Английская Википедия:Alterra Power

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Infobox company

Alterra Power Corp. a subsidiary of Innergex Renewable Energy Inc., is a diversified renewable power generation company based in Vancouver, British Columbia, Canada. It was formed in 2011 through the merger of Magma Energy Corp. and Plutonic Power Corp. It develops, owns, acquires and operates hydroelectric, wind, solar energy and geothermal projects. On February 6, 2018, Innergex Renewable Energy Inc. completed the acquisition of Alterra including all its assets.[1][2]

Файл:Toba Montrose Run of River Hydro Power Plant Intake.jpg
Toba Montrose Run of River Power Plant Intake

Merger

On 7 March 2011, it was announced that Magma Energy and Plutonic Power would merge to create Alterra Power Corp.[3] Magma Energy was renamed Alterra Power and each shareholder of Plutonic Power received 2.38 shares of Magma for each Plutonic share held. At the time, the merged company owned two geothermal power plants in Iceland, and one in Nevada (since sold), one run of river hydro plant and one wind farm in British Columbia and an option on a solar project in Ontario.

Power plants

Name Technology Location Nameplate Capacity
Toba Montrose Run of river British Columbia, Canada 235 MW
Kokomo Solar power Indiana, USA 7 MW
Dokie 1 Wind power British Columbia, Canada 144 MW
Shannon Wind power Texas, USA 204 MW
Spartan Wind power Michigan, USA 13.5 MW

Projects

Toba Montrose Hydro

East Toba River (123MW) and Montrose Creek (73MW) are two run-of-river hydroelectric plants 18 km apart, they have operated since in 2010 with a combined capacity of 196 MW and generate an average of 720 GWh of electricity annually, which is contracted to B.C. Hydro until 2045.

Upper Toba Valley

The Upper Toba Valley Hydroelectric project[4] originally planned two renewable power facilities constructed 90 km north of Powell River, BC at the headwaters of Toba Inlet the first is on Jimmie Creek which flows west into Toba River and the second on the Upper Toba River. Installed capacity of the two facilities was to be 124 MW with an expected annual energy generation of 316 GW hr/yr. Alterra received an Energy Purchase Agreement from BC Hydro to construct the Upper Toba facility.[4] In 2013 Alterra also received an Energy Purchase Agreement from BC Hydro to construct the 62MW Jimmie Creek facility.[5] In 2016 Alterra Power Corp. announced that the Jimmie Creek facility had achieved its full output of 62 MW.[6] It is located at Шаблон:Coord

Solar power expansions

In early 2011, Plutonic Power agreed, together with GE Energy financial Services, to purchase three proposed photovoltaic power plants in Ontario from First Solar. The three plants will have a total capacity of 50 MW, divided between Amherstburg (10MW), Belmont (20MW) and Walpole (20MW). This represents a first venture into solar power for Plutonic Power although engineering, procurement, construction and operation will still be provided by First Solar.[7]

HS Orka's controversy

In 2010, during the Icelandic financial crisis, Magma Energy acquired 98.5% of shares in the Icelandic geothermal power company HS Orka.[8] The deal created an opposition in Iceland. On May 21, 2010 Icelandic singer Björk wrote an open letter in the newspaper Reykjavík Grapevine, calling on the Icelandic government to "do everything in its power to revoke the contracts with Magma Energy".[9] The deal was approved by the Icelandic Government.[10] In 2016, Alterra owned 67%, while the Icelandic pension funds held 33%.[11] In 2019 Alterra sold off its shares in HS Orka to Macquarie Infrastructure and Real Assets (MIRA).[12]

References

Шаблон:Reflist

External links

Шаблон:Vancouver Corporations