Английская Википедия:Iloilo–Guimaras–Negros–Cebu Link Bridge
Шаблон:Sources exist Шаблон:Infobox bridge The Iloilo–Guimaras–Negros–Cebu Link Bridge is a planned network of bridges in the Visayas in the Philippines connecting the islands of Panay, Guimaras, Negros, and Cebu.
One of the core projects of the Duterte Administration's "Build, Build, Build" Program, the bridge network aims to provide increased inter-connectivity in the provinces of Western and Central Visayas, to stimulate economic activity in the region and help in the decongestion of Metro Manila in the process. Considering the width of the Iloilo Strait, Guimaras Strait, and Tañon Strait, all three bridges in the network, if completed, will be much longer than the longest bridge in the country, the 8.9-km Cebu–Cordova Link Expressway (CCLEX) between the islands of Mactan and Cebu.[1]
History
There were several proposals to build bridges linking the islands in Visayas. In 1999, the Japan International Cooperation Agency created a master plan for two bridges connecting Panay, Guimaras, and Negros; the first bridge, spanning Шаблон:Convert, was planned to link Leganes, Iloilo to Buenavista, Guimaras, while the second bridge also measuring Шаблон:Convert was meant to connect San Lorenzo, Guimaras to Pulupandan, Negros Occidental. The Department of Public Works and Highways conducted a study on building bridges that would connect Panay, Guimaras, and Negros which were projected to require a Шаблон:Philippine peso budget if the bridges are to be built.[2]
In 2013, Governors Arthur Defensor Sr. of Iloilo and Alfredo Marañón Jr. of Negros Occidental made an alternative proposal that would bypass Guimaras and directly link Banate (in Iloilo) and E.B. Magalona (in Negros Occidental) via a Шаблон:Convert bridge.[2]
A feasibility study conducted by the Philippine government that concluded in May 2018 divided the project into three phases: Phase I would start in Leganes, Iloilo and go to Buenavista, Guimaras; Phase II will be the Guimaras–Negros portion; while Phase III the Negros–Cebu part.[3] Public Works and Highways secretary Mark Villar announced in August 2018 that Phase I of the project will likely start in early 2019, with the ₱27.156 million needed for the project to be provided by the Chinese government through a grant.[4] This proposal did not actualize and the local Philippine governments are now negotiating an alternative proposal from South Korean interests.[5]
See also
References
- ↑ Шаблон:Cite news
- ↑ 2,0 2,1 Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Ошибка цитирования Неверный тег
<ref>
; для сносокPanayNews
не указан текст - ↑ Daily Guardian:May 5th, 2022:korea lends us56.6m for panay guimaras negros bridges construction to start in 2025/