Английская Википедия:Baykar Bayraktar Akıncı

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description

Bayraktar Akıncı (Шаблон:IPA-tr, Raider lit. "Akinji") is a high-altitude long-endurance (HALE) unmanned combat aerial vehicle (UCAV) being manufactured by the Turkish defence company Baykar. The first three units entered service with the Turkish Armed Forces on 29 August 2021.[1]

The aircraft has a 5.5+ ton maximum takeoff weight (MTOW), of which over Шаблон:Convert is payload. Akıncı is equipped with two turboprop engines of either Шаблон:Cvt or Шаблон:Cvt, as well as electronic support and ECM systems, dual satellite communication systems, air-to-air radar, collision avoidance radar, and advanced synthetic-aperture radar.[2]

Development

With the preliminary design phase completed in June 2019, Akıncı started engine ground run testing in August 2019 with a Ukrainian Ivchenko-Progress AI-450C turboprop engine.[3] First engine test was accomplished on September 1, 2019. Following the completion of other technical tests, the aircraft was moved to the Turkish Army's Çorlu Airfield Command. The UCAV made its maiden flight with automatic taxiing, take-off, 16-minute flight and successful landing on December 6, 2019.[4]

Akıncı has a payload capacity of Шаблон:Cvt internal and Шаблон:Cvt external, a maximum combat load of Шаблон:Cvt. Powered by two Шаблон:Cvt or Шаблон:Cvt turboprop engines, the drone has a Шаблон:Cvt wingspan. It will be the first UAV capable of launching a cruise missile.[4][5][6]

First pictures of the UAV hit media reports in June 2018 and it was unveiled to the public during the Teknofest Aviation, Space and Technology Festival in September 2019.[7][8]

On 22 April 2021, Bayraktar Akıncı UCAV has successfully conducted its first firing tests. During the test, 'Akıncı' was fitted with three different variants of the indigenously developed smart munitions, MAM-L, MAM-C and MAM-T. The test was also the first public appearance of the Roketsan's newest smart munition, MAM-T.[9] From July 6 to 7, the aircraft completed a test flight of 25 hours and 45 minutes, flying Шаблон:Convert and reaching an altitude of Шаблон:Convert.[10] On August 29, 2021, Akıncı was added to the inventory of Turkish armed forces.[1]

Operational history

Akıncı was first used in Pençe-Kilit Operations which were held by the Turkish military to dissolve PKK positions such as shelters and caves in Northern Iraq.[11]

A total of 9 Akıncıs successfully flew over 1551 hours in the earthquake zone of the 2023 Turkey-Syria earthquake.

The drones have been instrumental in providing continuous updates and data to the crisis response team for damage detection, search and rescue support, along with coordination activities.[12]

A unspecified number of Akıncıs were involved in an attack on the Wagner Group-operated El-Hadim Airbase, having destroyed at least one air defense system.Шаблон:Cn

Avionics and radar

The Akıncı drone is equipped with an indigenously manufactured active electronically scanned array (AESA) radar called MURAD, a SAR/GMTI radar, a surveillance system, electronic warfare, and signal intelligence suite (SIGINT), and SATCOM allowing Akıncıs to become UCAV as well as ISTAR+C3 assets for the Turkish military.[13][14][15]

Timeline

Файл:Bayraktar Akıncı SİHA (UAV).jpg
Bayraktar Akıncı at Teknofest 2019
Файл:BayraktarAkıncı Teknofest2019 (2).jpg
Bayraktar Akıncı at Teknofest 2019
Файл:BayraktarAkıncı Teknofest2019 (3).jpg
Bayraktar Akıncı at Teknofest 2019
Файл:Bayraktar Akıncı TurkishArmy Teknofest2021 (1).jpg
Tailfin of the Bayraktar Akıncı at Teknofest 2021
  • On 6 December 2019, Bayraktar Akıncı made its maiden flight.[16]
  • On 10 January 2020, first prototype made its second flight and passed over 6000 ft.[17]
  • On 13 August 2020, second prototype made its maiden flights.[18]
  • On 19 August 2020, second prototype conducted medium altitude system integration flight tests.[19][20]
  • On 22 August 2020, first prototype exceeded Шаблон:Convert during flight testing.[21][22]
  • On 5 September 2020, second prototype conducted high altitude and high speed flight tests.[23]
  • On 8–9 September 2020, Critical Design Review was conducted.[24][25]
  • On 11 September 2020, second prototype conducted medium altitude system integration flight tests.[26]
  • On 3 October 2020, second prototype 2 conducted asymmetric thrust tests.[27]
  • On 13 March 2021, Bayraktar Akıncı prototype 2 conducted its advanced system integration flight tests.[28]
  • On 27 March 2021, Bayraktar Akıncı prototype 3 conducted its maiden flight.[29]
  • On 10 April 2021, Bayraktar Akıncı prototype 3 conducted its medium altitude system integration flight tests.[30][31]
  • On 13 April 2021, Bayraktar Akıncı prototype 3 conducted its high altitude and high speed flight tests.[32]
  • On 22 April 2021, Bayraktar Akıncı conducted its first firing tests.[33][34]
  • On 19 May 2021, the first serial produced Bayraktar Akıncı conducted its maiden flight[35]
  • On 7 July 2021, Bayraktar Akıncı set the new national flight altitude record of Turkey by cruising at Шаблон:Convert for 25 hours and 46 minutes at a distance of 7,507 km [36]
  • On 10 July 2021, Bayraktar Akıncı conducted a 13 hours and 24 minute long flight with 1360 kg payload. During the flight Akıncı was equipped with the NEB bunker buster bomb developed by TUBITAK SAGE. Marking the heaviest bomb ever carried by an UCAV[37]
  • On 29 August 2021, the first three units were delivered to the Turkish Armed Forces[38]
  • On 24 December 2021, two units were delivered to the Turkish Armed Forces[39]
  • On 23 January 2022, first export agreement of Bayraktar Akıncı was announced
  • On 13 February 2022, Bayraktar Akıncı conducted its first combat mission[40]
  • On 2 March 2022, second export agreement of Bayraktar Akıncı was announced
  • On 2 March 2022, the Baykar announced that the Bayraktar AKINCI-B version with twin Шаблон:Cvt engines completed its maiden flight [41]
  • On 21 May 2022, the Bayraktar AKINCI crossed 3 countries (Turkey, Georgia, Azerbaijan), flying approximately 2000 km.[42]
  • On 14 June 2022, the Bayraktar AKINCI UCAV (Unmanned Combat Aerial Vehicle) has successfully completed its first firing test from 30 kilometers away with the KGK-SIHA-82 (Winged Guidance Kit) ammunition.[43]
  • On 21 June 2022, the Bayraktar AKINCI B Variant took off to carry out endurance, high altitude and high speed tests, The B Variant rose to an altitude of Шаблон:Convert within the scope of the test, returned to Bayraktar AKINCI Flight, Training and Test Center at Çorlu Airport Command after 20 hours and 23 minutes of flight.[44]
  • On 1 July 2022, the Bayraktar AKINCI carried out a test firing with the LGK-82 (Laser Guidance Kit), developed by ASELSAN, Flying with an altitude of 30 thousand feet, the target was laser-marked by Bayraktar TB2 SİHA, The LGK-82 was Launched from UAV for the first time.[45]
  • On 3 August 2022, three units were delivered to the Turkish Air Force[46]
  • On 24 August 2022, three additional units were delivered to the Turkish Armed Forces, bringing the number of drones operated by Turkey to 12[47]

Operators

The Bayraktar Akıncı has been sold to 4 countries as of October 2022.[48]

Current operators

Шаблон:Flag

Шаблон:Flag

Шаблон:Flag

Шаблон:Flag[55]

Future operators

Шаблон:Flag[56]

Шаблон:Flag[57]

Шаблон:Flag[58]

Specifications

Шаблон:Primary sources Шаблон:Aircraft specs

See also

References

Шаблон:Reflist

Шаблон:Commons category

  1. 1,0 1,1 Шаблон:Cite news
  2. Шаблон:Cite web
  3. Ошибка цитирования Неверный тег <ref>; для сносок k1 не указан текст
  4. 4,0 4,1 Ошибка цитирования Неверный тег <ref>; для сносок aa1 не указан текст
  5. Ошибка цитирования Неверный тег <ref>; для сносок j1 не указан текст
  6. Ошибка цитирования Неверный тег <ref>; для сносок official1 не указан текст
  7. Ошибка цитирования Неверный тег <ref>; для сносок uav1 не указан текст
  8. Шаблон:Cite web
  9. Шаблон:Cite web
  10. Шаблон:Cite web
  11. Шаблон:Cite webШаблон:Dead link
  12. Шаблон:Cite web
  13. Шаблон:Cite web
  14. Шаблон:Cite web
  15. Шаблон:Cite web
  16. Шаблон:Cite web
  17. Шаблон:Cite web
  18. Шаблон:Cite web
  19. Шаблон:Cite web
  20. Шаблон:Cite web
  21. Шаблон:Cite web
  22. Шаблон:Cite web
  23. Шаблон:Cite web
  24. Шаблон:Cite web
  25. Шаблон:Cite web
  26. Шаблон:Cite web
  27. Шаблон:Cite web
  28. Шаблон:Cite web
  29. Шаблон:Cite web
  30. Шаблон:Cite web
  31. Шаблон:Cite web
  32. Шаблон:Cite web
  33. Шаблон:Cite web
  34. Шаблон:Cite web
  35. Шаблон:Cite tweet
  36. Шаблон:Cite web
  37. Шаблон:Cite web
  38. Шаблон:Cite news
  39. Шаблон:Cite news
  40. Шаблон:Cite news
  41. Шаблон:Cite web
  42. Шаблон:Cite web
  43. Шаблон:Cite web
  44. Шаблон:Cite web
  45. Шаблон:Cite web
  46. Шаблон:Cite news
  47. Шаблон:Cite news
  48. Ошибка цитирования Неверный тег <ref>; для сносок üretim-ve-ihraç-eylül-2022 не указан текст
  49. 49,0 49,1 Шаблон:Cite web
  50. Шаблон:Cite web
  51. Шаблон:Cite web
  52. Шаблон:Cite web
  53. Шаблон:Cite web
  54. Шаблон:Cite tweet
  55. Шаблон:Cite web
  56. Шаблон:Cite web
  57. Шаблон:Cite web
  58. Шаблон:Cite web