Английская Википедия:Bavarian Zugspitze Railway

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:More citations needed Шаблон:Use dmy dates Шаблон:Infobox rail line The Bavarian Zugspitze Railway (Шаблон:Lang-de) is one of four rack railways still working in Germany, along with the Wendelstein Railway, the Drachenfels Railway and the Stuttgart Rack Railway. The metre gauge line runs from Garmisch in the centre of Garmisch-Partenkirchen to the Zugspitzplatt, approximately 300 metres below Zugspitze, the highest mountain in Germany. The line culminates at 2,650 metres above sea level, which makes it the highest railway in Germany and the third highest in Europe. It is also the railway in Europe with the biggest height difference: 1,945 metres, the lower half being open-air and the upper half being underground.

The line is operated by the Bayerische Zugspitzbahn Bergbahn AG (BZB), whose majority owner is the Garmisch-Partenkirchen Municipal Works. In 2007 the Zugspitze Railway was nominated for a Historic landmarks of civil engineering in Germany award.

The Zugspitze is accessible via the Seilbahn Zugspitze from Eibsee Lake or Tyrolean Zugspitze Cable Car.

History

Opening of the line

The railway was built between 1928 and 1930 and opened in three stages. The first was the Шаблон:Convert long centre section between Grainau and the Eibsee which went into operation on 19 February 1929. On 19 December 1929 it was followed by the Шаблон:Convert long section between Garmisch and Grainau, including the important tourist connexion to the main railway network of the Deutsche Reichsbahn. On 8 July 1930 the last Шаблон:Convert long section between the Eibsee and the – now closed – summit station of Schneefernerhaus was opened, including the final Шаблон:Convert long Zugspitze Tunnel.

New summit section since 1987

In 1987 the route of the railway in the summit area was changed and the Шаблон:Convert long "Rosi Tunnel" opened. The tunnel was named after the skier, Rosi Mittermaier, who was the tunnel patroness (Tunnelpatin) at the time. The tunnel branches from the 1930-built Zugspitze Tunnel about three-quarters of the way along it, and runs to the somewhat lower Zugspitzplatt plateau at Шаблон:Convert. Here, below the Sonn-Alpin Restaurant is the new Glacier Station (Gletscher-Bahnhof) in the middle of the ski area.

The overall length of the Zugspitze Railway was extended from Шаблон:Convert to its current Шаблон:Convert. For five years, both termini were worked in parallel, but since November 1992 the old route to the Schneefernerhausis is no longer routinely worked.

Route

Файл:Zugspitztunnel.svg
Detailed diagram of the Zugspitze Tunnel

The Zugspitze Railway starts in the quarter of Garmisch at a height of Шаблон:Convert. Here the BZB runs its own terminal station which is operationally entirely separate from the adjacent standard gauge station of the Deutsche Bahn AG. Moreover, it is still just called Garmisch, whereas the DB station bears the double-barrelled name of Garmisch-Partenkirchen, reflecting the contentious merger, formally in 1935, of the two municipalities.[1]

For the first Шаблон:Convert, as far as Grainau, the Zugspitze Railway runs as an adhesion line. Of this section, the first Шаблон:Convert run parallel to the Ausserfern Railway, built in 1913. The mountain section begins in Grainau station, is equipped with a Riggenbach rack system, and is Шаблон:Convert long.

Файл:Profil Zugspitzbahn.png
Simplified profile of the line

The railway climbs steeply uphill from Grainau, passes Eibsee station and finally arrives at the halt of Riffelriss. Immediately after the halt is the entrance to the Zugspitze Tunnel, which together with the Rosi Tunnel takes trains to the current terminus at Zugspitzplatt. About a kilometre before it reaches the terminus, the underground section of the line passes almost exactly below the summit of the Zugspitze, and a few metres away from the border with the Austrian state of Tyrol.[2]

Technical

The Zugspitzbahn runs from Garmisch-Partenkirchen to Zugspitzplatt, a distance of 19.0 km. The track gauge is 1,000 mm and the electrification system is 1,500 V D.C. overhead line. The lower section from Garmisch to Eibsee is operated as an adhesion railway with rack assistance (i.e. using a cog-wheel system) from Grainau to Eibsee. The section above Eibsee is operated as rack only using the Riggenbach system. Passengers travelling the whole line from Garmisch to Zugspitzplatt stay on the same train.[3]

Gallery

Шаблон:Cleanup gallery

References

Шаблон:Reflist

Bibliography

External links

Шаблон:Commons category

Шаблон:Authority control

Шаблон:Coord

  1. Шаблон:Cite web
  2. Retrieved from the Google Earth geoinformation system
  3. Karl Arne Richter (editor), Europäische Bahnen '11, Eurailpress, Hamburg, 2010, Шаблон:ISBN;