corridor to connect Warsaw, in Poland, and Tallinn, in Estonia.[135]
Bangladesh
Bangladesh Government has taken initiatives to develop high-speed rail (HSR) in between its two major cities – Dhaka, the National Capital City and Chattogram (former Chittagong), the second largest and the principal Port City of the country. Bangladesh Railway (BR), the Government-owned and-managed transportation agency of the country, signed a contract of BDT 102 crore on 31 May 2018 with a Consortium of China Railway Design Corporation (CRDC), a Chinese Company and Mazumder Enterprise (ME), a Bangladeshi Pvt. Ltd. Company for feasibility study and detailed design for construction of proposed Dhaka-Chattogram via Cumilla/Laksam HSR line.
With 320.79 km length, Dhaka-Chattogram is the main business corridor and life line of BR, and at present, the railway route is a circuitous way through Tongi-Bhairab Bazar-Brahmanbaria-Cumilla-Chattogram. The proposed shorter route, which would be Dhaka-Cumilla/Laksham-Chattogram, will cut short the length by about 91 km, making the total length around 230 km. The expected speed of the proposed HSR would be above 250 km/h (yet to determine) and it would take less than one hour to reach Chattogram from Dhaka, which currently takes more than five hours. Under the 18-month contract, the Consortium's responsibilities will include identifying alternative alignments, assessing the viability of the project, preparing detailed engineering design, and cost estimation. [136]
Canada
For a rail route to connect Windsor, Ontario to Detroit, Michigan in the United States, a higher-speed rail plan was proposed as an alternative after a study on the Windsor to Quebec City route in Canada was to consider only high-speed rail with top speeds of Шаблон:Cvt or more. Politicians in Windsor area proposed in 2012 that having higher-speed rail connection between Windsor and Detroit must be part of the consideration.[25][137][138]
Another feasibility study is ongoing as part of the Northern New England Intercity Rail Initiative to connect between Boston and Montreal trains at top speeds of Шаблон:Cvt.[139]
Greece
A project to modernize railway network in Greece is ongoing. A new Шаблон:Convert alignment between Tithorea and Domokos is designed to avoid the mountainous part. The new line will have speeds of Шаблон:Cvt.[79]
India
In October 2013, the Minister of Railways announced at the two-day international technical conference on High Speed Rail Travel; Low Cost Solution that the focus of India's rail improvement is to implement a lower cost solution to meet the immediate needs by providing higher-speed rail services as an incremental step before the dedicated track high-speed rail can be achieved. India's higher-speed rail will be in the range of Шаблон:Cvt.[7] On 3 July 2014, a trail run with the new top speeds of Шаблон:Cvt was successfully completed on a journey of Шаблон:Cvt between Delhi and Agra. The new service, operational since 5 April 2016, cut the travel time from 126 minutes (compared to standard trains) with a top speed of Шаблон:Convert to 99 minutes.[140]
In 2019 the government approved 3 rapid regional railways including Delhi–Meerut Regional Rapid Transit System with speeds up to 160 km/h.[141]
in June 2020 the government of Kerala approved the Thiruvananthapuram–Kasargode Semi High Speed Rail Corridor or Silver line, a Semi-High speed rail line connecting the state.[142]
in July 2021, The Government announced plans of making 10 new Vande Bharat Express Lines connecting Over 40 cities. This is planned to be done by 2022.[143]
Malaysia
The KTM ETS is an inter-city rail service operated by Keretapi Tanah Melayu Berhad utilizing electric multiple units. The KTM ETS is the second electric train service to be operated by the Malaysian railway company, after the KTM Komuter service.
Commencing in August 2010, the ETS is the fastest metre gauge train service in Malaysia and operates along the electrified and double-tracked stretch of the West Coast Line between Шаблон:Rws and Шаблон:Rws on the Malaysia-Thai border by the Malaysian national railway operator, Keretapi Tanah Melayu.
The rail service is operated by KTM Intercity Division. It was previously operated by ETS Sendirian Berhad, a fully owned subsidiary of Keretapi Tanah Melayu Berhad. The operation speed for this train is 140 km/h with the maximum possible speeds for the trains at 160 km/h.
New Zealand
Advocacy group Greater Auckland proposed the Regional Rapid Rail initiative in 2017, including tilt trains with a maximum speed of 160 km/h.[144] This network would link Auckland with Hamilton, Tauranga and Rotorua. In December 2018, the Government of New Zealand committed funding to reintroducing a five-year trial rail service between Papakura in southern Auckland to Hamilton, starting in 2020.[145]
Panama
China claimed to invest capitals into 160 km/h rail corridor, total length would be 491 km.[146]
Philippines
The state-owned Philippine National Railways plans to rebuild its historic South Main Line from Manila to the Bicol Region in the southeastern tip of Luzon. The agency will build Шаблон:Convert of track, with the main line itself leading to Matnog, Sorsogon and a spur line leading to Batangas City. It will be a standard-gauge railway served by Chinese-built diesel multiple units with a maximum speed of Шаблон:Cvt and an average speed of Шаблон:Cvt including stops.[147] The project will start construction in mid-2020 and is set to open partially by 2022.
In January 2022, PNR general manager Junn Magno defined the agency's future high-speed rail projects to be electrified railways with a maximum speed of at least Шаблон:Convert. The high power costs and resulting expensive ticket prices resulted in the operation of high-speed rail in the country to be marked as infeasible. The agency then resorted to semi-high speed express trains for its new standard-gauge lines.[148]
United States
This is a partial list of ongoing higher-speed rail projects from the East Coast to the West Coast.
Corridor / Segment | Length | Top speed | Avg speed | Current status | Note |
---|---|---|---|---|---|
Boston, MA – Springfield, MA – Montreal, QC, Canada | Шаблон:Cvt | Шаблон:Cvt | Шаблон:Cvt | Feasibility study | A study of higher-speed rail options with top speeds of Шаблон:Cvt in 3 sections along the route.[139][149][150] |
New York City – Niagara Falls, NY | Шаблон:Cvt | Шаблон:Cvt | Шаблон:Cvt | Tier 1 EIS | Fully electrified track, and straightened Hudson River route. SeeШаблон:NoteTag |
Washington, DC – Richmond, VA | Шаблон:Cvt | Шаблон:Cvt | Tier 2 EIS | [151][152][153] | |
Richmond – Newport News, VA | Шаблон:Cvt | Tier 1 EIS | [153] | ||
Richmond – Norfolk, VA | Шаблон:Cvt | Tier 1 EIS | [153] | ||
Richmond, VA – Raleigh, NC | Шаблон:Cvt | Шаблон:Cvt | Шаблон:Cvt | Tier 2 EIS | Top speeds from Richmond, VA, to south of Petersburg, VA, will be Шаблон:Cvt and changed to Шаблон:Cvt after that.[154] |
Raleigh – Charlotte, NC | Шаблон:Cvt | Шаблон:Cvt | Construction | [153] | |
Charlotte, NC – Atlanta, GA | Шаблон:Cvt | Шаблон:Cvt | Tier 1 EIS | A Шаблон:Cvt option is considered along with Шаблон:Cvt high-speed rail.[153] | |
Atlanta, GA – Macon, GA – Jacksonville, FL | Шаблон:Cvt | Шаблон:Cvt | Шаблон:Cvt | Tier 1 EIS | SeeШаблон:NoteTag |
Atlanta, GA – Chattanooga / Nashville, TN – Louisville, KY | Шаблон:Cvt | Шаблон:Cvt | Шаблон:Cvt | Tier 1 EIS completed | SeeШаблон:NoteTag |
Atlanta, GA – Birmingham, AL | Шаблон:Cvt | Шаблон:Cvt | Шаблон:Cvt | Tier 1 EIS | SeeШаблон:NoteTag |
Atlanta, GA – Columbus, GA | Шаблон:Cvt | Шаблон:Cvt | Шаблон:Cvt | Feasibility Study | Higher-speed rail was one of the 3 alternatives in the feasibility study completed in 2014. Funding is not yet available to begin Tier 1 EIS phase.[155] |
Columbus, OH – Fort Wayne, Indiana – Chicago, IL | Шаблон:Cvt | Шаблон:Cvt | Feasibility Study | Initial operating speeds up to Шаблон:Cvt.[156] Study funded by local governments and organizations, not by state governments.[157] | |
Ann Arbor, MI – Traverse City, MI | Шаблон:Cvt | Шаблон:Cvt | Feasibility Study | Three alternatives with 2 higher-speed rail alternatives at top speeds of Шаблон:Cvt and Шаблон:Cvt[158] | |
Kalamazoo, MI – Albion, MI | Шаблон:Cvt | Шаблон:Cvt | Operation starts May 25, 2021 | [159] | |
Chicago, IL – Milwaukee, WI | Шаблон:Cvt | Шаблон:Cvt | Шаблон:Cvt | Environmental Assessment | The top speeds of Шаблон:Cvt is one of the alternatives under consideration.[160] |
Chicago, IL – Omaha, NE (via Iowa) | Шаблон:Cvt | Шаблон:Cvt | Tier 1 EIS | [126][127] | |
Minneapolis – Duluth, MN | Шаблон:Cvt | Шаблон:Cvt | Environmental Assessment completed | Known as Northern Lights Express, received Finding Of No Significant Impact on Tier 2 Environmental Assessment in February 2018, and cleared to seek federal funding for design and construction.[161] | |
St. Louis, MO – Kansas City, MO | Шаблон:Cvt[162] | Шаблон:Cvt | Construction | New sidings between Jefferson City and Lee's Summit for Шаблон:Cvt service[163] | |
Oklahoma City, OK – San Antonio, TX | Шаблон:Cvt | Шаблон:Cvt | Feasibility Study | SeeШаблон:NoteTag | |
Dallas/Fort Worth – Houston, TX | Шаблон:Cvt | Шаблон:Cvt | Feasibility Study | SeeШаблон:NoteTag | |
Phoenix – Tucson, AZ | Шаблон:Cvt | Шаблон:Cvt | Шаблон:Cvt | Tier 1 EIS completed | Three alternatives finalized by Arizona Department of Transportation.[164] The Yellow Corridor Alternative was selected as the preferred alternative at the completion of Tier 1 EIS.[165] |
Notes Шаблон:NoteFoot |
Proposed routes
In addition to ongoing projects, there are proposed routes that have not reached the feasibility study stage yet. In Pennsylvania, a rail advocacy group started fund raising efforts in 2014 to obtain $25,000 for a preliminary study and additional $100,000 for feasibility study of the route from Erie to Pittsburgh. The proposal is for Шаблон:Cvt express train services to directly link the two cities. An alternative is to have intermediate stops in Ohio cities including Ashtabula, Warren, and Youngstown before heading back to New Castle, Pennsylvania.[166]
In Ohio, a rail advocacy group works with local political leaders in Ohio, Indiana and Illinois to consider a higher-speed rail line from Cincinnati to Chicago. This is in response to another advocacy group in Indiana that gained funding for the Columbus, Ohio – Fort Wayne – Chicago route that is already in feasibility study stage. The group persuaded the Hamilton County government in Ohio to advocate for the study.[167] The county commissioners unanimously voted in September 2014 to pursue a feasibility study. As a possible route that goes through the states of Kentucky and Indiana, the county expects that Ohio-Kentucky-Indiana Regional Council of Governments will help fund a feasibility study.[168]
In Michigan, a feasibility study sponsored by an environmental group is in progress for a new rail line between Detroit and Grand Rapids. The proposal is to have trains running at speeds between Шаблон:Convert. The state transportation department is interested in the study but is not ready to move beyond this study.[169]
In Texas, the East Texas Corridor Council proposed a higher-speed rail route between Longview and Dallas. The trains will operate at speeds of Шаблон:Convert and Шаблон:Cvt.[170]
Vietnam
In 2018, Vietnam planned to build a higher-speed rail line in the northern part of the country to link between Haiphong, Hanoi, and Lào Cai which is then connected to China. The Шаблон:Convert line will run parallel to the existing regular speed railway. The top speeds for the new services will be up to Шаблон:Cvt.[171]
See also
References
Шаблон:Public transport Шаблон:Higher-speed rail
- ↑ Шаблон:Cite news
- ↑ "H.R.4361 – National High Performance Passenger Rail Transportation-Oriented Development Act of 2012Шаблон:Dead link" 112th Congress of the United States. Retrieved 10 September 2013.
- ↑ Шаблон:Cite news
- ↑ [1] Шаблон:Dead link
- ↑ 5,0 5,1 5,2 Шаблон:Cite web
- ↑ Шаблон:Cite report
- ↑ 7,0 7,1 7,2 Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ 11,0 11,1 Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite journal
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ 19,0 19,1 19,2 Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ 21,0 21,1 21,2 21,3 21,4 Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ 24,0 24,1 Шаблон:Cite journal
- ↑ 25,0 25,1 Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite book
- ↑ 30,0 30,1 Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ 35,0 35,1 Шаблон:Cite web
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ http://www.jernbaneverket.no/Jernbanen/Banene/Gardermobanen/ Шаблон:Webarchive; in Norwegian
- ↑ http://www.nmj.no/1000366.html Шаблон:Webarchive; in Norwegian
- ↑ e.g. http://www.sb.no/nyheter/nyheter/for-hoy-togtut/s/2-2.428-1.7540611 Шаблон:Webarchive; in Norwegian
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:CA rail schematics
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite book
- ↑ 49,0 49,1 Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ http://www.jernbaneverket.no/Sikkerhet/Planovergangar/Der-vei-krysser-jernbane/ Шаблон:Webarchive; in Norwegian
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite journal
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite book
- ↑ "QR Tilt Train Sets Australian Rail Speed Record" Railway Digest June 1999 page 15
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ 79,0 79,1 Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ 89,0 89,1 Шаблон:Citation
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ 98,0 98,1 Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite press release
- ↑ 110,0 110,1 Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Citation
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ 117,0 117,1 117,2 Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ 126,0 126,1 Шаблон:Cite web
- ↑ 127,0 127,1 Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ 139,0 139,1 Шаблон:Cite report
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite AV media
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ 153,0 153,1 153,2 153,3 153,4 Шаблон:Cite report
- ↑ Шаблон:Cite report
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite bookШаблон:Dead link
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news