Английская Википедия:Bittern Line

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Refimprove Шаблон:Use dmy dates Шаблон:Use British English Шаблон:Infobox rail line Шаблон:Bittern Line The Bittern Line is a railway branch line in Norfolk, England, that links Шаблон:Rws to Шаблон:Rws.[1] It passes through the Broads on its route to an Area of Outstanding Natural Beauty on the north Norfolk coast.[2] It is named after the bittern, a rare bird found in the reedy wetlands of Norfolk.

The line is Шаблон:Convert in length and there are 10 stations. It is part of Network Rail Strategic Route 7, SRS 07.11, and is classified as a rural line.[3]

Passenger services are operated by Greater Anglia, which also manages all of the stations.

History

The line was granted permission in 1864[4] and the first stretch was opened between Norwich and Шаблон:Rws in 1874 by the East Norfolk Railway. It was extended to Cromer by 1877 before being extended to Шаблон:Rws in 1877, using a section of the Midland and Great Northern Joint Railway line. From the early twentieth century until the end of steam services, in 1962, the Great Eastern Railway operated coastal holiday services from London Liverpool Street under names such as the Norfolk Coast Express and The Broadsman.[4]

Following the closure of the majority of the Midland and Great Northern network, the line operated as a single branch between Norwich and Melton Constable before the section between Sheringham and Melton Constable was closed in 1964.[5] The remainder of the line was listed for closure in 1967[6] but survived the proposal after being declined by the Secretary of State for Transport.[7]

The Bittern Line Partnership was set up by Norfolk County Council in 1997. and was designated a community rail line by the Department for Transport in September 2007.

The section of the line between Sheringham and Holt which was closed in the 1960s remains in use as a heritage railway line operated as the North Norfolk Railway (NNR - also known as the Poppy Line). After a period of 36 years, the link between the Bittern line and the North Norfolk Railway was reinstated in 2010 with the opening of a new level crossing at Sheringham.

Sheringham railway station was upgraded in 2019 to accommodate the new Class 755s [8]

Stations

The following table summarises the line's 10 stations, their distance measured from Шаблон:Rws, and their estimated number of passenger entries/exits in 2018/19 and 2022/23: [9]

Station Location Local authority Mileage Patronage 2018/19 Patronage 2022/23[9]
Шаблон:Rws Norwich City of Norwich 0Шаблон:0 4,250,834 3,964,948 million
Шаблон:Rws Salhouse Broadland 6Шаблон:0 11,778 14,006
Шаблон:Rws Hoveton/Wroxham North Norfolk Шаблон:Frac 136,414 124,804
Шаблон:Rws Worstead North Norfolk Шаблон:Frac 25,650 26,816
Шаблон:Rws North Walsham North Norfolk 16Шаблон:0 265,400 243,208
Шаблон:Rws Thorpe Market North Norfolk Шаблон:Frac 19,188 28,446
Шаблон:Rws Roughton North Norfolk 24Шаблон:0 21,766 24,670
Шаблон:Rws Cromer North Norfolk Шаблон:Frac 219,244 244,294
Шаблон:Rws West Runton North Norfolk Шаблон:Frac 27,212 32,918
Шаблон:Rws Sheringham North Norfolk Шаблон:Frac 225,894 232,222

Services

Файл:Norwich UK train station.JPG
Norwich station in 2005

Passenger services are operated by Greater Anglia. The typical service is one train per hour in each direction between Norwich and Sheringham. Calling patterns are varied, with some trains stopping at all stations while others omit some of the lesser-used stations along the line, such as Шаблон:Rws, Шаблон:Rws and Шаблон:Rws.

In 2019, new Class 755 bi-mode trains began to replace the previous mixture of Class 153, Class 156 and Class 170 diesel multiple units.[10]

The line is also used by freight trains which are operated by GB Railfreight. Some trains carry gas condensate from a terminal at North Walsham to Harwich International Port.

Infrastructure

Файл:The second train to use the crossing at Sheringham 24 04 2010 (3).JPG
The Sheringham level crossing in use in 2010

The line is double-track from Norwich to Шаблон:Rws, where it becomes single-track with a passing loop at Шаблон:Rws, and two platforms at Cromer also allowing passing. The line is not electrified; it has a loading gauge of W8 between Norwich and Roughton Road and W6 from Roughton Road to Sheringham. The maximum speed is Шаблон:Convert.[3]

The line was re-signalled in 2000, leading to the closure of a number of mechanical signal boxes and control moving to a panel at the Trowse Swing Bridge control room. This saw the end of one of the few remaining sections of single-track main line controlled by tokens.Шаблон:Cn The Cromer signal box has been preserved.

Proposed developments

Rackheath station

A new station is proposed as part of the Rackheath eco-town.[11] The building of the town may also mean a short freight spur being built to transport fuel to fire an on-site power station. The plans for the settlement received approval from the government in 2009.[12]

References

Шаблон:Reflist

External links

Шаблон:Commonscat

Шаблон:Railway lines in the East of England