Английская Википедия:Agargaon metro station
Шаблон:Short description Шаблон:Infobox station Agargaon (Шаблон:Lang-bn, romanised: Agargao) is an elevated metro station of the Dhaka Metro's MRT Line 6. It is located in Agargaon, and was opened on 29 December 2022.[1][2]
History
The Agargaon Metro Station was constructed under "Package CP-03". The notification of application for construction of raised bridges for stations and railways was published on 30 June 2015 and the last date for submission of applications was 9 September 2015. Italian-Thai Development Public Company Limited gets work contract for "Package CP-03". The agreement document was sent to the ministry on 29 March 2016 for NBR investigation and law and parliamentary investigation. The signing ceremony for the agreement package was held on 3 May 2017 at the Pan Pacific Sonargaon Hotel in Dhaka. Construction work started on 2 August 2017.[3][4] It was inaugurated on 29 December 2022 and opened on the next day.[5]
Station
Station layout
G | Path level | Exit / Entry |
L1 | Between | Rent control, station agent, metro card vending machine, crossover |
L2 | Side platform | Doors will open on the left Шаблон:Access icon | |
Platform 1 Southbound |
Towards → Train Terminates Here (To be further extended to Kamalapur in the near future) | |
Platform 2 Northbound |
Towards ← Uttara North next station is Shewrapara | |
Side platform | Doors will open on the left Шаблон:Access icon | ||
L2 |
Connectivity
Bangladesh Road Transport Corporation provides shuttle bus service from the station to Motijheel via Farmgate and Shahbag.[6]
References
External links
Шаблон:MRT Line 6 Шаблон:Dhaka Metro Rail
- Английская Википедия
- Страницы с неработающими файловыми ссылками
- Dhaka Metro stations
- Railway stations opened in 2022
- 2022 establishments in Bangladesh
- Railway stations in Bangladesh opened in the 2020s
- Страницы, где используется шаблон "Навигационная таблица/Телепорт"
- Страницы с телепортом
- Википедия
- Статья из Википедии
- Статья из Английской Википедии