The Blue Line of the Ahmedabad Metro is the first metro line of the Ahmedabad city's mass rapid transit rail. It consists of 18 metro stations (including two under construction), starting from Vastral Gam and ending at Thaltej Gam, with a total distance of Шаблон:Convert, with most of the it being elevated.

History

The ground breaking ceremony was held on 14 March 2015 for the construction of Шаблон:Cvt long Vastral – Apparel Park stretch of Blue Line of the Phase-1 in presence of then Gujarat Chief Minister, Anandiben Patel. The work started in March 2016.[1][2][3][4] The trial runs were carried out on the section in February 2019.[5][6] The section was inaugurated on 4 March 2019 by Indian Prime Minister Narendra Modi along with Chief Minister of Gujarat Vijay Rupani and Deputy Chief Minister Nitinbhai Patel.[7][8] It opened to the public on 6 March 2019.[9] The Шаблон:Cvt-long Thaltej-Thaltej Gam section and two metro stations, Thaltej Gam and Kankaria East, will be completed by December 2023.[10][11][12] The rest of the Phase-1 was inaugurated on 30 September 2022 by Prime Minister Modi.[13] The Blue Line was opened to public on 2 October 2022.[14][15] On opening day, total 41,700 tickets were sold, generating revenue of Шаблон:INRconvert, and total 72 trips were made.[16] On next day, 17,000 people travelled on 44 trips.[14]

Features

While connecting Vastral Gam to Thaltej Gam, this line will be passing through Nirant Cross Road, Vastral, Rabari Colony, Amraiwadi, Apparel Park, Kankaria East, Kalupur Railway Station, Ghee Kanta, Shahpur, Old High Court, Stadium, Commerce Six Road, Gujarat University, Gurukul Road, Doordarshan Kendra and Thaltej stations.

The total distance of the corridor is Шаблон:Convert with most of the it being elevated. The underground section is approximately Шаблон:Cvt in length with 4 underground stations, while the elevated section has 14 elevated stations. Old High Court station serves as an interchange station for the Blue Line and Red Line.

The underground section is constructed about 22 metre deep at the lowest level near Gheekanta station. The other three underground stations are about 12-14 metres deep.[17]

List of stations

Following is a list of stations on this route:[18]

style="text-align:center; background:#Шаблон:Rcr;" colspan="8" | Blue Line
# Station Name Opening Connections Layout
English Gujarati
1 Шаблон:Stl થલતેજ ગામ December 2023[19] None Elevated
2 Шаблон:Stl થલતેજ 30 September 2022 None Elevated
3 Шаблон:Stl દૂરદર્શન કેન્દ્ર 30 September 2022 None Elevated
4 Шаблон:Stl ગુરુકુલ રોડ 30 September 2022 Ahmedabad BRTS[20] at Helmet Cross Roads Elevated
5 Шаблон:Stl ગુજરાત યુનિવર્સિટી 30 September 2022 None Elevated
6 Шаблон:Stl કોમર્સ છ રસ્તા 30 September 2022 None Elevated
7 Шаблон:Stl એસ પી સ્ટેડિયમ 30 September 2022 None Elevated
8 Шаблон:Stl જૂની હાઇ કોર્ટ 30 September 2022 Шаблон:Rbox Elevated
9 Шаблон:Stl શાહપુર 30 September 2022 None Underground
10 Шаблон:Stl ઘીકાંટા 30 September 2022 None Underground
11 Шаблон:Stl કાલુપુર રેલ્વે સ્ટેશન 30 September 2022 Ahmedabad Junction railway station and Mumbai–Ahmedabad high-speed rail corridor[21] Underground
12 Шаблон:Stl કાંકરિયા પૂર્વ December 2023 None Underground
13 Шаблон:Stl એપેરલ પાર્ક 4 March 2019 None Elevated
14 Шаблон:Stl અમરાઈવાડી 18 May 2019 None Elevated
15 Шаблон:Stl રબારી કોલોની 4 March 2019 Ahmedabad BRTS[22] Elevated
16 Шаблон:Stl વસ્ત્રાલ 4 March 2019 None Elevated
17 Шаблон:Stl નિરાંત ક્રોસ રોડ 4 March 2019 None Elevated
18 Шаблон:Stl વસ્ત્રાલ ગામ 4 March 2019 None Elevated

Construction

The Gujarat Metro Rail Corporation (GMRC) Limited has divided the construction work of the 20.73 km long Blue Line of Ahmedabad Metro into multiple construction packages.

The list of contractors is as follows:

Sr. No Package No. of Stations Contractor
1. Vastral GamApparel Park Viaduct only J. Kumar Infraprojects
2. Vastral GamApparel Park 6 DRA Infracon-CICO JV
3. Apparel Park Depot Depot only URC Construction
4. Kalupur – West Ramp 2 Larsen and Toubro
5. ThaltejThaltej Gam 2 DRA Infracon
6. East Ramp – Kalupur 2 Afcons Infrastructure