Английская Википедия:Bebington railway station

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates Шаблон:Use British English Шаблон:Infobox station Bebington railway station serves the town of Bebington in Merseyside, England. The station is situated on the Chester and Ellesmere Port branches of the Wirral Line, forming part of the Merseyrail network.

History

The station is on the former Chester and Birkenhead Railway, opening in 1840 as Bebington before being renamed 'Bebington and New Ferry' on 1 May 1895.

The name was changed back to just Bebington on 6 May 1974.[1]

Direct train services to Liverpool began in 1985, when the line between Rock Ferry and Hooton was electrified; previously passengers for Liverpool had to change at Rock Ferry. Further electrification in the early-1990s allowed electric train services to be extended, first to Chester in 1993 and then Ellesmere Port in 1994.

In June 2014 it was announced that the station would be among a small number across the Merseyrail network that would be renovated as part of a £3.7m programme of improvements, namely refurbishment and improvement of passenger areas, lighting and CCTV coverage. Between February and March 2015, the subway leading to Platform 1 was refurbished.[2] An electronic information board was also added at the street entrance.

Facilities

The station is staffed during all opening hours and has platform CCTV.[3] There is a payphone, a vending machine and a booking office. There are live departure and arrival screens on the platform, for passenger information. Each of the two platforms has sheltered seating. The station has a free car park, with 24 spaces and also a cycle locker with 25 spaces.[4] Access to the station and both platforms is by ramp, allowing easy access for passengers with wheelchairs or prams.[5]

Services

Trains operate every 15 minutes between Chester and Liverpool on weekdays and Saturdays, until late evening when the service becomes half-hourly, as it is on Sundays. Additionally there is a half-hourly service between Liverpool and Ellesmere Port all day, every day.[6] Northbound trains operate via Hamilton Square station in Birkenhead and the Mersey Railway Tunnel to Liverpool. Southbound trains all proceed as far as Hooton, where the lines to Chester and Ellesmere Port divide. These services are all provided by Merseyrail's fleet of Class 507 and Class 508 EMUs.

Gallery

References

Шаблон:Reflist

Further reading

External links

Шаблон:Commons category Шаблон:Stn art lrnk Шаблон:Merseyrail info lnk

Шаблон:Rail start Шаблон:Rail line Шаблон:Historical Rail Insert Шаблон:Rail line Шаблон:S-end

Шаблон:Merseyside railway stations Шаблон:Merseyrail Wirral Line Шаблон:Railway stations served by Merseyrail