Английская Википедия:Beijing Subway rolling stock

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Multiple images Шаблон:Multiple images Шаблон:Multiple images Шаблон:Multiple images All Beijing Subway trains run on Шаблон:Track gauge rail and draw power from the Шаблон:750 V DC, except those on Lines 6, 11 14, 16, 17 and 19, which use Шаблон:1,500 V DC overhead wires.[1] Lines 6, 15, Fangshan, and Changping lines have a designed maximum service speed of Шаблон:Convert.[2] The Airport Line is linear motor driven with a designed maximum service speed of Шаблон:Convert[3][4] All other Lines have a maximum service speed of Шаблон:Convert. Currently, Lines 1, 2, 4, 5, 8, 9, 10, 13, 15, Batong, Daxing, Changping, Fangshan, Yanfang, and Yizhuang lines use 6 car B size trains. Initially, the Batong line and Line 13 was originally used 4 car trains and now expanded into six.[5][6][7]

Type B Trains

The most common rolling stock of the Beijing Subway is the Type-B car, which has a carrying capacity of 245 passengers per car and top speed of Шаблон:Convert, drawing 750 V DC power from the third rail.[8] Most lines operate the six-car Type-B train set that can carry 1,460 passengers per train and transport 43,800 passengers per hour.[8] Lines 6 and 7 use eight-car Type-B train sets that can carry 1,960 passengers per train and 58,800 passengers per hour.[8] The Type-B trains sets of Lines 6 and 7 can draw Шаблон:1,500 V DC power and can reach Шаблон:Convert. The Yanfang Line operates four-car Type-B train sets with ”driverless” automatic train operation.

Type A Trains

Type-A cars run on Lines 11, 14, 16, 17, 19 and under construction Lines 3 and 12. They are 3.1 meters longer, and 20 cm wider than Type-B cars with a designed capacity of 310 passengers per car and 10 sets of doors per train compared to 8 sets of doors per train on Type-B cars.[9][8] Type A cars draw Шаблон:1,500 V DC power from overhead wire and can reach Шаблон:Convert. Line 14 uses six-car Type A train sets which can carry 1,860 passengers per train and allow for throughput of up to 55,800 passengers per hour per direction. Lines 16, 17 and 19 uses eight-car Type-A train sets which can carry 2,480 passengers per train and allow for throughput of up 74,400 passengers per hour per direction.[8]

Type L trains

The Capital Airport Express has its distinct 4-car linear motor train sets, powered by 750 V DC electricity via the third rail, and can reach a maximum speed of Шаблон:Convert.[10][11] The under construction Line 28 will also use L type trains but 6 cars long.

Type D Trains

The Daxing Airport Express uses Type-D train sets with top operational speed of Шаблон:Convert.[12][13] These trains are powered by Шаблон:25 kV 50 Hz overhead wires. The eight-car train sets have seven passenger cars and one car to carry luggage.[13] The under construction Line 22 will also use eight-car Type-D trains.

Maglev

The S1 Line's maglev trains feature six-car train sets that run on Шаблон:1,500 V DC power and can reach Шаблон:Convert.[14] Compared to subway trains that run on conventional track, the maglev train has a smaller minimum turning radius of 75 meters compared to 200 meters, can climb steeper slope of 53‰ versus 40‰ and emits less noise.[15] The six-car train set can carry 1,032 passengers.[15]

Light Rail Transit

The Xijiao LRT and Yizhuang Tram Line T1 operates five-car trams that draw Шаблон:750 V DC from overhead lines and can reach Шаблон:Convert.

Manufacturers

From the subway's inception to 2003, all Beijing subway trains were manufactured by CNR Changchun Railway Vehicles Co. Ltd. All rolling stock on Lines 2, 5, 6,[16] 9, 10, 13, 15, Yizhuang line, Capital Airport Express and some of Line 1, 14, 16, and Yanfang line stocks[3][17][18] are produced by CNR Changchun.[19] However, CSR Qingdao Sifang Co., Ltd. has recently produced rolling stock for the Beijing subway. CSR Sifang produced all the trains for Lines 4,[20][21] 8, Daxing,[21] Changping,[22] Daxing Airport Express and some of Line 1,[23] 14,[17][24][25] 16, and Yanfang line.

The Beijing Subway Rolling Stock Equipment Co. Ltd., a wholly owned subsidiary of the Beijing Mass Transit Railway Operation Corp., provides local assemblage, maintenance and repair services. It has also made trains for line 7, Batong, and Fangshan lines.

History

First Generation

In the 1960s to mid-1970s, the Beijing Subway used DK2 and DK3 models made in Changchun. The DK stands for diandong keche or electrically-operated passenger car.[26] These models and their derivatives, the DK3G, DK20, DK16A, BD1 and BD2 are classified by the Beijing Subway as the first generation.[27] In recent decades, the Beijing Subway Rolling Stock Equipment Co. refurbished the DK16A and DK20 models, which remained in use well into the first decade of the 21st century.[28] The refurbished DK16AG trains entered into service on Line 2 in 2005.[29]

Pyongyang Metro DK4 cars

During the opening of Line 13 some ex-Pyongyang Metro Changchun DK4 cars were used until the new order of cars replaced them.

Second Generation

From the 1980 to the early 1990s, the subway introduced several new models including the DK6, DK9 and their derivatives the DK11, DK16 and GTO.[30] The M-series trains that appeared on Lines 2 and 13 were made by Japan's Tokyu Car Corporation.[31][32][33]

Third Generation

In 1998, the subway began deploying a new generation of train sets that featured variable voltage variable frequency (VVVF) control mechanisms. These models include the DKZ4, DKZ5, and the DKZ6.[34] DKZ stands for diandong keche zu or electric passenger train sets.[26] CNR Changchun also made 174 DK28-DK31 metro cars, which uses VVVF inverters and AC motors for Line 1,[35] and 136 DK32-34 trains for Line 13.[36] In 2005, the Batong line began using SFX01 and SFX02 trains made by CSR Qingdao Sifang.[26] The 40 trains of the Airport Express were made by a joint-venture between CRRC Changchun and Bombardier Transportation, and uses Bombardier's Innovia Advanced Rapid Transit (ART) 200 technology.[33][37]

Fourth Generation

Since 2017, trains have been ordered with capabilities for unattended automatic train operation. Starting with the DKZ70 and SFM16 trains on the Yanfang Line. Since then trains on the Daxing Airport Express, Lines 11, 17 and 19 operate or are capable of operating in GoA4 unattended train operation mode.

Current Fleet

Model Image Type Manufacturer Year Built Amount in Service Fleet Numbers Line(s) Served Depot Notes
DKZ4 Файл:S401 leaving Sihui (20210421101850).jpg 6B CNR Changchun 1998 31 S401–S431 Шаблон:Rint Sihui Refurbished 2007
DKZ5 Файл:H440 leaving Huoying (20180318121801).jpg 6B CNR Changchun
Beijing Subway Rolling Stock Equipment
2002 55 H401
H403–H456
Шаблон:Rint Huilongguan Refurbished 2015–2018
DKZ6 Файл:H402 entering Huilongguan Station (20190608121121).jpg 6B CNR Changchun 1 H402 Refurbished 2015
SFM01 Файл:TQ401 at Sihui East (20210208185309).jpg 6B CSR Qingdao Sifang
Beijing Subway Rolling Stock Equipment
2003 19 Шаблон:Nowrap
TQ414–TQ424
Шаблон:Rint Tuqiao Refurbished 2015–2019
SFM02 Файл:TQ411 entering Guoyuan (20210331171512).jpg 6B CSR Qingdao Sifang 5 TQ409–TQ413
DKZ13 Файл:DKZ13 TP442 Arrived at TIANTONGYUAN Station.jpg 6B CNR Changchun
Beijing Subway Rolling Stock Equipment
2006 61 TP401–TP461 Шаблон:Rint Taipingzhuang
Songjiazhuang
Currently being refurbished[38]
DKZ16 Файл:201606 DKZ16-T418 enters into Jianguomen Station.jpg 6B CNR Changchun
Beijing Subway Rolling Stock Equipment
50 T401–T450 Шаблон:Rint Taipinghu
SFM04 Файл:01 035 leaving Sihui (20210421103655).jpg 6B CSR Qingdao Sifang 39 G432–G470 Шаблон:Rint Gucheng
DKZ15 Файл:10 028 entering Haidian Huangzhuang (20230526153039).jpg 6B CNR Changchun
Beijing Subway Rolling Stock Equipment
CNR Dalian
2007 43 W401–W443 Шаблон:Rint Wanliu
Wulu
QKZ5 Файл:北京机场线车辆.JPG 4LB CNR/CRRC Changchun
Bombardier
10 L1 101–L1 110 Шаблон:RouteBox Tianzhu Based on the INNOVIA ART 200
SFM05 Файл:046 entering Anheqiao North (20210218151153).jpg 6B CSR Qingdao Sifang 2008
2010
73 001–053
061–093
Шаблон:Rint Шаблон:Rint Longbeicun
Majiapu
Nanzhaolu
SFM07 Файл:TQ427 entering Sihui East.jpg 6B CSR Qingdao Sifang
Beijing Subway Rolling Stock Equipment
2008[39] 6 TQ425–TQ430 Шаблон:Rint Tuqiao Refurbished 2016–2019
BJD01BDK03 Файл:FS003 leaving Suzhuang.jpg 6B CNR Changchun
Beijing Subway Rolling Stock Equipment
2009
Шаблон:Nowrap
44 FS001–FS021

FS022–FS044

Шаблон:Rint Yancun
SFM13 Файл:CP005 entering Xi'erqi (20200630121149).jpg 6B CSR/CRRC Qingdao Sifang 2009
2019
32 CP001–CP032 Шаблон:Rint Dingsi Road
Ming Tombs
DKZ31 Файл:15 025 entering Houshayu Station (20170412182046).jpg 6B CNR Changchun 2010 28 15 001–15 028 Шаблон:Rint Maquanying
Fengbo
DKZ32 Файл:YZ014 at Rongchang Dongjie Station.jpg 6B CNR Changchun 23 YZ001–YZ023 Шаблон:Rint Songjiazhuang
Taihu
SFM12SFM42 Файл:08 040@BCR (20180305144251).jpg 6B CSR/CRRC Qingdao Sifang
Beijing Subway Rolling Stock Equipment
40 08 001–08 040 Шаблон:Rint Pingxifu
Yinghai
DKZ33BDK05 Файл:09 001 reversing at National Library (20210121164410).jpg 6B CNR/CRRC Changchun
Beijing Subway Rolling Stock Equipment
2011
2019
37 09 001–09 037 Шаблон:Rint Guogongzhuang
DKZ34 Файл:10 073 entering Haidian Huangzhuang (20210120155628).jpg 6B CNR Changchun
Beijing Subway Rolling Stock Equipment
CNR Dalian
2011 41 10 044–10 084 Шаблон:Rint Wanliu
Wulu
DKZ47 Файл:06 066 leaving Qingnianlu (20210122104023).jpg 8B CNR/CRRC Changchun 2011
2013
2018
99 06 001–06 099 Шаблон:Rint Wulu
Wuliqiao
Dongxiaoying
DKZ53 Файл:A DKZ53 in ZHANGGUOZHUANG Station.jpg 6A CNR Changchun 2012 38 201–238 Шаблон:Rint Maquanying
Zhangyicun
SFM18 Файл:A SFM18 in ZHANGGUOZHUANG Station.jpg 6A CSR Qingdao Sifang 25 239–263 Шаблон:Rint
BDK01BDK04 Файл:07 019 leaving Caishikou (20210119175017).jpg 8B Beijing Subway Rolling Stock Equipment 2013 68 07 001–07 068 Шаблон:Rint Jiaohuachang
Zhangjiawan
DKZ46 Файл:10 110 entering Haidian Huangzhuang (20210120153049).jpg 6B CNR Changchun
Beijing Subway Rolling Stock Equipment
CNR Dalian
32 10 085–10 116 Шаблон:Rint Wanliu
Wulu
DKZ76 Файл:YF012 entering Yancun East Station (20180120163144).jpg 4B CRRC Changchun 2014-2016 15 YF001–YF015 Шаблон:Rint Yancun North
DKZ93SFM40 Файл:305 leaving Xibeiwang (20210119184844).jpg 8A CRRC ChangchunCSR Qingdao Sifang 2016-2019 63 301–364 Шаблон:Rint Beianhe
SFM16 Файл:SFM16型列车.jpg 4B CRRC Qingdao Sifang 2016 1 YF016 Шаблон:Rint Yancun North
SFM40 Файл:L16 336@BCR (20160905092327).jpg 8A CRRC Qingdao Sifang 2016– 29 336–364 Шаблон:Rint Beianhe
SFM42 Файл:South bottleneck of Yinghai Station (20190627165401).jpg 6B CRRC Qingdao Sifang
Beijing Subway Rolling Stock Equipment
2019 72 08 041–08 112 Шаблон:Rint Pingxifu
Yinghai
BDK06 Файл:TQ431 entering Guoyuan (20210331170745).jpg 6B Beijing Subway Rolling Stock Equipment 2019– 12 TQ431–TQ437

01108-01112

Шаблон:Rint Tuqiao

Sihui

Cinova-160 Файл:JC008 at Beiwangchang (20190926151008).jpg 8D, 4D CRRC Qingdao Sifang 2019 (8 Car Train),
2020 (4 Car Train)
16 JC001–JC008,
JC010–JC013 (8 Car Train),
JC401–JC404 (4 Car Train)
Шаблон:Rint Cigezhuang

New Airport North

CJ3 City Type 8D CRRC Changchun 2019 1 JC009
SFM79CCD5035 Файл:SFM79 504.jpg 8A CRRC Qingdao SifangCRRC Changchun 2019– 35 501–518, 539–555 Шаблон:Rint
SFM80CCD5034 Файл:19 007 reversing at Mudanyuan (20220107124954).jpg 8A CRRC Qingdao SifangCRRC Changchun 2019– 25 19 001–19 025 Шаблон:Rint
ZBM04 Файл:Model of BJL11 train at MetroTrans 2021 (20211009141526).jpg 4A Beijing Subway Rolling Stock Equipment 2020 5 11 001–11 005 Шаблон:Rint
CCD3004 Файл:L1-112 at Tianzhu Depot (20211220152009).jpg 4LB CRRC Changchun 2021 5 L1 111–L1 115 Шаблон:RouteBox Tianzhu Based on the INNOVIA ART 200

References

Шаблон:Reflist

External links

Шаблон:Commons category Шаблон:Wikivoyage

Шаблон:Beijing Subway Шаблон:Rapid transit in the People's Republic of China Шаблон:Rapid transit in Asia

  1. Шаблон:Cite web
  2. New Beijing subway to ease traffic congestion, Wu Wenjie, deputy director of China Railway Tunnel Group, China Daily. Reporter ZHENG Xin. 2012-11-26.
  3. 3,0 3,1 "Linear Motor Commuter for Beijing" CNR website Шаблон:Webarchive Accessed Mar. 27, 2010
  4. Шаблон:Cite web
  5. Шаблон:Cite web
  6. Шаблон:Cite web
  7. Шаблон:Cite web
  8. 8,0 8,1 8,2 8,3 8,4 Шаблон:Cite web
  9. Шаблон:Cite web
  10. New Beijing subway to ease traffic congestion, Wu Wenjie, deputy director of China Railway Tunnel Group, China Daily. Reporter ZHENG Xin.[1] 2012-11-26.
  11. "Linear Motor Commuter for Beijing" CNR website Шаблон:Webarchive Accessed Mar. 27, 2010
  12. Шаблон:Cite web
  13. 13,0 13,1 Шаблон:Cite web
  14. Шаблон:Cite web
  15. 15,0 15,1 Шаблон:Cite web
  16. Шаблон:Cite web
  17. 17,0 17,1 Шаблон:Cite news
  18. (Chinese) 吉林日报 Шаблон:Webarchive July 31, 2009
  19. Шаблон:Cite web
  20. Шаблон:Cite web
  21. 21,0 21,1 Шаблон:Cite web
  22. Шаблон:Cite web
  23. Шаблон:Cite web
  24. (Chinese) [2] Шаблон:Webarchive July 30, 2009
  25. (Chinese)"青岛造" 最高运营时速100公里Шаблон:Dead linkШаблон:Cbignore Dec. 31, 2009
  26. 26,0 26,1 26,2 "Robert McConnell's Beijing Subway Webpage" Accessed Mar. 27,2010
  27. (Chinese) 第一代电动客车 Шаблон:Webarchive Accessed Mar. 27, 2010
  28. (Chinese) 厂修车介绍 Шаблон:Webarchive Accessed Mar. 27, 2010
  29. (Chinese)DK16大修改造车 Шаблон:Webarchive Accessed Mar. 27, 2010
  30. (Chinese) 第二代电动客车 Шаблон:Webarchive Accessed Mar. 27, 2010
  31. (Chinese) "东急" Accessed Mar. 28, 2010
  32. (Chinese) "M车" Шаблон:Webarchive Accessed Mar. 28, 2010
  33. 33,0 33,1 Шаблон:Cite web
  34. (Chinese) [3] Шаблон:Webarchive Accessed Mar. 27, 2010
  35. "DK28 Metro Car with VVVF Inverter" Шаблон:Webarchive Accessed Mar. 27, 2010
  36. "DK32 Commuter Train for Beijing"Шаблон:Dead link Accessed Mar. 27, 2010
  37. "Bombardier Awarded Contract in China for the Beijing Capital International Airport Link With Connection to Summer 2008 Olympic Games Village" Business Wire Mar. 20, 2006
  38. Шаблон:Cite web
  39. Шаблон:Cite web