Английская Википедия:Appledore railway station

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short descriptionШаблон:For Шаблон:Use dmy dates Шаблон:Use British English Шаблон:Infobox station

Appledore railway station is a Grade II listed station east of Appledore in Kent, England. It is on the Marshlink line, and train services are provided by Southern.

The station was constructed in 1851 by the South Eastern Railway and designed by William Tress. It became a junction station in 1881 when a branch line opened to Lydd and New Romney; this closed to passengers in 1967 following the Beeching Report, though the line remains open for goods traffic to Dungeness Nuclear Power Station. Despite a recommendation in the report that Appledore should also close, it has remained open into the 21st century.

Name and location

Файл:171724 at Appledore station.jpg
A train stopping at Appledore, showing the staggered platforms

According to National Rail, this station's official name is Appledore (Kent), despite the other Appledore station in Devon having closed in 1917. On official documents and railway company websites, the station is referred to as Appledore (Kent), although signs at the station simply list 'Appledore'.[1][2]

The station is located almost two miles from Appledore village and Шаблон:Convert south of Шаблон:Rws, on the B2080, a local road. Owing to its distance from the village, it is in the Parish of Kenardington, not Appledore.[3][4]

Appledore is just north of a junction of a freight branch line running to Dungeness nuclear power station via Lydd.Шаблон:Sfn Appledore is also the start of the single track section of the Marshlink line, which runs through to Ore near Hastings with a passing loop at Rye.Шаблон:Sfn Along with several other stations on the line, the platforms are staggered.[3]

When British Rail introduced widespread provision of enamel totem station signs Appledore was one of very few that had some wooden ones fitted.[5]

History

The station was first proposed by the South Eastern Railway (SER) in June 1848 as a stop on the Ashford to Hastings line. That September, hop planters near Appledore petitioned the early construction of the line to help with harvest; however a formal decision to build a station was not taken until June 1850.Шаблон:Sfn

The station was designed, along with others along the line, by William Tress. The main building was built in an Italianate style with red brick with a Welsh slate roof.[3][6] It opened, along with the rest of the line on 13 February 1851.Шаблон:Sfn A pub, the Man of Kent Railway Tavern was built in 1853 on the opposite side of the road (now the B2080). It was rebuilt adjacent to the station in the late 19th century.[3] A waiting room was built in 1894, followed by a goods shed in 1896 and a station master's house the following year.Шаблон:Sfn

In 1881, Appledore was upgraded to become a junction station to cater for a branch line to Lydd, with new signals installed. The branch line opened on 7 December, and was further extended to New Romney in 1884.[3]Шаблон:Sfn The station platforms were widened in June 1887 to accommodate longer trains.Шаблон:Sfn A line was also proposed from Appledore to Шаблон:Rws, but this was never built.[3]

The SER subsequently merged with the London, Chatham and Dover Railway to form the South Eastern and Chatham Railway.Шаблон:Sfn It became part of the Southern Railway during the Grouping of 1923. The station then passed on to the Southern Region of British Railways on nationalisation in 1948.[3]

The goods shed was closed in 1963.[7] Appledore ceased to be a junction station for passengers when the branch line to Lydd and New Romney closed in 1967. However, it continued to be used for goods traffic to Dungeness.[8]

When Sectorisation was introduced in the 1980s, the station was served by Network SouthEast until the Privatisation of British Railways.

In 2001, the station building and goods shed were Grade II listed. The main building is in good condition and has been largely unaltered since its original 1851 construction.[6][7]

APTIS was once provided here until the booking office closed in the very early 1990s leaving no ticketing facilities. In 2016 Southern installed a new self-service ticket machine. The office buildings on the Ashford-bound platform are unused.

Accidents and incidents

Services

All services at Appledore are operated by Southern using Шаблон:Brc DMUs.

The typical off-peak service in trains per hour is:[10]

Previously, westbound trains ran as an express service to Шаблон:Stnlnk although this was changed to a stopping service to Eastbourne in the May 2018 timetable change.[11][12]

Шаблон:Rail start Шаблон:Rail line Шаблон:Disused Rail Insert Шаблон:Rail line Шаблон:S-end

References

Citations Шаблон:Reflist

Sources Шаблон:Refbegin

Шаблон:Refend

External links

Шаблон:Commons category Шаблон:Stn art lrnk

Шаблон:Kent railway stations Шаблон:TSGN and SE Stations