The Airport Express Line or Orange Line is a Delhi Metro line from New Delhi to Yashobhoomi Dwarka Sector - 25, linking Indira Gandhi International Airport. The total length of the line is Шаблон:Cvt,[1] of which Шаблон:Cvt is underground[2] and Шаблон:Cvt, from Buddha Jayanti Park to Mahipalpur, is elevated.[3]

On 27 June 2013 Reliance Infrastructure Ltd. announced to DMRC that they are unable to operate the line beyond 30 June 2013.[4] Following this, DMRC took over operations of Airport Express line from 1 July 2013 with an operations and maintenance team of 100 officials to handle the line.[5]

The line runs at a speed of Шаблон:Cvt providing for a 19-minute journey from New Delhi to IGI Airport.[6][7] In 2023, the operational speed of Delhi Airport Express was increased to Шаблон:Cvt from Шаблон:Cvt, making it the fastest metro line in the country. [8]

History

Шаблон:Main The first tenders for line construction were awarded in September 2007.[9] On 23 January 2008, the DMRC awarded a 30-year build-operate-transfer PPP contract to the Reliance Energy-CAF consortium.[10] However, DMRC paid for half of the construction cost and executed tunneling and civil works.[10]

It was built at a cost of Шаблон:INR 57 billion,[11] of which Reliance Infra paid Шаблон:INR 28.85 billion (U$580m),[12] Reliance Infra will also pay fees on a Revenue-share model[11][13]

The elevated section of the Airport Express Line was built over eight busy roads which carry a heavy volume of traffic, including the Ring Road, National Highway 48, Ridge Road and Sardar Patel Marg.[14][15]

Originally scheduled to open by 31 August 2010, well in time for the 2010 Commonwealth Games, the line finally opened on 23 February 2011 at 2 pm[16] after missing four previously set deadlines.[17] The DMRC fined Reliance Infra Шаблон:INR 37.5 lakh every day from 30 September, and Шаблон:INR 75 lakh every day from 31 October for repeatedly missing the deadlines.[17] The Aerocity and Dhaula Kuan stations opened on 15 August 2011.

Services were suspended on 8 July 2012 due to a series of technical problems,[18] including cracks in the girders, the iron beams that support the tracks; dislocated bearings that support the train; defective tracks and water seepage in tunnels.[19] The Urban Development Ministry subsequently disclosed that several clips in the underground section have been seriously damaged and it will take at least 5 months to rectify the problem.[20] A joint inspection by Delhi Metro and Reliance Infrastructure team has revealed that 540 bearings need rectification and some girders which have cracked also need to be recast.[21]

The line reopened on 23 January 2013, operating at a reduced speed of Шаблон:Cvt. At the reduced speed the time travel from New Delhi Metro Station to Airport was around 40–50 minutes. After inspection by the DMRC and various other experts, in mid-2014, DMRC reinstated 80 km/h speeds on the line.[22]

At the original speed of Шаблон:Cvt, the journey from New Delhi Metro Station to Airport takes just 20 minutes.

In 2022, the DMRC decided to increase the operating speed from 80 km/h to 120 km/h by 2023 reducing travel time from the current 20 minutes to less than 15 minutes.[23]

On 17 September 2023, the IICC - Dwarka Sector 25 metro station opened to the public, extending the Airport Express Line two kilometers into the India International Convention and Expo Centre (also known as Yashobhoomi), which opened on the same day. The station is underground within the new convention center, with entrances providing a quick connection to current and future exhibition halls as well as an indoor arena, among other attractions at the new convention center.[24]

Map

Airport Express Line (Delhi Metro)
Airport Express Line (Delhi Metro)

Stations

Шаблон:Main

Файл:Delhi Airport Metro standing on New Delhi metro station.jpg
New Delhi metro station

All the six metro stations on the line are known as City Airport Terminals (CATs). They are fitted with state-of-the-art gadgets like explosive detectors, large x-ray baggage scanners, under vehicle scanners, quick reaction teams and dog squads to ensure full security of commuters and baggage alike. The stations have full-height platform screen doors to prevent untoward incidents and to provide better air conditioning. All the stations are secured with a network of CCTV cameras which relays live images to the station control room, security control room and operations control centre. The security of the airport line is handled by Central Industrial Security Force who also handles the safety of all the stations of DMRC.

All the stations are disabled friendly so that people on wheelchairs can access them with facilities such as stations with ramps having a mild slope leading to elevators, the elevators are specially designed for the convenience of physically challenged people and capable of carrying stretchers, help call points are located at various points of stations and trains so that in case of any emergency, a disabled person can seek help by just pressing the call buttons. The elevators can be used by visually impaired persons with the elevator buttons having Braille letters.[25]

style="text-align:center; background:#Шаблон:Rail color;" colspan="8" | Delhi Airport Express Line stations
# Station Name Opening Interchange Connection Station Layout Depot Connection Depot Layout
English Hindi
1 Шаблон:Stl नई दिल्ली 23 February 2011 Шаблон:Rcb
New Delhi Railway Station
Underground None None
2 Шаблон:Stl शिवाजी स्टेडियम 23 February 2011 None Underground None None
3 Шаблон:Stl धौला कुआँ 15 August 2011 Шаблон:Rcb Elevated None None
4 Шаблон:Stl दिल्ली एरोसिटी 15 August 2011 Шаблон:Rcb
(Phase 4 - Under Construction)
Underground None None
5 Шаблон:Stl आईजीआई एअरपोर्ट 23 February 2011 IGI Airport Terminal-3 Underground None None
6 Шаблон:Stl द्वारका सेक्टर २१ 23 February 2011 Шаблон:Rcb Underground Dwarka Sector 21 Depot At Grade
7 Yashobhoomi Dwarka Sector - 25 यशोभूमि द्वारका सेक्टर - २५ 17 September 2023 None Underground None None

Operations

While it was initially planned to run trains 24 hours a day with a frequency of 10 minutes, train services, Шаблон:As of, operate from 4:45 am to 11:30 pm,[26] with a 15-minute frequency.

While originally expected to carry 42,000 people daily by 2011 as per detailed project report prepared by DMRC, actual ridership has hovered around 20,000.[27] Within a few years, due to several initiative and fare reduction by the DMRC, ridership crossed 50,000 per day.[28]

Fare

The fare for commuting has been fixed at Шаблон:INRConvert for travel from New Delhi metro station to IGI Airport / Dwarka Sector 21.[29] There are also passes available for 30 and 45 trips costing Шаблон:INRConvert and Шаблон:INRConvert respectively for travelling from New Delhi to IGI Airport.[29] This keeps the per trip cost at Шаблон:INRConvert and Шаблон:INRConvert respectively and are valid for one calendar month. There are other such passes available for different origin destination combinations. Stored Value cards are also on offer which will give 10% discount on all the trips. These airport express fares are cheaper than any other modes of transport to reach airport.[30]

Infrastructure

Siemens Mobility is providing signalling, power transmission, and baggage handling system enabling passengers to check in with baggage at the New Delhi metro station and Shivaji Stadium, with 1200 passengers per hour capacity.[31][32] The €34 million project was expected to be completed by 2010 in time for the Commonwealth games but it did not manage to meet the deadline. Alcatel is supplying the communications systems.[12] Indra Sistemas is providing the ticket machines. Faiveley is providing the platform screen doors. Bluestar and Honeywell is the control and automation provider for Station Management System (SMS). Bluestar is the main BEMS system provider.

The line will be the first line in the country to be mapped on Geographic Information System to enhance safety, maintenance and traffic regulation and will help in mobilising emergency services in case of an accident.[33] In April 2020, DMRC published a notice for procuring a SCADA System at the line's Operational Control Centre (OCC)[34]

Rolling stock

Файл:DelhiMetro AirportExpress 20111214.jpg
Inside an Airport Express train
Файл:Board showing next station in Delhi Airport Metro Express.jpg
Board showing next station in Delhi Airport Metro Express

Eight six-car trains supplied by CAF Beasain were imported from Spain.[1] CAF holds 5% equity in the DAME project and Reliance Infrastructure holds the remaining 95%.[12] The trains on this line are of a premium standard and have in-built noise reduction features for a noise-free ride with padded fabric seats. The trains are fitted with an event recorder which can withstand high levels of temperature and impact and the wheels have flange lubrication system for less noise and better riding comfort.[33]

Based on the consultancy by MTR, the interior design of the rolling stock is highly similar to that of Hong Kong's Airport Express line, which uses very similar trains.

Tracks

To ensure safety, the tracks are fitted with RHEDA-2000 signalling technology, which theoretically allows trains to travel at up to 350 km/h (nearly three times the actual maximum speed of current trains).[35] The entire 22.7 km route is ballast-less track, which costs 40–50% more than normal train tracks, but does not take longer to lay than traditional tracks. The rails rest on rubber pads on the concrete sleepers for less noise.[35]

The 7 km elevated section from Buddha Jayanti Park to Mahipalpur has been built with 25 m long girders for the first time in India.[3] The 504 girders weigh 120 tons each and were cast in Mahipalpur and transported on 35 m long trailers with 64 tyres.[3]

Check-in and cloak room facility

The line has the first check in facility outside an airport in South Asia.

Passengers flying with Air India and Vistara which use T3 terminal as base of operations can check in at the New Delhi Metro Station. The check-in can be done anytime before 6 hours to 2 and half hours before departure time. Passengers flying for international flights also started checking in as this facility from 22 February 2012, however that has been stopped since COVID.

Cloak room facilities are available as well, with rates beginning at Rs 50 for the first 4 hours for luggage weighing less than 20 kilograms, to Rs 350 for 24 hours for luggage weighing more than 30 kilograms.[36]

Smartphone as ticket

Delhi Metro Rail Corporation has introduced QR code-based ticketing facility for travel on Airport Express Line from September 2018.[37] The system will enable passengers to purchase tickets using 'Ridlr mobile App' without physically coming to the metro station. Airport Line stations even have QR-enabled entry and exit gates for commuters.

WiFi service

The Airport Express line introduced WiFi services at all six stations along the route on 13 January 2012. It was the first line of the Delhi Metro to provide WiFi services. Connectivity inside metro trains travelling on the route is expected in the future. The WiFi service is provided by YOU Broadband India Limited.[38]

Post office

The post office will have all basic postal services like speed post, e-post, express parcel, registered post, postal stamps and revenue stamps on all working days from 10 am to 4 pm.[39]

Postal services can be availed by both commuters and non-commuters as the counter is located at the non-paid area of New Delhi metro station's concourse level.[39]

Movie shooting and promotional venue

Ever since Shah Rukh Khan boarded the Airport Express line to promote "Ra.One", the new line has become the cynosure of most Bollywood promotions in the capital. Actor Abhishek Bachchan, along with co-stars Sonam Kapoor and Neil Nitin Mukesh headed to the Airport line to promote his movie "Players" in Delhi, and also attempted to break a safe while travelling from one station of the Airport line to another.

  • Promotions
  1. SRK for 'Ra.One' - Airport Express
  2. SRK, Priyanka Chopra, Farhan Akhtar, Ritesh Sidhwani for 'Don 2' - Airport Express New Delhi Station
  3. Manoj Bajpayee, Tia Bajpai and Maqbool Khan for 'Lanka' - Airport Express line
  4. Emraan Hashmi for 'The Dirty Picture' - Rajiv Chowk metro station
  5. Star cast of 'Players' - Airport Express Line
  • Shootings
  1. 'Jannat 2' - Shivaji Stadium metro station
  2. 'Kismat Love Paisa Dilli'- Shivaji Stadium metro station
  3. Tamil Film 'Thaandavam' - Shivaji Stadium metro station

See also

Шаблон:Portal bar

References

Шаблон:Reflist

External links

Шаблон:Commons Шаблон:Commons category inline

Шаблон:Delhi Metro Шаблон:Delhi & NCR Metro stations Шаблон:Rapid transit in India Шаблон:Rapid transit in Asia

Шаблон:Authority control