Английская Википедия:Avonmouth railway station

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:About Шаблон:Good article Шаблон:Use dmy dates Шаблон:Use British English Шаблон:Infobox station

Avonmouth railway station is located on the Severn Beach Line and serves the district of Avonmouth in Bristol, England. It is Шаблон:Convert from Шаблон:Rws. Its three letter station code is AVN. The station has two platforms, on either side of two running lines. Шаблон:As of it is managed by Great Western Railway, which is the third franchise to be responsible for the station since privatisation in 1997. They provide all train services at the station, mainly a train every 30 minutes to Шаблон:Rws and one every hour to Шаблон:Rws.

Шаблон:Bristol railway map The station was opened in 1877 by the Bristol Port Railway and Pier, a railway which ran along the River Avon from Шаблон:Rws to a pier at Avonmouth. The station, originally known as Avonmouth Dock, had a single platform, but was rebuilt with two platforms by the Great Western and Midland Railways in 1885 when they began services via Шаблон:Rws. The station was enhanced numerous times in the early part of the twentieth century, and by 1913 employed 72 staff. Facilities included a goods yard, signal box and engine shed.

The Severn Beach Line declined over the latter half of the twentieth century, with passenger numbers falling significantly. Goods services at Avonmouth ended in 1966, and all staff were withdrawn in 1967. Services had decreased to 10 per day each direction by 2005, but have since increased to a train every 30 minutes to Bristol and hourly to Severn Beach.

Description

Файл:2019 at Avonmouth station - platform 2.JPG
The wooden canopy covering platform 2 at Avonmouth

The station is located in the Avonmouth district of Bristol, an area of mixed industrial and residential usage. The station sits to the south of the junction of Gloucester Road and Portview Road, the tracks running to parallel to Portview Road and crossing Gloucester Road at a level crossing.[1][2] The station is on the Severn Beach Line from Шаблон:Rws to Шаблон:Rws, Шаблон:Convert from Temple Meads and Шаблон:Convert from Severn Beach.[3][4][note 1] The next station towards Temple Meads is Portway Park and Ride.[5] The next station towards Severn Beach is Шаблон:Rws.[6]

The station is on a north-west/south-east alignment, with two platforms separated by two running lines. The southern "up" platform, adjacent to the "Up Main" line, is used for trains towards Severn Beach. The northern "down" platform, adjacent to the "Down Main" line, is bidirectionally signalled, allowing it to be used by terminating trains and those heading towards Bristol. Both platforms have significant portions of their length fenced off, giving usable lengths of Шаблон:Convert for the southern platform and Шаблон:Convert for the northern.[7]

Facilities at the station are minimal – there is a wooden canopy and bench seating on the northern platform, with a small metal shelter on the southern. Timetable information is provided; help points show next train information and allow users to contact railway staff.[8] There is no ticket office or other means for buying or collecting tickets, however an electronic ticketing trial is to be rolled out at the station.[8][9] There is a car park with six spaces, as well as stands for four bicycles.[8] The nearest bus stops are Шаблон:Convert away on Avonmouth Road.[10]

The line through Avonmouth has a speed limit of Шаблон:Convert for locomotive-hauled trains and Шаблон:Convert for diesel multiple units. The line, which is not electrified, handles less than 5 million train tonnes per year, has a loading gauge of W6 and a route availability of 7.[7][11] Шаблон:As of, more than 110,000 passengers used Avonmouth station, making it the 1,635th busiest station in the country and the sixth busiest within the Bristol unitary authority area. This was an increase of 175% from the 2002–03 financial year, and reflected a general rise in usage of the Severn Beach Line.[12][13][note 2] The 2014-15 estimates of station usage saw a further increase of 8% to 120,000 making it the 1,614th busiest station in the country.[14]

Services

Файл:Avonmouth - GWR 166218 Severn Beach service.JPG
A Class 166 at Avonmouth with a Severn Beach service

All services at Avonmouth are operated by Great Western Railway using Шаблон:Brc Turbo DMUs.[15][9][16]

The typical off-peak service in trains per hour is:[17]

On Sundays, there is an hourly service between Bristol Temple Meads and Severn Beach with one train per day to and from Weston-super-Mare.

Services previously ran every 40 minutes to Bristol and every two hours to Severn Beach but were increased to half-hourly to Bristol and hourly to Severn Beach in the December 2021 timetable change.

Шаблон:Rail start Шаблон:S-rail-national Шаблон:S-rail-national Шаблон:End

History

Construction and early operations

Файл:Avonmouth rly map 1914.png
The Railway Clearing House Atlas of 1914 shows the then-extensive railway network around Avonmouth.

The railways first came to Avonmouth in 1865, when services began on the Bristol Port Railway and Pier (BPRP), a self-contained railway which ran along the north bank of the River Avon to a deep water pier on the Severn Estuary. The BPRP line ran through the site of the current station and Шаблон:Convert beyond to a terminus at the first Avonmouth station. The BPRP ran into trouble by 1871 when the terminal pier at Avonmouth became difficult to use due to a build-up of silt. With no prospect of a proper dock being funded without a connection to the national rail network, the Clifton Extension Railway (CER) was approved. This was a joint venture by the BPRP, Great Western Railway (GWR) and Midland Railway (MR) which ran from Sneyd Park Junction, south of Шаблон:Rws, via Шаблон:Rws, to join up with the national network at Narroways Hill Junction.[3][18]Шаблон:Rp The link opened in 1877, but initially only for goods trains. The route from Sneyd Park Junction to Clifton Down was subsequently cleared for passenger use on 3 August 1878, but the Midland and Great Western Railways did not think the BPRP track was in a suitable condition and so refused to run any passenger trains beyond Clifton Down.[18]Шаблон:Rp

The station, originally known as Avonmouth Dock, was opened in 1877, shortly after the opening of the Avonmouth Docks in February that year. It was built on, or very near to, the site of a halt built in 1868 for the Docks' construction workers.[19] The local area was still mostly rural – there were a few buildings around the station area, as well as the docks, with the closest extent of the Bristol conurbation Шаблон:Convert away at Shirehampton.[20] The station cost £275 to build, and was merely a platform on the south side of the single track, served by eight trains per day between Шаблон:Rws and the BPRP's Avonmouth terminus, increasing to ten per day from 1887.[18]Шаблон:Rp The Great Western and Midland Railways considered the station inadequate for the passenger numbers expected, and so purchased additional land to enhance the station with extra tracks. The new station comprised a wide island platform – the northern face on the original through line, the southern face being for a new terminal line. The station, now known as Avonmouth Dock Joint, was constructed using mainly wood and corrugated iron. It was opened on 1 September 1885, coinciding with the beginning of passenger services beyond Clifton Down.[19] The Great Western initially offered six trains per day each direction between Avonmouth Dock and Шаблон:Rws. Fearing competition, the BPRP did not allow passengers to use GWR services between its stations. The Midland Railway did not run any passenger services beyond Clifton Down, apart from a one-month trial service in September 1885.[21]Шаблон:Rp Despite the increased traffic the BPRP suffered financially, and was taken over by the CER in 1890.[18]Шаблон:Rp The BPRP's Avonmouth terminus closed to the public in 1902, after which all trains terminated at Avonmouth Dock.[19]

Шаблон:Historical Rail Start Шаблон:Rail line Шаблон:Rail line Шаблон:S-end

Early twentieth century

The station went through numerous enhancements in the first part of the twentieth century. A new platform canopy and urinal were provided in 1900 at a cost of £250. Further improvements followed in 1902 at a cost of £80; and in August 1904 significant enhancements to the station buildings and an extension of the platform cost a total of £1,570. A Шаблон:Convert turntable was constructed in December 1903; with a signal box, known as Avonmouth Dock Passenger, installed at the end of the platform. Dedicated goods staff were employed from the start of 1904, with that year also seeing the installation of a run-around loop for the terminal platform. A small engine shed was added in January 1905.[19] In 1910, some passenger trains once again began to run beyond Avonmouth Dock, continuing towards Шаблон:Rws on the newly opened Henbury Loop Line, which allowed goods trains to the docks to avoid the steep Clifton Down Tunnel.[18]Шаблон:Rp[21] Other trains arrived from London via the loop, connecting with steamer services to Canada and Jamaica.[21]Шаблон:Rp At this point there were 17 trains from Bristol to Avonmouth Dock and 15 back each day; increasing to 21 and 19 respectively by 1920.[18]Шаблон:Rp The station was well-staffed, with 25 station staff and 47 goods staff in 1913.[19] Positions included stationmaster; booking clerks; posters; and outdoor porters, who took goods to ships in the docks.[18]Шаблон:Rp

During the First World War, an Army Remount Service depot was located near Shirehampton. Over the course of the war, Avonmouth Dock Joint handled 35,000 animals, mainly horses and mules, en route to the depot. July 1917 saw the introduction of platform tickets, to capitalise on people using the station to bid farewell to friends heading overseas, or to welcome those returning. The platform was lengthened to Шаблон:Convert in December 1917. A second through track was added in 1918, and so a new cinder-covered platform was built on the north side of the line. The two platforms were linked by a footbridge and a level crossing. The cost of the new platform and the lengthening works was £7,420.[19]

After the war, construction of the Bristol Portway along the Avon Gorge necessitated the closure of the line from Sneyd Park Junction to Hotwells, with trains along it ceasing on 3 July 1922. By this point there were nine trains per day from Hotwells, and eight return. To compensate for the loss of service, the Great Western provided an additional four trains daily from Avonmouth Dock to Bristol and six return. In 1923, grouping resulted in the Midland Railway being absorbed into the London, Midland and Scottish Railway (LMS), and the line continued in a joint arrangement between the Great Western and the LMS.[18]Шаблон:Rp The engine shed was closed in 1924.[19]

By the mid-1920s, the station was proving inadequate for the passenger numbers, and so work began on a comprehensive rebuild in 1926. The new buildings were made of brick; with a large, four-chimneyed building containing most of the facilities; as well as a separate parcels office. The northern platform had a wooden awning built, which is still in place today.[19]

From 1928 many services to Avonmouth Dock were extended to Шаблон:Rws.[18]Шаблон:Rp By 1947, just before the railways were nationalised, there were 33 services each direction between Avonmouth Dock and Temple Meads, with 18 on Sundays.[21]Шаблон:Rp Some trains made circular trips to and from Temple Meads via Clifton Down and Henbury or Шаблон:Rws.[16][19]

Шаблон:Historical Rail Start Шаблон:Rail line Шаблон:Rail line Шаблон:Rail line Шаблон:S-end

British Rail and privatisation

Файл:Avonmouth station, 1992 geograph-3244012-by-Ben-Brooksbank.jpg
The station in 1992, looking along the lines towards Bristol.

When the railways were nationalised in 1948, services at Avonmouth Dock came under the aegis of the Western Region of British Railways. By 1955, service levels had decreased slightly to 28 trains per day from Bristol and 29 return, but the services were at regular intervals. Passenger numbers however dropped sharply in 1961 as the result of a fare increase, and so in 1962 a new reduced timetable was enacted, which lost more passengers. A year later in 1963, the Beeching report suggested the complete withdrawal of services along the line, but ultimately only those beyond Severn Beach or via Henbury were withdrawn.[18] Goods services from the station ended on 20 June 1966, the same day that the station was renamed "Avonmouth".[19][22] The bay platform was taken out of use and the land later taken for industrial buildings.[19] From 17 July 1967 all staffing was withdrawn from stations along the line, including Avonmouth, with tickets issued by the train guard.[18]Шаблон:Rp The station buildings on the island platform survived into the 1970s, as did the footbridge, but with the exception of the parcels office, all were later demolished.[19][23][24] The parcels office was in use in 2006 as a hairdressing salon. The signal box was closed in January 1969, and in September 1973 the wooden level crossing gates were replaced by automatic lifting barriers.[19] By 1974, service had reduced to 19 trains per day in each direction, with no Sunday services to Severn Beach.[18]Шаблон:Rp[25]

British Rail was split into business-led sectors in the 1980s, at which time operations at Avonmouth passed to Regional Railways. At this time, all trains ran to Severn Beach, but the service pattern was irregular.[16] This changed in 1995 when an hourly timetable was introduced for peak times, but northbound services were terminated at Avonmouth.[21]Шаблон:Rp

When the railway was privatised in 1997, local services were franchised to Wales & West, which was succeeded by Wessex Trains, an arm of National Express, in 2001.[26][27] Following action by Friends of Severn Beach Railway and a string of protests, services had increased to 10 per day in each direction by 2005, with Bristol City Council providing a subsidy to Wessex Trains.[19][28] The Wessex franchise was amalgamated with the Great Western franchise into the Greater Western franchise from 2006, and responsibility passed to First Great Western, a subsidiary company of FirstGroup, subsequently rebranded as Great Western Railway in 2015.[29][30][31][32] A minimum service requirement was written into the franchise agreement, ensuring an hourly service along the line, and this has since been increased to three trains every two hours (25 trains per day).[33][34][35][36] Sunday services to Severn Beach were restored in 2010.[25]

Файл:Avonmouth railway station MMB 03.jpg
The old parcel facility, the last-surviving station building, was demolished in 2015.

The final remaining station building, the old parcels office, was demolished in 2015. Local rail campaigners, including Friends of Suburban Bristol Railways and MP Charlotte Leslie, petitioned to prevent the demolition, however Network Rail stated that the cost of restoration was too high and that it had become a safety risk.[37][38][39][40]

Шаблон:Historical Rail Start Шаблон:Rail line Шаблон:Rail line Шаблон:Rail line Шаблон:Rail line Шаблон:S-end

Future

First Great Western declined a contractual option to continue the Greater Western passenger franchise (of which services at Avonmouth are a part) beyond 2013, citing a desire for a longer-term contract due to the impending upgrade to the Great Western Main Line.[31] The franchise was put out to tender,[41][42][43] but the process was halted and later scrapped due to the fallout from the collapse of the InterCity West Coast franchise competition.[44] A two-year franchise extension until September 2015 was agreed in October 2013,[45][46] and subsequently extended until March 2019.[47][48][49]

With the coming upgrade to the Great Western Main Line, the main line from London to Bristol is due to be electrified by 2016.[50] However, the electrification will not extend beyond the main lines, so Avonmouth will continue to be served by diesel trains.[51][52] Stephen Williams, MP for Bristol West; and the group Friends of Suburban Bristol Railways support the electrification being extended to the Severn Beach Line.[53][54]

Improved services at Avonmouth are called for as part of the Greater Bristol Metro scheme, a rail transport plan which aims to enhance transport capacity in the Bristol area.[55][56] There is an aspiration for half-hourly services, with trains towards Bristol terminating alternately at Шаблон:Rws and Шаблон:Rws, however due to the large sections of the Severn Beach Line which are single-track, and to the congested main line from Temple Meads, such frequency is not currently feasible.[57][58] The enhancement scheme was given the go-ahead in July 2012 as part of the City Deal, whereby local councils would be given greater control over money by the government.[59] There are also calls for the reopening of the Henbury Loop Line, which could allow a direct service from Avonmouth to Шаблон:Rws.[60] Plans for a loop were rejected by the West of England Joint Transport Board, however Bristol City Councillors voted to send the decision back to the board for further discussion.[61][62]

See also

Notes

Шаблон:Reflist

References

Шаблон:Reflist

Notes to references

Шаблон:Reflist

External links

Шаблон:Commons category Шаблон:Stn art lrnk

Шаблон:Bristol railway stations Шаблон:Transport in Bristol

  1. Шаблон:Cite book
  2. Шаблон:Cite book
  3. 3,0 3,1 Шаблон:Cite web[refnote 1]
  4. Шаблон:Cite web
  5. Шаблон:Cite news
  6. Шаблон:Cite book
  7. 7,0 7,1 Шаблон:Cite web
  8. 8,0 8,1 8,2 Шаблон:Cite web
  9. 9,0 9,1 Шаблон:Cite news
  10. Шаблон:Cite web
  11. Шаблон:Cite web
  12. Шаблон:Cite web
  13. Шаблон:Cite web
  14. Шаблон:Cite web
  15. Шаблон:Cite press release
  16. 16,0 16,1 16,2 Шаблон:Cite journal
  17. Шаблон:Cite web
  18. 18,00 18,01 18,02 18,03 18,04 18,05 18,06 18,07 18,08 18,09 18,10 18,11 Шаблон:Cite book
  19. 19,00 19,01 19,02 19,03 19,04 19,05 19,06 19,07 19,08 19,09 19,10 19,11 19,12 19,13 Шаблон:Cite book[refnote 1]
  20. Шаблон:Cite web
  21. 21,0 21,1 21,2 21,3 21,4 Шаблон:Cite book
  22. Шаблон:Butt-Stations
  23. Шаблон:Cite web
  24. Шаблон:Cite book
  25. 25,0 25,1 Шаблон:Cite news
  26. Шаблон:Cite web
  27. Шаблон:Cite web
  28. Шаблон:Cite news
  29. Шаблон:Cite web
  30. Шаблон:Cite news
  31. 31,0 31,1 Шаблон:Cite news
  32. Шаблон:Cite news
  33. Шаблон:Cite web
  34. Шаблон:Cite news
  35. Шаблон:Cite news
  36. Шаблон:Cite news
  37. Шаблон:Cite news
  38. Шаблон:Cite news
  39. Шаблон:Cite news
  40. Шаблон:Cite web
  41. Шаблон:Cite magazine
  42. Шаблон:Cite news
  43. Шаблон:Cite press release
  44. Шаблон:Cite news
  45. Шаблон:Cite news
  46. Шаблон:Cite news
  47. Шаблон:Cite news
  48. Шаблон:Cite news
  49. Шаблон:Cite news
  50. Шаблон:Cite web
  51. Шаблон:Cite news
  52. Шаблон:Cite magazine
  53. Шаблон:Cite news
  54. Шаблон:Cite web
  55. Шаблон:Cite web
  56. Шаблон:Cite news
  57. Шаблон:Cite web
  58. Шаблон:Cite news
  59. Шаблон:Cite news
  60. Шаблон:Cite web
  61. Шаблон:Cite news
  62. Шаблон:Cite news


Ошибка цитирования Для существующих тегов <ref> группы «refnote» не найдено соответствующего тега <references group="refnote"/>
Ошибка цитирования Для существующих тегов <ref> группы «note» не найдено соответствующего тега <references group="note"/>